North District Phase 2
The North District Phase 2 project is a joint initiative by UC Riverside and Riverside Community College aimed at addressing the increasing demand for on-campus housing for undergraduate and graduate students.
The project proposes to construct over 1,500 new apartment-style units, providing comfortable and modern living spaces for students. The project is being proposed in response to the growing need for affordable, safe, and convenient housing options for students. With the increasing number of students enrolled in UC Riverside and Riverside Community College, the demand for on-campus housing has exceeded the available options. As a result, many students are forced to seek off-campus housing, which may not always be affordable, safe, or convenient.
The proposed project seeks to address this issue by providing over 1,500 new beds in apartment-style units, which will be designed to meet the needs of undergraduate and graduate students. The units will be equipped with modern amenities and facilities, such as Wi-Fi, air conditioning, study areas, and communal spaces for socializing and relaxation.
The project is being proposed in partnership with Riverside Community College and is seeking funding through the State Higher Education Student Housing Grant Program. If the funding application is successful, the project will provide 652 beds for low-income UCR and RCCD students, ensuring that students from diverse backgrounds have access to safe and affordable housing options.
Overall, the North District Phase 2 project is an important initiative that will help to address the growing demand for on-campus housing for UC Riverside and Riverside Community College students. By providing modern and affordable housing options, the project will help integrate Riverside Community College students into UC Riverside campus and student community as well as help to create a more vibrant and inclusive campus community, while also ensuring that students have the resources they need to succeed academically.
Project Scope:
Program, design and construction of a new ~400,000 GSF buildings for undergraduate and graduate student housing.
North District Phase 2 Project Updates
-
950586B North District Phase 2 - Construction Alert #18
Week of April 22, 2024
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C
C-SOG1-115
Fine Grade - SOG #1
Excavator, Boom Lift
N/A
Bldg. C
C-SOG1-16
Layout & Sawcut Control Joints - SOG #1
Excavator, Boom Lift
N/A
Bldg. C
C-SOG1-175
Strip Slab on Grade - SOG #1
Excavator, Boom Lift
N/A
Bldg. C
C-SOG1-345
Cure - SOG #1 (Calendar Days)
Excavator, Boom Lift
N/A
Bldg. C
C-SOG2-185
Fine Grade - SOG #2
Excavator, Boom Lift
N/A
Bldg. C
C-SOG2-195
Edge Form Slab on Grade - SOG #2
Excavator, Boom Lift
N/A
Bldg. C
C-SOG2-255
Install Vapor Barrier - SOG #2
Excavator, Boom Lift
N/A
Bldg. C
C-SOG2-205
Rebar Slab on Grade - SOG #2
Excavator, Boom Lift
N/A
Bldg. C
C-SOG2-215
QC / Inspect Slab on Grade - SOG #2
Excavator, Boom Lift
N/A
Bldg. C
C-SOG3-325
Complete Remaining Utilities at Retaining Wall Backfill Zone
Excavator, Boom Lift
N/A
Bldg. C
C-SOG3-255
Fine Grade - SOG #3
Excavator, Boom Lift
N/A
Bldg. C
C-ML-160
F/R/P Manlift Pad
Excavator, Boom Lift
N/A
Bldg. C
C-ML-100
F/R/P Manlift Pad
Excavator, Boom Lift
N/A
Bldg. D
D-FTG1-150
Excavate - Footing Pour (South Leaveout Spreads)
Excavator, Boom Lift
N/A
Bldg. D
D-FTG1-160
Rebar - Footing Pour (South Leaveout Spreads)
Excavator, Boom Lift
N/A
Bldg. D
D-FTG1-170
Form - Footing Pour (South Leaveout Spreads)
Excavator, Boom Lift
N/A
Bldg. D
D-FTG1-180
QC / Inspect - Footing Pour (South Leaveout Spreads)
Excavator, Boom Lift
N/A
Bldg. D
D-FTG1-190
Pour - Footing Pour (South Leaveout Spreads)
