Breadcrumb

School of Business New Building

The new School of Business building complex will be a flagship facility, serving as the permanent home for the School. The building will complement the School of Business’ existing space program and fully address enrollment-driven needs in pursuit of their aspiration to become the premier center of management research and education in the Inland Empire.


Project Scope:

The proposed building will provide about 38,500 ASF within approximately to 63,400 GSF, along with exterior circulation and gathering areas. The program includes the following spaces:

  • Classrooms and Educational Spaces
  • Student Support Spaces
  • Academic Offices and Support Spaces
  • Administrative Offices and Support Spaces
  • Shared Building Resources (Lobby, Multipurpose room(s) etc)

School of Business Project Updates

  • 950592 UCR SBB - Construction Alert #67

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Exterior Framing – East Elevation

    NA

    NA

    SBB (Lot 8)

    F/R/P Stair Treads/Landings – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Exterior Framing - North Elevation – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation & Air Water Barrier – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Field Measure for Curtain Wall – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Flashings / Window Surrounds – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Erect Steel Structure for Stairs – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation & Air Water Barrier– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Exterior Framing - South Elevation– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Field Measure for Curtain Wall– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Flashings / Window Surrounds– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Drainage Layer– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Cement Board– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Secondary Air Barrier– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Erect Stairs– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation– INT-L1

    NA

    NA

    SBB (Lot 8)

    Pressure Test Hot/Cold Supply & Return Mech Lines– INT-L1

    NA

    NA

    SBB (Lot 8)

    Insulate Test Hot/Cold Supply & Return Mech Lines– INT-L1

    NA

    NA

    SBB (Lot 8)

    HVAC Ductwork, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Controls Hook-up Equipment (Incl. Refrigerant Alarm) – MECH-L1

    NA

    NA

    SBB (Lot 8)

    HVAC Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Plumbing Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Set Distribution Board HDP-1A – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Hang Drywall – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Tape Walls – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Prime & 1st Coat of Paint, Walls & Exposed Ceilings – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Install Hot/Cold Supply & Return Mech Lines & Seismic – INT-L2

    NA

    NA

    SBB (Lot 8)

    Pressure Test Ductwork– INT-L2

    NA

    NA

    SBB (Lot 8)

    Install O/H Electrical Home Runs – INT-L2

    NA

    NA

    SBB (Lot 8)

    Tape Walls – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall– ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Fire Tape – INT-L4

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install O/H Waste and Vent – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Insulation and Inspect – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    Hang Drywall and Inspect – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    Tape Walls – ELEC-L4

    NA

    NA

     

    Week of February 26, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Electrical Hook-up Equipment

    NA

    NA

    SBB (Lot 8)

    Install PV Panel Secondary Framing - North of E Line

    Crane

    Noise Due to Equipment

    SBB (Lot 8)

    HVAC Piping, Hook-up & Insulation

    NA

    NA

    SBB (Lot 8)

    Flashings / Window Surrounds – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Drainage Layer – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Cement Board – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation & Air Water Barrier – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Field Measure for Curtain Wall – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Flashings / Window Surrounds – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Drainage Layer – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install O/H Electrical Home Runs – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation – INT-L1

    NA

    NA

    SBB (Lot 8)

    HVAC Ductwork, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Controls Hook-up Equipment – MECH-L1

    NA

    NA

    SBB (Lot 8)

    HVAC Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Plumbing Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Install Hot/Cold Domestic Water Lines & Seismic – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Tape Walls – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Hot/Cold Domestic Water Lines & Seismic – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Waste & Vent – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-L3

    NA

    NA

    SBB (Lot 8)

    Tape Walls – ELEC-L3

    NA

    NA

     

    Week of March 4, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    HVAC Ductwork, Hook-up & Insulation

    NA

    NA

    SBB (Lot 8)

    Stuff & Spray Deck Edge

    NA

    NA

    SBB (Lot 8)

    Install PV Panel System - South of E Line

    NA

    NA

    SBB (Lot 8)

    Curtain Wall – Frames – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Set Thin Brick – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Curtain Wall – Frames – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Punched Openings – Glass – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Secondary Air Barrier – EXT-SW

    NA

    NA

    SBB (Lot 8)

    F/R/P Stair Treads/Landings – EXT-SW

    NA

    NA

    SBB (Lot 8)

    HVAC Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Plumbing Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Pull Low Voltage Cable – INT-L1

    NA

    NA

    SBB (Lot 8)

    Pull Electrical – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Install O/H Electrical Home Runs – INT-L2

    NA

    NA

    SBB (Lot 8)

    Insulate Test Hot/Cold Supply & Return Mech Lines – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Conduit – ELEC-L2

    NA

    NA

    SBB (Lot 8)

    Install O/H Hot/Cold Supply & Return Branch Mech Lines & Seismic – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Electrical Home Runs – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Lights and Receptacles - ELEV

    NA

    NA

    SBB (Lot 8)

    F/R/P Site Walls – Anderson Park

    NA

    NA

     

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently

    Lot 8

    Lot 43

    Lot 43

    Indefinitely

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #66

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Install PV Panel Secondary Framing - South of E Line

    Crane

    Noise Due to Equipment

    SBB (Lot 8)

    Set Mechanical Equipment - Roof

    Crane

    Noise Due to Equipment

    SBB (Lot 8)

