Parking Structure 1

PDC Contacts

Project Manager: Daneca Stevens - (951) 827-2788

Project Manager: John Franklin - (951) 827-1270

Planner: Jaime Engbrecht - (951) 827-2421


Project Description

  • 4 level parking structure and reconfiguration of existing surface parking on Lot 13
  • Approximately 1,287 (800 net new) parking stalls
  • Approximately 104 electric vehicle charging stations
  • Parking guidance system
  • Bicycle Parking
  • Pedestrian and bicycle pathways to campus
  • Provisions for future solar panel arrays
  • Good Neighbor features (includes a subterranean parking level on the eastern edge of the structure reducing visual impact and overall height; headlight screening; full cut off light fixtures; landscape screening, etc.)
  • Parksmart Silver Certification 

Parking Structure 1 Photo Gallery

Parking Structure 1 - Current Activity

Current Activity

  • Construction Documents
  • Earthwork
  • Installation of aggregate piers
  • Structural footings

 

 

Next Steps

  • Utility relocations and connections
  • Form placing
  • Concrete pouring

Construction Notices

  • See Construction Alerts for current activities
  • Anticipate closure of eastern portion of Lot 13
  • Anticipate impact to all parking permit holders

Parking Structure 1 Timeline

Parking Structure 1 Updates

  • Construction Alert #1

    956553 PS1 Construction Alert #1

    Please be advised that the following activities will be occurring from 7:00AM to 6:00PM on the eastern portion of Lot 13 and adjacent areas during the week of January 29th through February 7th.

    • Site fence installation;
    • Live feed camera installation;
    • Site office trailer delivery;
    • Material and equipment deliveries;
    • Site control survey;
    • Stormwater Pollution Prevention Plan (SWPPP) installation;
    • Selective site demo.

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Parking Structure 1 Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #2

    956553 PS1 Construction Alert #2

    Please be advised that the following activities will be occurring from 7:00AM to 6:00PM on the eastern portion of Lot 13 and adjacent areas during the week of February 19th through February 28th.

    • Material and equipment deliveries;
    • Site demolition;
    • Stormwater Pollution Prevention Plan (SWPPP) installation;
    • Site and utilities excavation

    Continuous noises on site: Heavy construction equipment such as loaders and scrapers (back-up alarms), delivery trucks (back-up alarms), forklifts, boom lifts, saws, and hammers.