Excavator, Boom Lift
N/A
Bldg. D
D-RW-295
Waterproof Retaining Walls - West of DN6
Excavator, Boom Lift
N/A
Bldg. D
D-RW-305
Perforated Drain Pipe / Rock - West of DN6
Excavator, Boom Lift
N/A
Bldg. D
D-RW-315
Backfill Retaining Walls - West of DN6
Excavator, Boom Lift
N/A
Bldg. D
D-CLMN-310
Rebar - Columns & Shear Walls at SOG #1 (South Leaveout Columns)
Excavator, Boom Lift
N/A
Bldg. D
D-CLMN-320
QC / Inspect - Columns & Shear Walls at SOG #1 (South Leaveout Columns)
Excavator, Boom Lift
N/A
Bldg. D
D-CLMN-330
Close Forms - Columns & Shear Walls at SOG #1 (South Leaveout Columns)
Excavator, Boom Lift
N/A
Bldg. D
D-CLMN-340
0 Pour - Columns & Shear Walls at SOG #1 (South Leaveout Columns)
Excavator, Boom Lift
N/A
Bldg. D
D-RW-385
Strip Retaining Walls – North
Excavator, Boom Lift
N/A
Bldg. D
D-RW-395
Waterproof Retaining Walls – North
Excavator, Boom Lift
N/A
Bldg. D
D-RW-405
Perforated Drain Pipe / Rock – North
Excavator, Boom Lift
N/A
Bldg. D
D-RW-415
Backfill Retaining Walls – North
Excavator, Boom Lift
N/A
Bldg. D
D-SOG1-100
0 Underslab Utilities at SOG #1
Excavator, Boom Lift
N/A
Bldg. D
D-SOG1-190
Complete Remaining Utilities at Retaining Wall Backfill Zone
Excavator, Boom Lift
N/A
Bldg. D
D-SOG1-110
0 Fine Grade - SOG #1
Excavator, Boom Lift
N/A
Bldg. D
D-SOG2-100
Underslab Utilities at SOG #2
Excavator, Boom Lift
N/A
Week of April 29, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C
C-SOG2-225
Pour Slab on Grade - SOG #2
Excavator, Boom Lift
N/A
Bldg. C
C-SOG2-235
Layout & Sawcut Control Joints - SOG #2
Excavator, Boom Lift
N/A
Bldg. C
C-SOG2-245
Strip Slab on Grade - SOG #2
Excavator, Boom Lift
N/A
Bldg. C
C-SOG2-335
Cure - SOG #2 (Calendar Days)
Excavator, Boom Lift
N/A
Bldg. C
C-SOG3-265
Edge Form Slab on Grade - SOG #3
Excavator, Boom Lift
N/A
Bldg. C
C-SOG3-335
Install Vapor Barrier - SOG #3
Excavator, Boom Lift
N/A
Bldg. C
C-SOG3-275
Rebar Slab on Grade - SOG #3
Excavator, Boom Lift
N/A
Bldg. D
D-SOG1-120
Edge Form Slab on Grade - SOG #1
Excavator, Boom Lift
N/A
Bldg. D
D-SOG1-180
Install Vapor Barrier - SOG #1
Excavator, Boom Lift
N/A
Bldg. D
D-SOG1-130
Rebar Slab on Grade - SOG #1
Excavator, Boom Lift
N/A
Bldg. D
D-SOG2-190
Complete Remaining Utilities at Retaining Wall Backfill Zone
Excavator, Boom Lift
N/A
Bldg. D
D-SOG2-110
Fine Grade - SOG #2
Excavator, Boom Lift
N/A
Week of May 6, 2024
Construction Activities
Bldg. D
D-SOG2-120
Edge Form Slab on Grade - SOG #2
Excavator, Boom Lift
N/A
Bldg. D
D-SOG2-130
Rebar Slab on Grade - SOG #2
Excavator, Boom Lift
N/A
Bldg. D
D-SOG2-140
QC / Inspect Slab on Grade - SOG #2
Excavator, Boom Lift
N/A
Bldg. D
D-SOG2-150
Pour Slab on Grade - SOG #2
Excavator, Boom Lift
N/A
Bldg. D
D-SOG2-160
Layout & Sawcut Control Joints - SOG #2
Excavator, Boom Lift
N/A
Bldg. D
D-SOG2-170
Strip Slab on Grade - SOG #2
Excavator, Boom Lift
N/A
Bldg. D
D-DECK-L2S-115
Deliver / Shake Out Elevated Deck Form Work
Excavator, Boom Lift
N/A
Bldg. D
D-DECK-L2S-125
Form Deck
Excavator, Boom Lift
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
-
950586B North District Phase 2 - Construction Alert #17
Week of April 15, 2024
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C
C-SOG1-115
Fine Grade - SOG #1
Excavator, Boom Lift
N/A
Bldg. C
C-SOG1-125
Edge Form Slab on Grade - SOG #1
Excavator, Boom Lift
N/A
Bldg. C
C-SOG1-135
Rebar Slab on Grade - SOG #1
Excavator, Boom Lift
N/A
Bldg. C
C-SOG1-145
QC / Inspect Slab on Grade - SOG #1
Excavator, Boom Lift
N/A
Bldg. C
C-SOG1-185
Install Vapor Barrier - SOG #1
Excavator, Boom Lift
N/A
Bldg. C
C-FTG4-335
Pour - Footing Pour #4
Excavator, Boom Lift, Concrete Truck
N/A
Bldg. C
C-RW-495
Waterproof Retaining Walls - North & West
Excavator, Boom Lift