    Flashings / Window Surrounds – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Drainage Layer – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Cement Board – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Exterior Framing – East Elevation

    NA

    NA

    SBB (Lot 8)

    F/R/P Stair Treads/Landings – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Exterior Framing - North Elevation – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation & Air Water Barrier – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Field Measure for Curtain Wall – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Flashings / Window Surrounds – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Erect Steel Structure for Stairs – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation & Air Water Barrier– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Exterior Framing - South Elevation– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Field Measure for Curtain Wall– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Flashings / Window Surrounds– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Drainage Layer– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Cement Board– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Secondary Air Barrier– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Erect Stairs– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install O/H Hot/Cold Supply and Return Branch Mech Lines – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation– INT-L1

    NA

    NA

    SBB (Lot 8)

    Pressure Test Hot/Cold Supply & Return Mech Lines– INT-L1

    NA

    NA

    SBB (Lot 8)

    Insulate Test Hot/Cold Supply & Return Mech Lines– INT-L1

    NA

    NA

    SBB (Lot 8)

    HVAC Ductwork, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Controls Hook-up Equipment (Incl. Refrigerant Alarm) – MECH-L1

    NA

    NA

    SBB (Lot 8)

    HVAC Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Plumbing Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Set Distribution Board HDP-1A – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Frame Remaining Walls, Soffits & Hard lids – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Insulation & Inspect - AUD

    NA

    NA

    SBB (Lot 8)

    Install Backing – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Install Insulation & Inspect – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Hang Drywall & Inspect – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Install Hot/Cold Domestic Water Lines & Seismic – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Waste & Vent – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Backing – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Install Insulation & Inspect – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Hang Drywall and Inspect – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Hang 1st Side Top Down Drywall – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Insulation and Inspect – INT-L4

    NA

    NA

    SBB (Lot 8)

    Hang 2nd Side Top Down Drywall & Inspect– INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Mechanical / FSD's – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Electrical – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    Install Backing – ELEC-L4

    NA

    NA

     

    Week of February 19, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Exterior Framing – East Elevation

    NA

    NA

    SBB (Lot 8)

    F/R/P Stair Treads/Landings – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Exterior Framing - North Elevation – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation & Air Water Barrier – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Field Measure for Curtain Wall – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Flashings / Window Surrounds – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Erect Steel Structure for Stairs – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation & Air Water Barrier– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Exterior Framing - South Elevation– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Field Measure for Curtain Wall– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Flashings / Window Surrounds– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Drainage Layer– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Cement Board– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Secondary Air Barrier– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Erect Stairs– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation– INT-L1

    NA

    NA

    SBB (Lot 8)

    Pressure Test Hot/Cold Supply & Return Mech Lines– INT-L1

    NA

    NA

    SBB (Lot 8)

    Insulate Test Hot/Cold Supply & Return Mech Lines– INT-L1

    NA

    NA

    SBB (Lot 8)

    HVAC Ductwork, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Controls Hook-up Equipment (Incl. Refrigerant Alarm) – MECH-L1

    NA

    NA

    SBB (Lot 8)

    HVAC Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Plumbing Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Set Distribution Board HDP-1A – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Hang Drywall – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Tape Walls – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Prime & 1st Coat of Paint, Walls & Exposed Ceilings – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Install Hot/Cold Supply & Return Mech Lines & Seismic – INT-L2

    NA

    NA

    SBB (Lot 8)

    Pressure Test Ductwork– INT-L2

    NA

    NA

    SBB (Lot 8)

    Install O/H Electrical Home Runs – INT-L2

    NA

    NA

    SBB (Lot 8)

    Tape Walls – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall– ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Fire Tape – INT-L4

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install O/H Waste and Vent – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Insulation and Inspect – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    Hang Drywall and Inspect – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    Tape Walls – ELEC-L4

    NA

    NA

     

    Week of February 26, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Electrical Hook-up Equipment

    NA

    NA

    SBB (Lot 8)

    Install PV Panel Secondary Framing - North of E Line

    NA

    NA

    SBB (Lot 8)

    HVAC Piping, Hook-up & Insulation

    NA

    NA

    SBB (Lot 8)

    Flashings / Window Surrounds – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Drainage Layer – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Cement Board – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation & Air Water Barrier – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Field Measure for Curtain Wall – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Flashings / Window Surrounds – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Drainage Layer – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install O/H Electrical Home Runs – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation – INT-L1

    NA

    NA

    SBB (Lot 8)

    HVAC Ductwork, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Controls Hook-up Equipment – MECH-L1

    NA

    NA

    SBB (Lot 8)

    HVAC Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Plumbing Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Install Hot/Cold Domestic Water Lines & Seismic – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Tape Walls – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply & Return Ductwork Branch & Seismic – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install Hot/Cold Domestic Water Lines & Seismic – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Waste & Vent – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-L3

    NA

    NA

    SBB (Lot 8)

    Tape Walls – ELEC-L3

    NA

    NA

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently

    Lot 8

    Lot 43

    Lot 43

    Indefinitely

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #65

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Install PV Panel Structural Steel

    Crane

    Noise Due to Equipment

    SBB (Lot 8)

    Erect Stairs – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Install Metal Decking – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply and Return Ductwork – L1

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply and Return Mech Lines –L1

    NA

    NA

    SBB (Lot 8)

    Pressure Test Ductwork – INT-L1

    NA

    NA

    SBB (Lot 8)

    Tape Walls – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Plumbing – AUD

    NA

    NA

    SBB (Lot 8)

    Install Storm, Overflow, Sewer Lines and Seismic – AUD

    NA

    NA

    SBB (Lot 8)

    Install Mechanical / FSD’s – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Electrical – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Install O/H Waste and Vent – INT-L2

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply and Return Ductwork – INT-L2

    NA

    NA

    SBB (Lot 8)

    Tape Walls – ELEC-L2

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall – ELEC-L2

    NA

    NA

    SBB (Lot 8)

    Install Early MEP to Support Top Down Drywall - INT-L3

    NA

    NA

    SBB (Lot 8)

    Hang 1st Side Top Down Drywall - INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Insulation & Inspect - INT-L3

    NA

    NA

    SBB (Lot 8)

    Fire Tape - INT-L3

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall - INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Mechanical / FSD's – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Electrical – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Frame Interference Walls & Install Door Frames – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Early MEP to Support Top Down Drywall – INT-L4

    NA

    NA

     

    Week of February 12, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Install PV Panel Secondary Framing - South of E Line

    Crane

    Noise Due to Equipment

    SBB (Lot 8)

    Set Mechanical Equipment - Roof

    Crane

    Noise Due to Equipment

    SBB (Lot 8)

    Flashings / Window Surrounds – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Drainage Layer – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Cement Board – EXT-L1

    NA

    NA

    SBB (Lot 8)

    Exterior Framing – East Elevation

    NA

    NA

    SBB (Lot 8)

    F/R/P Stair Treads/Landings – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Exterior Framing - North Elevation – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation & Air Water Barrier – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Field Measure for Curtain Wall – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Flashings / Window Surrounds – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Erect Steel Structure for Stairs – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation & Air Water Barrier– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Exterior Framing - South Elevation– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Field Measure for Curtain Wall– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Flashings / Window Surrounds– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Drainage Layer– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Cement Board– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Secondary Air Barrier– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Erect Stairs– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install O/H Hot/Cold Supply and Return Branch Mech Lines – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation– INT-L1

    NA

    NA

    SBB (Lot 8)

    Pressure Test Hot/Cold Supply & Return Mech Lines– INT-L1

    NA

    NA

    SBB (Lot 8)

    Insulate Test Hot/Cold Supply & Return Mech Lines– INT-L1

    NA

    NA

    SBB (Lot 8)

    HVAC Ductwork, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Controls Hook-up Equipment (Incl. Refrigerant Alarm) – MECH-L1

    NA

    NA

    SBB (Lot 8)

    HVAC Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Plumbing Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Set Distribution Board HDP-1A – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Frame Remaining Walls, Soffits & Hard lids – INT-L1

    NA

    NA

    SBB (Lot 8)

    Install Insulation & Inspect - AUD

    NA

    NA

    SBB (Lot 8)

    Install Backing – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Install Insulation & Inspect – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Hang Drywall & Inspect – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Install Hot/Cold Domestic Water Lines & Seismic – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Waste & Vent – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install O/H Mechanical Equipment & Ductwork Mains & Seismic – INT-L3

    NA

    NA

    SBB (Lot 8)

    Install Backing – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Install Insulation & Inspect – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Hang Drywall and Inspect – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Hang 1st Side Top Down Drywall – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Insulation and Inspect – INT-L4

    NA

    NA

    SBB (Lot 8)

    Hang 2nd Side Top Down Drywall & Inspect– INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Mechanical / FSD's – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Electrical – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    Install Backing – ELEC-L4

    NA

    NA

     

    Week of February 19, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Exterior Framing – East Elevation

    NA

    NA

    SBB (Lot 8)

    F/R/P Stair Treads/Landings – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Exterior Framing - North Elevation – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation & Air Water Barrier – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Field Measure for Curtain Wall – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Flashings / Window Surrounds – EXT-NE

    NA

    NA

    SBB (Lot 8)

    Erect Steel Structure for Stairs – EXT-SW

    NA

    NA

    SBB (Lot 8)

    Rigid Insulation & Air Water Barrier– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Exterior Framing - South Elevation– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Field Measure for Curtain Wall– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Flashings / Window Surrounds– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Drainage Layer– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Cement Board– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Secondary Air Barrier– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Erect Stairs– EXT-SW

    NA

    NA

    SBB (Lot 8)

    Install Ductwork Insulation– INT-L1

    NA

    NA

    SBB (Lot 8)

    Pressure Test Hot/Cold Supply & Return Mech Lines– INT-L1

    NA

    NA

    SBB (Lot 8)

    Insulate Test Hot/Cold Supply & Return Mech Lines– INT-L1

    NA

    NA

    SBB (Lot 8)

    HVAC Ductwork, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Controls Hook-up Equipment (Incl. Refrigerant Alarm) – MECH-L1

    NA

    NA

    SBB (Lot 8)

    HVAC Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Plumbing Piping, Hook-up & Insulation – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Set Distribution Board HDP-1A – MECH-L1

    NA

    NA

    SBB (Lot 8)

    Hang Drywall – INT-AUD

    NA

    NA

    SBB (Lot 8)

    Tape Walls – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Prime & 1st Coat of Paint, Walls & Exposed Ceilings – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    Install Hot/Cold Supply & Return Mech Lines & Seismic – INT-L2