N/A
Bldg. C
C-RW-505
Perforated Drain Pipe / Rock - North & West
Excavator, Boom Lift
N/A
Bldg. C
C-RW-515
Backfill Retaining Walls - North & West
Excavator, Boom Lift
N/A
Bldg. C
C-SOG2-175
Underslab Utilities at SOG #2
Excavator, Boom Lift
N/A
Bldg. C
C-SOG2-185
Fine Grade - SOG #2
Excavator, Boom Lift
N/A
Bldg. D
D-UG-100
Deep Underslab Plumbing - North
Excavator, Boom Lift
N/A
Bldg. D
D-RW-195
Waterproof Retaining Walls - East of DN6
Excavator, Boom Lift
N/A
Bldg. D
D-RW-205
Perforated Drain Pipe / Rock - East of DN6
Excavator, Boom Lift
N/A
Bldg. D
D-RW-215
Backfill Retaining Walls - East of DN6
Excavator, Boom Lift
N/A
Bldg. D
D-RW-265
Close Retaining Walls - West of DN6
Excavator, Boom Lift
N/A
Bldg. D
D-RW-275
Pour Retaining Walls - West of DN6
Excavator, Boom Lift
N/A
Bldg. D
D-RW-285
Strip Retaining Walls - West of DN6
Excavator, Boom Lift
N/A
Bldg. D
D-RW-295
Waterproof Retaining Walls - West of DN6
Excavator, Boom Lift
N/A
Bldg. D
D-RW-305
Perforated Drain Pipe / Rock - West of DN6
Excavator, Boom Lift
N/A
Bldg. D
D-RW-315
Backfill Retaining Walls - West of DN6
Excavator, Boom Lift
N/A
Bldg. D
D-RW-325
One Side Retaining Walls – North
Excavator, Boom Lift
N/A
Bldg. D
D-RW-335
Rebar Retaining Walls – North
Excavator, Boom Lift
N/A
Bldg. D
D-RW-345
MEP Sleeves / Rough-in – North
Excavator, Boom Lift
N/A
Bldg. D
D-RW-355
QC / Inspect Retaining Walls – North
Excavator, Boom Lift
N/A
Bldg. D
D-RW-365
Close Retaining Walls – North
Excavator, Boom Lift
N/A
Bldg. D
D-RW-375
Pour Retaining Walls – North
Excavator, Boom Lift
N/A
Bldg. D
D-SOG1-100
Underslab Utilities at SOG #1
Excavator, Boom Lift
N/A
Bldg. D
D-SOG2-100
Underslab Utilities at SOG #2
Excavator, Boom Lift
N/A
Bldg. D
D-SOG2-190
Complete Remaining Utilities at Retaining Wall Backfill Zone
Excavator, Boom Lift
N/A
Bldg. D
D-SOG2-110
Fine Grade - SOG #2
Excavator, Boom Lift
N/A
Week of April 22, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C
C-SOG1-155
Pour Slab on Grade - SOG #1
Excavator, Boom Lift
N/A
Bldg. C
C-SOG1-165
Layout & Sawcut Control Joints - SOG #1
Excavator, Boom Lift
N/A
Bldg. C
C-SOG1-175
Strip Slab on Grade - SOG #1
Excavator, Boom Lift
N/A
Bldg. C
C-SOG1-345
Cure - SOG #1 (Calendar Days)
Excavator, Boom Lift
N/A
Bldg. C
C-SOG2-195
Edge Form Slab on Grade - SOG #2
Excavator, Boom Lift
N/A
Bldg. C
C-SOG2-255
Install Vapor Barrier - SOG #2
Excavator, Boom Lift
N/A
Bldg. C
C-SOG2-205
Rebar Slab on Grade - SOG #2
Excavator, Boom Lift
N/A
Bldg. C
C-SOG2-215
QC / Inspect Slab on Grade - SOG #2
Excavator, Boom Lift
N/A
Bldg. C
C-SOG3-325
Complete Remaining Utilities at Retaining Wall Backfill Zone
Excavator, Boom Lift
N/A
Bldg. C
C-SOG3-255
Fine Grade - SOG #3
Excavator, Boom Lift
N/A
Bldg. C
C-ML-160
F/R/P Manlift Pad
Excavator, Boom Lift
N/A
Bldg. D
D-FTG1-150
Excavate - Footing Pour (South Leaveout Spreads)
Excavator, Boom Lift
N/A
Bldg. D
D-FTG1-160
Rebar - Footing Pour (South Leaveout Spreads)
Excavator, Boom Lift
N/A
Bldg. D
D-FTG1-170
Form - Footing Pour (South Leaveout Spreads)
Excavator, Boom Lift
N/A
Bldg. D
D-FTG1-180
QC / Inspect - Footing Pour (South Leaveout Spreads)
Excavator, Boom Lift
N/A
Bldg. D
D-FTG1-190
Pour - Footing Pour (South Leaveout Spreads)
Excavator, Boom Lift
N/A
Bldg. D
D-CLMN-310
Rebar - Columns & Shear Walls at SOG #1 (South Leaveout Columns)
Excavator, Boom Lift
N/A
Bldg. D
D-CLMN-320
QC / Inspect - Columns & Shear Walls at SOG #1 (South Leaveout Columns)
Excavator, Boom Lift
N/A
Bldg. D
D-CLMN-330
Close Forms - Columns & Shear Walls at SOG #1 (South Leaveout Columns)
Excavator, Boom Lift
N/A
Bldg. D
D-CLMN-340
Pour - Columns & Shear Walls at SOG #1 (South Leaveout Columns)
Excavator, Boom Lift
N/A
Bldg. D
D-RW-385
Strip Retaining Walls – North
Excavator, Boom Lift
N/A
Bldg. D
D-RW-395
Waterproof Retaining Walls – North
Excavator, Boom Lift
N/A
Bldg. D
D-RW-405
Perforated Drain Pipe / Rock – North
Excavator, Boom Lift
N/A
Bldg. D
D-RW-415
Backfill Retaining Walls - North
Excavator, Boom Lift
N/A
Bldg. D
D-SOG1-100
Underslab Utilities at SOG #1
Excavator, Boom Lift
N/A
Bldg. D
D-SOG1-190
Complete Remaining Utilities at Retaining Wall Backfill Zone
Excavator, Boom Lift
N/A
Bldg. D
D-SOG1-110
Fine Grade - SOG #1
Excavator, Boom Lift
N/A
Week of April 29, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C
C-SOG2-225
Pour Slab on Grade - SOG #2
N/A
N/A
Bldg. C
C-SOG2-235
Layout & Sawcut Control Joints - SOG #2
Excavator, Boom Lift
N/A
Bldg. C
C-SOG2-245
Strip Slab on Grade - SOG #2
Excavator, Boom Lift
N/A
Bldg. C
C-SOG2-335
Cure - SOG #2 (Calendar Days)
Excavator, Boom Lift
N/A
Bldg. C
C-SOG3-265
Edge Form Slab on Grade - SOG #3
Excavator, Boom Lift
N/A
Bldg. C
C-SOG3-335
Install Vapor Barrier - SOG #3
Excavator, Boom Lift
N/A
Bldg. C
C-SOG3-275
Rebar Slab on Grade - SOG #3
Excavator, Boom Lift
N/A
Bldg. C
C-ML-100
F/R/P Manlift Pad
Excavator, Boom Lift
N/A
Bldg. D
D-SOG1-120
Edge Form Slab on Grade - SOG #1
Excavator, Boom Lift
N/A
Bldg. D
D-SOG1-180
Install Vapor Barrier - SOG #1
Excavator, Boom Lift
N/A
Bldg. D
D-SOG1-130
Rebar Slab on Grade - SOG #1
Excavator, Boom Lift
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
-
950586B North District Phase 2 - Construction Alert #16
Week of April 8, 2024
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C
C-UG-100
Deep Underslab Plumbing
Excavator, Boom Lift
N/A
Bldg. C
C-UG-110
Deep Underslab Electrical
Excavator, Boom Lift
N/A
Bldg. C
C-UG-120
Deep Underslab Telecom
Excavator, Boom Lift
N/A
Bldg. C
C-UG-130
Deep Underslab FW
Excavator, Boom Lift
N/A
Bldg. C
C-SOG1-115
Fine Grade - SOG #1
Excavator, Boom Lift
N/A
Bldg. C
C-SOG1-185
Install Vapor Barrier - SOG #1
Excavator, Boom Lift
N/A
Bldg. C
C-SOG1-125
Edge Form Slab on Grade - SOG #1
Excavator, Boom Lift
N/A
Bldg. C
C-SOG2-175
Underslab Utilities at SOG #2
Excavator, Boom Lift
N/A
Bldg. C
C-SOG2-185
Fine Grade - SOG #2
Excavator, Boom Lift
N/A
Week of April 15, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C
C-SOG1-135
Rebar Slab on Grade - SOG #1
Excavator, Boom Lift
N/A
Bldg. C
C-SOG1-145
QC / Inspect Slab on Grade - SOG #1
Excavator, Boom Lift
N/A
Bldg. C
C-SOG1-155
Pour Slab on Grade - SOG #1
Excavator, Boom Lift
N/A
Bldg. C
C-SOG1-165
Layout & Sawcut Control Joints - SOG #1
N/A
N/A
Bldg. C
C-SOG1-175
Strip Slab on Grade - SOG #1
Excavator, Boom Lift
N/A
Bldg. C
C-SOG2-255
Install Vapor Barrier - SOG #2
Excavator, Boom Lift
N/A
Bldg. C
C-SOG2-195
Edge Form Slab on Grade - SOG #2
Excavator, Boom Lift
N/A
Bldg. C
C-SOG2-205
QC / Inspect Slab on Grade - SOG #2
Excavator, Boom Lift
N/A
Bldg. C
C-SOG3-255
Fine Grade - SOG #3
Excavator, Boom Lift
N/A
Bldg. C
C-SOG3-335
Install Vapor Barrier - SOG #3
Excavator, Boom Lift
N/A
Bldg. C
C-SOG3-265
Edge Form Slab on Grade - SOG #3
Excavator, Boom Lift
N/A
Week of April 22, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C
C-SOG1-345
Cure - SOG #1 (Calendar Days)
N/A
N/A
Bldg. C
C-SOG2-215
QC / Inspect Slab on Grade - SOG #2
Excavator, Boom Lift
N/A
Bldg. C
C-SOG2-225
Pour Slab on Grade - SOG #2
Excavator, Boom Lift, Cement Truck
N/A
Bldg. C
C-SOG2-235
Layout & Sawcut Control Joints - SOG #2
Excavator, Boom Lift
N/A
Bldg. C
C-SOG2-245
Strip Slab on Grade - SOG #2
Excavator, Boom Lift
N/A
Bldg. C
C-SOG2-335
Cure - SOG #2 (Calendar Days)
Excavator, Boom Lift
N/A
Bldg. C
C-SOG3-275
Rebar Slab on Grade - SOG #3
Excavator, Boom Lift
N/A
Bldg. C
C-SOG3-285
QC / Inspect Slab on Grade - SOG #3
Excavator, Boom Lift