    NA

    NA

    SBB (Lot 8)

    Pressure Test Ductwork– INT-L2

    NA

    NA

    SBB (Lot 8)

    Install O/H Electrical Home Runs – INT-L2

    NA

    NA

    SBB (Lot 8)

    Tape Walls – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall– ELEC-L3

    NA

    NA

    SBB (Lot 8)

    Fire Tape – INT-L4

    NA

    NA

    SBB (Lot 8)

    Fire Caulk Head of Wall – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install O/H Waste and Vent – INT-L4

    NA

    NA

    SBB (Lot 8)

    Install Insulation and Inspect – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    Hang Drywall and Inspect – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    Tape Walls – ELEC-L4

    NA

    NA

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently

    Lot 8

    Lot 43

    Lot 43

    Indefinitely

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #64

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    INSTALL PV STRUCTURAL STEEL

    NA

    NA

    SBB (Lot 8)

    PROCURE EXTERIOR FLASHINGS

    NA

    NA

    SBB (Lot 8)

    WEATHER BARRIER – EXT-NE

    NA

    NA

    SBB (Lot 8)

    ERECT STAIR – EXT-NE

    NA

    NA

    SBB (Lot 8) Concrete

    EXTERIOR FRAMING – EXT-NE

    NA

    NA

    SBB (Lot 8)

    INSTALL METAL DECKING – EXT-SW

    NA

    NA

    SBB (Lot 8)

    INSTALL HOT/COLD DOMESTIC WATER LINES AND SEISMIC – INT-L1

    NA

    NA

    SBB (Lot 8)

    INSTALL O/H SUPPLY AND RETURN DUCTWORK BRANCH AND SEISMIC – INT-L1

    NA

    NA

    SBB (Lot 8)

    PRESSURE TEST DUCTOWRK – INT-L1

    NA

    NA

    SBB (Lot 8)

    INSTALL O/H ELECTRICAL HOME RUNS – INT-L1

    NA

    NA

    SBB (Lot 8)

    FIRE CAULKING HEAD OF WALL – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    INSTALL IN-WALL AND BRANCH ELECTRICAL – AUDITORIUM

    NA

    NA

    SBB (Lot 8)

    INSTALL IN-WALL LOW VOLTAGE – AUDITORIUM

    NA

    NA

    SBB (Lot 8)

    INSTALL IN-WALL PLUMBING – AUDITORIUM

    NA

    NA

    SBB (Lot 8)

    INSTALL INSULATION AND INSPECT – AUDITORIUM

    NA

    NA

    SBB (Lot 8)

    INSTALL MECHANICAL / FSD’s – AUDITORIUM

    NA

    NA

    SBB (Lot 8)

    INSTALL O/H WASTE AND VENT – ELEC-L2

    NA

    NA

    SBB (Lot 8)

    HANG DRYWALL AND INSPECT – ELEC-L2

    NA

    NA

    SBB (Lot 8)

    INSTALL INSULATION AND INSPECT – ELECT-L2

    NA

    NA

    SBB (Lot 8)

    TAPE WALLS – ELECT-L2

    NA

    NA

    SBB (Lot 8)

    INSTALL EARLY MEP TO SUPPORT TOP DOWN DRYWALL – INT-L3

    NA

    NA

    SBB (Lot 8)

    HANG 1ST SIDE TOP-DOWN DRYWALL – INT-L3

    NA

    NA

    SBB (Lot 8)

    HANG 2ND SIDE TOP-DOWN DRYWALL AND INSPECT – INT-L3

    NA

    NA

    SBB (Lot 8)

    INSTALL INSULATION AND INSPECT – INT-L3

    NA

    NA

    SBB (Lot 8)

    FIRE TAPE – INT-L3

    NA

    NA

    SBB (Lot 8)

    FIRE CAULKING HEAD OF WALL – INT-L3

    NA

    NA

    SBB (Lot 8)

    INSTALL MECHANICAL / FSD’s – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    INSTALL IN-WALL ELECTRICAL – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    INSTALL BACKING – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    INSTALL EARLY MEP TO SUPPORT TOP-DOWN DRYWALL – INT-L4

    NA

    NA

    SBB (Lot 8)

    HANG 1ST SIDE TOP-DOWN DRYWALL – INT-L4

    NA

    NA

    SBB (Lot 8)

    INSTALL INSULATION AND INSPECT – INT-L4

    NA

    NA

    SBB (Lot 8)

    F/R/P TRANSFORMER YARD SLAB

    Concrete Pump

    Noise due to equipment

     

    Week of February 5, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    INSTALL ROOFING AT MECHANICAL EQUIPMETN PAD

    NA

    NA

    SBB (Lot 8)

    INSTALL PV PANEL SECONDARY FRAMING

    NA

    NA

    SBB (Lot 8)

    FLASHING / WINDOW SURROUNDS – EXT-L1

    NA

    NA

    SBB (Lot 8)

    DRAINING LAYER – EXT-L1

    NA

    NA

    SBB (Lot 8)

    PRECAST PANELS – EXT-L1

    NA

    NA

    SBB (Lot 8)

    F/R/P TAIR TREAD/LANDINGS – EXT-NE

    NA

    NA

    SBB (Lot 8)

    EXTERIOR FRAMING – NORTH ELEVATION

    NA

    NA

    SBB (Lot 8)