N/A
Bldg. C
C-SOG3-295
Pour Slab on Grade - SOG #3
Excavator, Boom Lift
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
-
950586B North District Phase 2 - Construction Alert #15
Week of April 1, 2024
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C
C-FTG3-285
RFI #41 - C2-Grade Beam Change Confirmation / Procure and Install Added Rebar
Excavator, Boom Lift, Cement Truck
N/A
Bldg. C
C-FTG3-265
QC / Inspect - Footing Pour #3
Excavator, Boom Lift, Cement Truck
N/A
Bldg. C
C-FTG3-275
Pour - Footing Pour #3
Excavator, Boom Lift, Cement Truck
N/A
Bldg. C
C-FTG4-305
Rebar - Footing Pour #4
Excavator, Boom Lift, Cement Truck
N/A
Bldg. C
C-FTG4-315
Form - Footing Pour #4
Excavator, Boom Lift, Cement Truck
N/A
Bldg. C
C-FTG4-325
QC / Inspect - Footing Pour #4
Excavator, Boom Lift, Cement Truck
N/A
Bldg. C
C-FTG4-335
Pour - Footing Pour #4
Excavator, Boom Lift, Cement Truck
N/A
Bldg. C
C-SOG3-245
Underslab Utilities at SOG #3
Excavator, Boom Lift, Cement Truck
N/A
Bldg. D
D-UG-110
Deep Underslab Plumbing - South
Excavator, Boom Lift, Cement Truck
N/A
Bldg. D
D-FTG2-140
Pour - Footing Pour #2 (Mat)
Excavator, Boom Lift, Cement Truck
N/A
Bldg. D
D-CLMN-120
QC / Inspect - Columns & Shear Walls at SOG #1
Excavator, Boom Lift, Cement Truck
N/A
Bldg. D
D-CLMN-130
Close Forms - Columns & Shear Walls at SOG #1
Excavator, Boom Lift, Cement Truck
N/A
Bldg. D
D-CLMN-140
Pour - Columns & Shear Walls at SOG #1
Excavator, Boom Lift, Cement Truck
N/A
Bldg. D
D-CLMN-260
Rebar - Columns & Shear Walls at SOG #2
Excavator, Boom Lift, Cement Truck
N/A
Bldg. D
D-CLMN-250
Form - Columns & Shear Walls at SOG #2
Excavator, Boom Lift, Cement Truck
N/A
Bldg. D
D-SOG1-100
Underslab Utilities at SOG #1
Excavator, Boom Lift, Cement Truck
N/A
Week of April 8, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C
C-SOG1-105
Underslab Utilities at SOG #1
Excavator, Boom Lift
N/A
Bldg. C
C-SOG1-115
Fine Grade - SOG #1
Excavator, Boom Lift, Cement Truck
N/A
Bldg. C
C-SOG2-175
Underslab Utilities at SOG #2
Excavator, Boom Lift, Cement Truck
N/A
Bldg. C
C-SOG3-245
Underslab Utilities at SOG #3
Excavator, Boom Lift, Cement Truck
N/A
Bldg. D
D-UG-100
Deep Underslab Plumbing - North
Excavator, Boom Lift, Cement Truck
N/A
Bldg. D
D-FTG1-150
Excavate - Footing Pour (South Leaveout Spreads)
Excavator, Boom Lift, Cement Truck
N/A
Bldg. D
D-FTG1-160
Rebar - Footing Pour (South Leaveout Spreads)
Excavator, Boom Lift, Cement Truck
N/A
Bldg. D
D-FTG1-170
Form - Footing Pour (South Leaveout Spreads)
Excavator, Boom Lift, Cement Truck
N/A
Bldg. D
D-FTG1-180
QC / Inspect - Footing Pour (South Leaveout Spreads)
Excavator, Boom Lift, Cement Truck
N/A
Bldg. D
D-FTG1-190
Pour - Footing Pour (South Leaveout Spreads)
Excavator, Boom Lift, Cement Truck
N/A
Bldg. D
D-CLMN-270
QC / Inspect - Columns & Shear Walls at SOG #2
Excavator, Boom Lift, Cement Truck
N/A
Bldg. D
D-CLMN-280
Close Forms - Columns & Shear Walls at SOG #2
Excavator, Boom Lift, Cement Truck
N/A
Bldg. D
D-CLMN-290
Pour - Columns & Shear Walls at SOG #2
Excavator, Boom Lift, Cement Truck
N/A
Bldg. D
D-SOG1-100
Underslab Utilities at SOG #1
Excavator, Boom Lift, Cement Truck
N/A
Bldg. D
D-SOG2-100
Underslab Utilities at SOG #2
Excavator, Boom Lift, Cement Truck
N/A
Week of April 15, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Rec Fields
EW-265
Mass Grading / Balance Parking Lot Site
N/A
N/A
Bldg. C
C-SOG1-115
Fine Grade - SOG #1
Excavator, Boom Lift, Cement Truck
N/A
Bldg. C
C-SOG1-185
Install Vapor Barrier - SOG #1
Excavator, Boom Lift, Cement Truck
N/A
Bldg. C
C-SOG1-125
Edge Form Slab on Grade - SOG #1
Excavator, Boom Lift, Cement Truck
N/A
Bldg. C
C-SOG1-135
Rebar Slab on Grade - SOG #1
Excavator, Boom Lift, Cement Truck