    RIGID INSULATION AND AIR WATER BARRIER – EXT-NE

    NA

    NA

    SBB (Lot 8)

    ERECT STEEL STRUCTURE FOR STAIRS – EXT-SW

    NA

    NA

    SBB (Lot 8)

    INSTALL O/H HOT/COLD SUPPLY AND RETURN BRANCH MECH LINES – INT-L1

    NA

    NA

    SBB (Lot 8)

    INSTALL DUCTWORK INSULATION – INT-L1

    NA

    NA

    SBB (Lot 8)

    PRESSURE TEST HOT/COLD SUPPLY AND RETURN MECH LINES – INT-L1

    NA

    NA

    SBB (Lot 8)

    PRIME AND 1ST COAT OF PAINT, WALLS, AND EXPOSED CEILINGS – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    INSTALL ELECTRICAL GEAR – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    HANG DRYWALL – AUDITORIUM

    NA

    NA

    SBB (Lot 8)

    INSTALL IN-WALL ELECTRICAL – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    INSTALL BACKING – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    INSTALL INSULATION AND INSEPCT – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    HANG DRYWALL AND INSPECT – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    INSTALL O/H SUPPLY AND RETURN DUCTOWRK BRANCH AND SEISMIC – INT-L2

    NA

    NA

    SBB (Lot 8)

    FIRE CAULKING HEAD OF WALL – ELEC-L2

    NA

    NA

    SBB (Lot 8)

    PRIME AND FIRST COAT OF PAINT WALLS AND EXPOSED CEILINGS – ELEC-L2

    NA

    NA

    SBB (Lot 8)

    INSTALL HOT/COLD DOMESTIC WATER LINES – INT-L3

    NA

    NA

    SBB (Lot 8)

    INSTALL O/H WASTE AND VENT – INT-L3

    NA

    NA

    SBB (Lot 8)

    INSTALL O/H MECH EQUIPMENT AND DUCTWORK MAINS AND SEISMIC – INT-L3

    NA

    NA

    SBB (Lot 8)

    INSTALL INSULATION AND INSPECT – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    HANG DRYWALL AND INSPECT – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    TAPE WALLS – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    HANG 2ND SIDE TOP DOWN DRYWALL AND INSPECT – INT-L4

    NA

    NA

    SBB (Lot 8)

    FIRE TAPE – INT-L4

    NA

    NA

    SBB (Lot 8)

    FIRE CAULKING HEAD OF WALL – INT-L4

    NA

    NA

    SBB (Lot 8)

    INSTALL MECHANICAL / FSD’s – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    ISTALL IN-WALL ELECTRICAL – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    INSTALL BACKING – ELEC-L4

    NA

    NA

     

    Week of February 12, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    SET MECHANICAL EQUIPMENT – ROOF

    NA

    NA

    SBB (Lot 8)

    ELECTRICAL HOOKUP EQUPMENT – ROOF

    NA

    NA

    SBB (Lot 8)

    INSTALL PV PANEL SECONDARY FRAMING – ROOF

    NA

    NA

    SBB (Lot 8)

    FLASHING / WINDOW SURROUNDS – EXT-L1

    NA

    NA

    SBB (Lot 8)

    DRAINAGE LAYER – EXT-L1

    NA

    NA

    SBB (Lot 8)

    CEMENT BOARD – EXT-L1

    NA

    NA

    SBB (Lot 8)

    ELECRCIAL ROUGH-IN SOFFITS – EXT-L1

    NA

    NA

    SBB (Lot 8)

    SOFFIT SHEATHING – EXT-L1

    NA

    NA

    SBB (Lot 8)

    F/R/P STAIR TREADS / LANDINGS

    NA

    NA

    SBB (Lot 8)

    EXTERIOR FRAMING – NORTH ELECATION – EXT-L1

    NA

    NA

    SBB (Lot 8)

    RIGID INSULATION AND AIR WATER BARRIER – EXT-NE

    NA

    NA

    SBB (Lot 8)

    FIELD MEASURE FOR CURTAIN WALL – EXT-NE

    NA

    NA

    SBB (Lot 8)

    ERRECT STEEL STRUCTURE FOR STAIRS

    NA

    NA

    SBB (Lot 8)

    RIGID INSULATION AND AIR WATER BARRIER – EXT-SW

    NA

    NA

    SBB (Lot 8)

    EXTERIOR FRAMING – SOUTH ELEVATION

    NA

    NA

    SBB (Lot 8)

    FIELD MEASURE FOR CURTAIN WALL

    NA

    NA

    SBB (Lot 8)

    FLASHINGS / WINDOW SURROUNDS – EXT-SW

    NA

    NA

    SBB (Lot 8)

    INSTALL O/H ELECTRICAL HOME RUNS – INT-L1

    NA

    NA

    SBB (Lot 8)

    INSTALL O/H HOT/COLD SUPPLY AND RETURN BRNCH MECH LINES – INT-L1

    NA

    NA

    SBB (Lot 8)

    INSTALL DUCTWORK INSULATION – INT-L1

    NA

    NA

    SBB (Lot 8)

    PRESSURE TEST HOT/COLD SUPPLY AND RETURN MECH LINES – INT-L1

    NA

    NA

    SBB (Lot 8)

    SET MECHANICAL AND PLUMBING EQUIPMENT – MECH-L1

    NA

    NA

    SBB (Lot 8)