N/A
Bldg. C
C-SOG2-185
Fine Grade - SOG #2
Excavator, Boom Lift, Cement Truck
N/A
Bldg. C
C-SOG2-255
Install Vapor Barrier - SOG #2
Excavator, Boom Lift, Cement Truck
N/A
Bldg. C
C-SOG2-195
Edge Form Slab on Grade - SOG #2
Excavator, Boom Lift, Cement Truck
N/A
Bldg. C
C-SOG3-255
Fine Grade - SOG #3
Excavator, Boom Lift, Cement Truck
N/A
Bldg. D
D-UG-100
Deep Underslab Plumbing - North
Excavator, Boom Lift, Cement Truck
N/A
Bldg. D
D-CLMN-310
Rebar - Columns & Shear Walls at SOG #1 (South Leaveout Columns)
Excavator, Boom Lift, Cement Truck
N/A
Bldg. D
D-CLMN-320
QC / Inspect - Columns & Shear Walls at SOG #1 (South Leaveout Columns)
Excavator, Boom Lift, Cement Truck
N/A
Bldg. D
D-CLMN-330
Close Forms - Columns & Shear Walls at SOG #1 (South Leaveout Columns)
Excavator, Boom Lift, Cement Truck
N/A
Bldg. D
D-CLMN-340
Pour - Columns & Shear Walls at SOG #1 (South Leaveout Columns)
Excavator, Boom Lift, Cement Truck
N/A
Bldg. D
D-SOG1-100
Underslab Utilities at SOG #1
Excavator, Boom Lift, Cement Truck
N/A
Bldg. D
D-SOG2-100
Underslab Utilities at SOG #2
Excavator, Boom Lift, Cement Truck
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
-
950586B North District Phase 2 - Construction Alert #14
Week of March 25, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C
RPU-Canyon Crest
Pothole UG for Upcoming Sewer Upgrade
Saw, Hydro Vac, Mapping
N/A
Bldg. C
C-FTG3-245, 255, 265, 275
Rebar, Form, QC, Pour - Footing Pour #3
Excavator, Boom Lift, Cement Truck
N/A
Bldg. C
C-FTG4-305, 315, 325, Rebar, Form, QC - Footing Pour #4
Excavator, Boom Lift, Cement Truck
N/A
Bldg. C
C-CLMN-340, 330
Close Forms, Pour - Columns at SOG #1 (West)
Excavator, Boom Lift, Cement Truck
N/A
Bldg. C
C-CLMN-230, 240
Close, Pour Forms - Columns at SOG #1 (Gym Area)
Excavator, Boom Lift, Cement Truck
N/A
Bldg. C
C-SOG1-105
Underslab Utilities at SOG #1
Excavator, Boom Lift
N/A
Bldg. C
C-SOG3-245
Underslab Utilities at SOG #3
Excavator, Boom Lift
N/A
Bldg. C
D-UG-110, 110
Deep Underslab Plumbing – South & North
Excavator, Boom Lift
N/A
Bldg. C
D-FTG1-140
Pour - Footing Pour #1
Cement Truck
N/A
Bldg. C
D-FTG1-150, 160, 170, 180, 190
Excavate, Form, QC - Footing Pour (South Leaveout Spreads)
Excavator, Boom Lift, Cement Truck
N/A
Bldg. C
D-FTG2-110, 120, 130
Rebar, Form, QC - Footing Pour #2
Excavator, Boom Lift, Cement Truck
N/A
Bldg. C
D-CLMN-110, 100
Rebar, Form - Columns & Shear Walls at SOG #1
Excavator, Boom Lift
N/A
Week of April 1, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C
C-SOG1-115
Fine Grade - SOG #1
Excavator, Boom Lift
N/A
Bldg. C
C-FTG4-335
Pour - Footing Pour #4
Cement Truck
N/A
Bldg. C
C-SOG2-175
Underslab Utilities at SOG #2
Excavator, Boom Lift
N/A
Bldg. D
D-CLMN-120, 130, 140
Rebar, Form, Pour - Columns & Shear Walls at SOG #1
Excavator, Boom Lift, Cement Truck
N/A
Bldg. D
D-CLMN-260, 250, 270, 280, 290
Rebar, Form, QC, Close, Pour - Columns & Shear Walls at SOG #2
Excavator, Boom Lift, Cement Truck
N/A
Bldg. D
D-SOG1-100
Underslab Utilities at SOG #1
Excavator, Boom Lift
N/A
Bldg. C
C-SOG1-105
Underslab Utilities at SOG #1
Excavator, Boom Lift
N/A
Week of April 8, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C
C-SOG1-185
Install Vapor Barrier - SOG #1
N/A
N/A
Bldg. C
C-SOG1-125
Edge Form Slab on Grade - SOG #1
Hammers, Saws, Excavator, Boom Lift
N/A
Bldg. C
C-SOG1-135
5 Rebar Slab on Grade - SOG #1
Hammers, Saws, Excavator, Boom Lift
N/A
Bldg. C
C-SOG2-185
Fine Grade - SOG #2
Hammers, Saws, Excavator, Boom Lift
N/A
Bldg. C
C-SOG2-255
5 Install Vapor Barrier - SOG #2
Hammers, Saws, Excavator, Boom Lift
N/A
Bldg. C
C-SOG2-195
Edge Form Slab on Grade - SOG #2
Hammers, Saws, Excavator, Boom Lift
N/A
Bldg. C
C-SOG3-255