    HVAC DUCTWORK, HOOKUP, AND INSULATION – MECH-L1

    NA

    NA

    SBB (Lot 8)

    CONTROLS HOOK-UP EQUIPMENT – MECH-L1

    NA

    NA

    SBB (Lot 8)

    HANG DRYWALL AND INSPECT – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    TAPE WALLS – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    HANG 1ST SIDE TOP DOWN DRYWALL – INT-L4

    NA

    NA

    SBB (Lot 8)

    INSTALL INSULATION AND INSPECT – INT-L4

    NA

    NA

    SBB (Lot 8)

    HANG 2ND SIDE TOP DOWN DRYWALL AND INSPECT – INT-L4

    NA

    NA

    SBB (Lot 8)

    FIRE TAPE – INT-L4

    NA

    NA

    SBB (Lot 8)

    FIRE CAULK HEAD OF WALL – INT-L4

    NA

    NA

    SBB (Lot 8)

    INSTALL IN-WALL ELECTRICAL – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    INSTALL BACKING – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    INSTALL COMMUNICATIONS DUCTBANK AND VAULT FROM MH-14 TO SBB POC

    NA

    NA

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently

    Lot 8

    Lot 43

    Lot 43

    Indefinitely

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #63

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    INSTALL MECHANICAL DUCT / PIPE SUPPORTS - ROOF

    NA

    NA

    SBB (Lot 8) 

    RIGID INSULATION AND AIR WATER BARRIER – EXT-L1 

    NA

    NA

    SBB (Lot 8)

    FIELD MEASURE FOR CURTAIN WALL – EXT-L1

    NA

    NA

    SBB (Lot 8)

    SOFFIT SHEATHING – EXT-L1

    NA

    NA

    SBB (Lot 8) Concrete

    SET SCAFFOLDS FOR LEVEL TO ROOF – EXT-NE

    NA

    NA

    SBB (Lot 8)

    MISC IN-WALL STEEL FOR CANOPY – EXT-NE

    NA

    NA

    SBB (Lot 8)

    ERECT STEEL STRUCTURE FOR STAIRS – EXT-NE

    NA

    NA

    SBB (Lot 8)

    ERECT SCAFFOLD EAST ELEVATION – EXT-NE

    NA

    NA

    SBB (Lot 8)

    SET SCAFFOLD FOR LEVEL 3 TO ROOF

    NA

    NA

    SBB (Lot 8)

    INSTALL IN-WALL ELECTRICAL – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    INSTALL INSULATION AND ISNEPCT – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    HANG DRYWALL AND ISNTEPCT – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    TAPE WALLS – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    SET MECHANICAL AND PLUMBING EQUIPMENT – MECH-L1

    NA

    NA

    SBB (Lot 8)

    FRAME WALLS – AUDITORIUM

    NA

    NA

    SBB (Lot 8)

    TOP-DOWN DRYWALL AND HEAD OF WALL – AUDITORIUM

    NA

    NA

    SBB (Lot 8) 

    FIRE TAPE – INT-L2

    NA

    NA

    SBB (Lot 8)

    FIRE CAULK HEAD OF WALL – INT-L2

    NA

    NA

    SBB (Lot 8)

    INSTALL HOT/COLD DOMESTIC WATER LINES AND SEISMIC – INT-L2

    NA

    NA

    SBB (Lot 8)

    INSTALL O/H MECHANICAL EQUIPMENT AND DUCTWORK MAINS AND SEISMIC – INT-L2

    NA

    NA

    SBB (Lot 8)

    INSTALL MECHANICAL / FSDs – ELEC-L2

    NA

    NA

    SBB (Lot 8)

    INSTALL BACKING – ELEC-L2

    NA

    NA

    SBB (Lot 8)

    FRAME INTERFERENCE WALLS AND INSTALL DOOR FRAMES – INT-L3

    NA

    NA

    SBB (Lot 8)

    INSTALL FIRE SPRINKLER MAINS, BRANCHES, AND SEISIC – INT-L3

    NA

    NA

    SBB (Lot 8)

    INSTALL STORM, OVERFLOW, SEWER LINES, AND SEISMIC – INT-L3

    NA

    NA

    SBB (Lot 8)

    TRANSFORMER YARD FENCE FOOTING

    NA

    NA

     

    Week of January 29, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    INSTALL PV STRUCTURAL STEEL

    NA

    NA

    SBB (Lot 8) 

    PROCURE EXTERIOR FLASHINGS

    NA

    NA

    SBB (Lot 8) 

    WEATHER BARRIER – EXT-NE

    NA

    NA

    SBB (Lot 8)

    ERECT STAIR – EXT-NE

    NA

    NA

    SBB (Lot 8)

    EXTERIOR FRAMING – EXT-NE

    NA

    NA

    SBB (Lot 8) 

    INSTALL METAL DECKING – EXT-SW

    NA

    NA

    SBB (Lot 8)

    INSTALL HOT/COLD DOMESTIC WATER LINES AND SEISMIC – INT-L1

    NA

    NA

    SBB (Lot 8)

    INSTALL O/H SUPPLY AND RETURN DUCTWORK BRANCH AND SEISMIC – INT-L1

    NA

    NA

    SBB (Lot 8)

    PRESSURE TEST DUCTOWRK – INT-L1

    NA

    NA

    SBB (Lot 8)