Fine Grade - SOG #3
Excavator, Boom Lift
N/A
Bldg. D
D-SOG2-100
Underslab Utilities at SOG #2
Excavator, Boom Lift
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
-
950586B North District Phase 2 - Construction Alert #13
Week of March 18, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C
C-FTG3, 235, 245, 255, 265, 275
Excavate, Rebar, Form, QC – Footing Pour #3
Excavator, Boom Lift, Cement Truck
N/A
Bldg. C
C-FTG4-295, 305, 315
Excavate, Rebar, Form, QC
Footing Pour #4
Excavator, Boom Lift, Cement Truck
N/A
Bldg. C
C-CLMN-260,270, 290, 280
Rebar, QC/Inspect, Close Forms, Pours – Column at SOG #1 (North)
Excavator, Boom Lift, Cement Truck
N/A
Bldg. C
C-CLMN-160, 150, 170, 180, 190
Rebar, Form, QC/Inspect, Close Forms, Pour - Shear Walls at SOG #1 (West)
Excavator, Boom Lift, Cement Truck
N/A
Bldg. C
C-CLMN-310, 300, 320, 340, 330
Rebar, Form, QC / Inspect, Close Forms, Pour - Columns at SOG #1 (West)
Excavator, Boom Lift, Cement Truck
N/A
Bldg. C
C-CLMN-210, 220 230
Rebar, QC/Inspect, Close Forms – Columns at SOG #1
Excavator, Boom Lift, Cement Truck
N/A
Bldg. C
C-SOG1-105
Underslab Utilities at SOG #1
Excavator
N/A
Bldg. C
C-SOG3-245
Underslab Utilities at SOG #3
Excavator
N/A
Bldg. C
RPU-Canyon Crest
Pothole UG for Upcoming Sewer Upgrade
Saw, Hydro Vac, Mapping
N/A
Week of March 25, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C
C-CLMN- 230, 240
Close, Pour Forms – Columns at SOG #1
Excavator, Boom Lift, Cement Truck
N/A
Bldg. C
C-SOG1-105
Underslab Utilities at SOG #1
Excavator
N/A
Bldg. C
C-SOG2-175
Underslab Utilities at SOG#2
Excavator
N/A
Bldg. C
D-UG-110
Deep Underslab Plumbing – South
Excavator
N/A
Bldg. C
D-FTG2-110, 120, 130, 140
Rebar, Form, QC/Inspect, Pour – Footing Pour #2
Excavator, Boom Lift, Cement Truck
N/A
Bldg. C
D-CLMN-110, 100, 120, 130
Rebar, Form, QC/Inspect, Close Forms – Columns & Shear Walls at SOG#1
Excavator, Boom Lift, Cement Truck
N/A
Bldg. C
RPU-Canyon Crest
Pothole UG for Upcoming Sewer Upgrade
Saw, Hydro Vac, Mapping
N/A
Week of April 1, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. D
D-CLMN-110, 110, 120, 130
Rebar - Columns & Shear Walls at SOG #1
N/A
N/A
Bldg. D
C-SOG1-105
Underslab Utilities at SOG #1
Excavator
N/A
Bldg. D
C-SOG2-175
Underslab Utilities at SOG#2
Excavator
N/A
Bldg. D
D-UG-110
Deep Underslab Plumbing – South
Excavator
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
-
950586B North District Phase 2 - Construction Alert #12
Week of March 11, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C
C-UG-100, 110
Deep Underslab Plumbing, Electrical
Excavator, Fork
N/A
Bldg. C
C-UG-120
Telecom
N/A
N/A
Bldg. C
C-UG-130
Deep Underslab FW
Excavator, Fork
N/A
Bldg. C
C-FTG-185, 195, 205
Rebar, Form, QC / Inspect and Pour
Footing Pour #2
N/A
N/A
Bldg. C
C-CLMN-110, 110, 120
Rebar & Form, QC/Inspect – Shear Walls at SOG#1 (North)
Excavator, Fork
N/A
Bldg. C
C-CLMN – 13o, 140
Close Forms - Shear Walls at SOG #1 (North)
Excavator, Fork
N/A
Bldg. C
C-CLMN-260
Rebar – Columns at SOG#1 (North)
Excavator, Fork
N/A
Bldg. D
D-FTG1-100, 110, Excavate, Rebar - Footing Pour #1
Excavator, Fork
N/A
Week of March 18, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C
C-FTG3, 235, 245, 255, 265, 275
Excavate, Rebar, Form, QC – Footing Pour #3
Excavator, Fork
N/A
Bldg. C
C-FTG4-295, 305, 315
Excavate, Rebar, Form, QC - Footing Pour #4
Excavator, Fork
N/A
Bldg. C
C-CLMN-270
Inspect - Columns at SOG #1 (North)
Excavator, Fork
N/A
Bldg. C
C-CLMN-290
Close Forms - Columns at SOG #1 (North)
Excavator, Fork
N/A
Bldg. C
C-CLMN-280
Pour - Columns at SOG #1 (North)
Cemex Truck
N/A
Bldg. C
C-CLMN-160, 150
Rebar, Form - Shear Walls at SOG #1 (West)
Excavator, Fork
N/A
Bldg. C