    INSTALL O/H ELECTRICAL HOME RUNS – INT-L1

    NA

    NA

    SBB (Lot 8)

    FIRE CAULKING HEAD OF WALL – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    INSTALL IN-WALL AND BRANCH ELECTRICAL – AUDITORIUM

    NA

    NA

    SBB (Lot 8)

    INSTALL IN-WALL LOW VOLTAGE – AUDITORIUM

    NA

    NA

    SBB (Lot 8) 

    INSTALL IN-WALL PLUMBING – AUDITORIUM

    NA

    NA

    SBB (Lot 8)

    INSTALL INSULATION AND INSPECT – AUDITORIUM

    NA

    NA

    SBB (Lot 8)

    INSTALL MECHANICAL / FSD’s – AUDITORIUM 

    NA

    NA

    SBB (Lot 8)

    INSTALL O/H WASTE AND VENT – ELEC-L2

    NA

    NA

    SBB (Lot 8)

    HANG DRYWALL AND INSPECT – ELEC-L2

    NA

    NA

    SBB (Lot 8)

    INSTALL INSULATION AND INSPECT – ELECT-L2

    NA

    NA

    SBB (Lot 8)

    TAPE WALLS – ELECT-L2

    NA

    NA

    SBB (Lot 8)

    INSTALL EARLY MEP TO SUPPORT TOP DOWN DRYWALL – INT-L3

    NA

    NA

    SBB (Lot 8)

    HANG 1ST SIDE TOP-DOWN DRYWALL – INT-L3

    NA

    NA

    SBB (Lot 8)

    HANG 2ND SIDE TOP-DOWN DRYWALL AND INSPECT – INT-L3

    NA

    NA

    SBB (Lot 8)

    INSTALL INSULATION AND INSPECT – INT-L3

    NA

    NA

    SBB (Lot 8)

    FIRE TAPE – INT-L3

    NA

    NA

    SBB (Lot 8)

    FIRE CAULKING HEAD OF WALL – INT-L3

    NA

    NA

    SBB (Lot 8)

    INSTALL MECHANICAL / FSD’s – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    INSTALL IN-WALL ELECTRICAL – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    INSTALL BACKING – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    INSTALL EARLY MEP TO SUPPORT TOP-DOWN DRYWALL – INT-L4

    NA

    NA

    SBB (Lot 8)

    HANG 1ST SIDE TOP-DOWN DRYWALL – INT-L4

    NA

    NA

    SBB (Lot 8)

    INSTALL INSULATION AND INSPECT – INT-L4

    NA

    NA

    SBB (Lot 8)

    F/R/P TRANSFORMER YARD SLAB

    NA

    NA

     

    Week of February 5, 2024

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) 

    INSTALL ROOFING AT MECHANICAL EQUIPMETN PAD 

    NA

    NA

    SBB (Lot 8) 

    INSTALL PV PANEL SECONDARY FRAMING

    NA

    NA

    SBB (Lot 8) 

    FLASHING / WINDOW SURROUNDS – EXT-L1

    NA

    NA

    SBB (Lot 8)

    DRAINING LAYER – EXT-L1

    NA

    NA

    SBB (Lot 8)

    PRECAST PANELS – EXT-L1

    NA

    NA

    SBB (Lot 8) 

    F/R/P TAIR TREAD/LANDINGS – EXT-NE

    NA

    NA

    SBB (Lot 8)

    EXTERIOR FRAMING – NORTH ELEVATION 

    NA

    NA

    SBB (Lot 8)

    RIGID INSULATION AND AIR WATER BARRIER – EXT-NE

    NA

    NA

    SBB (Lot 8)

    ERECT STEEL STRUCTURE FOR STAIRS – EXT-SW

    NA

    NA

    SBB (Lot 8)

    INSTALL O/H HOT/COLD SUPPLY AND RETURN BRANCH MECH LINES – INT-L1

    NA

    NA

    SBB (Lot 8)

    INSTALL DUCTWORK INSULATION – INT-L1

    NA

    NA

    SBB (Lot 8)

    PRESSURE TEST HOT/COLD SUPPLY AND RETURN MECH LINES – INT-L1

    NA

    NA

    SBB (Lot 8)

    PRIME AND 1ST COAT OF PAINT, WALLS, AND EXPOSED CEILINGS – ELEC-L1

    NA

    NA

    SBB (Lot 8) 

    INSTALL ELECTRICAL GEAR – ELEC-L1

    NA

    NA

    SBB (Lot 8)

    HANG DRYWALL – AUDITORIUM

    NA

    NA

    SBB (Lot 8)

    INSTALL IN-WALL ELECTRICAL – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    INSTALL BACKING – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    INSTALL INSULATION AND INSEPCT – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    HANG DRYWALL AND INSPECT – ELEC-AUD

    NA

    NA

    SBB (Lot 8)

    INSTALL O/H SUPPLY AND RETURN DUCTOWRK BRANCH AND SEISMIC – INT-L2

    NA

    NA

    SBB (Lot 8)

    FIRE CAULKING HEAD OF WALL – ELEC-L2

    NA

    NA

    SBB (Lot 8)

    PRIME AND FIRST COAT OF PAINT WALLS AND EXPOSED CEILINGS – ELEC-L2

    NA

    NA

    SBB (Lot 8)

    INSTALL HOT/COLD DOMESTIC WATER LINES – INT-L3

    NA

    NA

    SBB (Lot 8)

    INSTALL O/H WASTE AND VENT – INT-L3

    NA

    NA

    SBB (Lot 8)

    INSTALL O/H MECH EQUIPMENT AND DUCTWORK MAINS AND SEISMIC – INT-L3

    NA

    NA

    SBB (Lot 8)

    INSTALL INSULATION AND INSPECT – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    HANG DRYWALL AND INSPECT – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    TAPE WALLS – ELEC-L3

    NA

    NA

    SBB (Lot 8)

    HANG 2ND SIDE TOP DOWN DRYWALL AND INSPECT – INT-L4

    NA

    NA

    SBB (Lot 8)

    FIRE TAPE – INT-L4

    NA

    NA

    SBB (Lot 8)

    FIRE CAULKING HEAD OF WALL – INT-L4

    NA

    NA

    SBB (Lot 8)

    INSTALL MECHANICAL / FSD’s – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    ISTALL IN-WALL ELECTRICAL – ELEC-L4

    NA

    NA

    SBB (Lot 8)

    INSTALL BACKING – ELEC-L4

    NA

    NA

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.  Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Lot 8

    Lot 8

    Permanently 

    Lot 8

    Lot 43

    Lot 43

    Indefinitely 

    Lot 43

    Anderson Park

    Anderson Park

    Indefinitely

    Anderson Park

  • 950592 UCR SBB - Construction Alert #62

    Current Week

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8) Concrete

    F/R/P Walls at Transformer Yard

    Crane and Concrete Pump

    Noise due to equipment

    SBB (Lot 8) Concrete

    F/R/P Transformer Yard Slab

    Crane and Concrete Pump

    Noise due to equipment

    SBB (Lot 8)

    Vapor Retarder Sheet Air Barrier

    NA

    NA

    SBB (Lot 8)

    Flashing / Window Surrounds – Ext-L1

    NA

    NA

    SBB (Lot 8)

    Install Temp Roofing Low Roofs – Ext NE

    NA

    NA

    SBB (Lot 8)

    Erect Steel Structure for Stairs – Ext NE

    NA

    NA

    SBB (Lot 8)

    Set Scaffold to Roof – Ext NE

    NA

    NA

    SBB (Lot 8)

    Misc In-Wall Steel for Canopy – Ext NE

    NA

    NA

    SBB (Lot 8)

    Install Temp Roofing at Low Roofs– Ext SW

    NA

    NA

    SBB (Lot 8) Concrete

    Pour Grand Stair – Int-L1

    Concrete Pump

    Noise due to equipment

    SBB (Lot 8) Concrete

    Strip Grand Stair – Int-L1

    NA

    NA

    SBB (Lot 8)

    Install O/H Mechanical Equipment and Ductwork Mains and Seismic – Int-L1

    NA

    NA

    SBB (Lot 8)

    Install In-Wall Electrical – Int-L1

    NA

    NA

    SBB (Lot 8)

    Install Backing – Int-L1

    NA

    NA

    SBB (Lot 8)

    Layout Framing and Install Top Track – Int-Auditorium

    NA

    NA

    SBB (Lot 8)

    Hang 2nd Side Top Down Drywall and Inspect – Int-L2

    NA

    NA

    SBB (Lot 8)

    Fire Tape – Int-L2

    NA

    NA

    SBB (Lot 8)

    Fire Caulking Head of Wall – Int-L2

    NA

    NA

    SBB (Lot 8)

    Frame Interference Walls and Install Door Frames – Int-L3

    NA

    NA

    SBB (Lot 8)

    Concrete

    Pour CIP Stair to L4

    Concrete Pump

    Noise due to equipment

    SBB (Lot 8)

    Concrete

    Strip CIP Stair to L4

    NA

    NA

    SBB (Lot 8)

    Install Storm, Overflow, Sewer Lines and Seismic – Int-L4

    NA

    NA

     

    Week of January 22, 2023

    Construction Activities 

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    SBB (Lot 8)

    Install Roofing at mechanical Equipment Pad

    NA

    NA

    SBB (Lot 8)

    Drainage Layer – Ext-L1

    NA

    NA

    SBB (Lot 8)

    Cement Board – Ext-L1

    NA

    NA

    SBB (Lot 8)

    Weather Barrier – Ext-L1

    NA

    NA

    SBB (Lot 8) Concrete

    Erect Stairs – Ext-NE

    NA

    NA

    SBB (Lot 8)

    Exterior Framing – Ext-NE

    NA

    NA

    SBB (Lot 8)

    Erect Tube Steel Structure – Ext-SW

    NA

    NA

    SBB (Lot 8)

    Set Scaffold for Level 3 to Roof – Ext-SW

    NA

    NA

    SBB (Lot 8)

    Install Metal Decking – Ext-SW

    NA

    NA

    SBB (Lot 8)

    Install O/H Supply and Return Ductwork Branch and Seismic – Int-L1

    NA

    NA

    SBB (Lot 8)

    Install Hot and Cold Supply and Return Mech Lunes and Seismic – Int-L1

    NA

    NA

    SBB (Lot 8)

    Install Insulation and Inspect – Elec-L1

    NA

    NA

    SBB (Lot 8)

    Hang Drywall and Inspect – Elec-L1