C-CLMN -170, 180 QC, Close Forms Inspect - Shear Walls at SOG #1 (West)
N/A
N/A
Bldg. C
C-CLMN-190
Pour - Shear Walls at SOG #1 (West)
Cemex Truck
N/A
Bldg. C
C-CLMN-310
Rebar - Columns at SOG #1 (West)
N/A
N/A
Bldg. C
C-CLMN-300
Form - Columns at SOG #1 (West)
N/A
N/A
Bldg. C
C-CLMN-320
QC / Inspect - Columns at SOG #1 (West)
N/A
N/A
Bldg. C
C-CLMN-340 Close Forms - Columns at SOG #1 (West)
N/A
N/A
Bldg. C
C-CLMN-330
Pour - Columns at SOG #1 (West)
Cemex Truck
N/A
Bldg. C
C-SOG1-105
Underslab Utilities at SOG #1
Excavator, Fork
N/A
Bldg. C
C-SOG3-245
Underslab Utilities at SOG #3
Excavator, Fork
N/A
Bldg. D
D-FTG1-120, 130, 140
Form, QC, Pour Footing Pour #1
Excavator, Fork
N/A
Week of March 25, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C
C-FTG4-295, 305, 315
Excavate, Rebar, Form, QC, Pour
Footing Pour #4
Excavator, Fork
N/A
Bldg. C
C-SOG2-175
Underslab Utilities at SOG #2
Excavator, Fork
N/A
Bldg. D
D-UG-110
Deep Underslab Plumbing - South
Excavator, Fork
N/A
Bldg. D
D-FTG2-100, 110, 120, 130, 140
Excavate, Rebar, Form QC Pour - Footing Pour #2
Excavator, Fork
N/A
Bldg. D
D-CLMN-110, 110, 120, 130
Rebar - Columns & Shear Walls at SOG #1
N/A
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
-
950586B North District Phase 2 - Construction Alert #11
Week of March 4, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Rec. Fields
EW-265
Mass Grading / Balance
Parking Lot Site
Dozer 8
N/A
Bldg. C
C-UG-100, 110
Deep Underslab
Plumbing, Electrical
Dozer 8
N/A
Bldg. C
C-FTG-125
Rebar – Footing Pour #1
Rebar Benders
N/A
Bldg. C
C-FTG-135
Form – Footing Pour #1
Rebar Benders
N/A
Bldg. C
C-FTG 145
QC / Inspect – Footing Pour #1
N/A
N/A
Bldg. C
C-FTG2-185
Rebar – Footing Pour #2
Concrete Truck/Pump
N/A
Bldg. C
C-FTG2-195
Form – Footing Pour #2
Concrete Truck/Pump
N/A
Bldg. C
C-FTG2-205
QC / Inspect – Footing Pour #2
Concrete Truck/Pump
N/A
Bldg. D
D-UG-100
Deep Underslab – Plumbing North
Concrete Truck/Pump
N/A
Bldg. D
D-UG-110
Deep Underslab
Plumbing South
Concrete Truck/Pump
N/A
Bldg. D
D-UG-100
Deep Underslab – Plumbing North
Skidloader & Bucket
N/A
Bldg. D
D-FTG1-100
Excavate–Footing Pour#1
Skidloader & Bucket
N/A
Week of March 11, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. D
D-UG-110
Deep Underslab – Plumbing South
Skidloader & Bucket
N/A
Bldg. D
D-FTG1-110
Rebar – Footing Pour #1
Skidloader & Bucket
N/A
Bldg. D
D-FTG1-120
Form – Footing Pour #1
Rebar Benders
N/A
Bldg. D
D-FTG1-130
QC/ Inspect –
Footing Pour #1
N/A
N/A
Week of March 18, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. D
C-CLMN-110
Rebar – Column & Shear Walls at SOG#1
Skidloader & Bucket
N/A
Bldg. D
C-CLMN-120
QC / Inspec – Columns & Shear Walls at SOG#1
Skidloader & Bucket
N/A
Bldg. D
C-CLMN- 130
Close Forms – Columns & Shear Walls at SOG#1
Skidloader & Bucket
N/A
Bldg. D
D-CLMN -140
Pour – Columns & Shear Walls at SOG#1
Dozer 8
Excavator
N/A
Bldg. D
D-SOG1-100
Underslab Utilities at SOG#1
Rebar Benders
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
-
950586B North District Phase 2 - Construction Alert #10
Week of February 26, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. D
EW-245
Fine Grade
Dozer 8
N/A
Bldg. D
EW-255
Certify Pad
None
N/A
Rec. Fields
EW-265
Mass Grading / Balance
Parking Lot Site
Dozer 8
N/A
Bldg. C
C-UG-100, 110
Deep Underslab Plumbing
Dozer 8
N/A
Bldg. C
C-FTG-115
Excavate – Footing Pour #1
Dozer 8
Excavator
N/A
Bldg. C
C-FTG-165
Pour Mud Slab at Mat Foundations
Dozer 8
Excavator
N/A
Bldg. C
C-FTG-125
Rebar – Footing Pour #1
Rebar Benders
N/A
Bldg. C
C-FTG-135
Form – Footing Pour #1
Rebar Benders
Hammer
N/A
Bldg. C
C-FTG2-175
Excavate – Footing Pour #2
Dozer 8
Excavator
N/A
Bldg. C
C-FTG2-225
Pour Mud Slab at Mat Foundations
Concrete Truck/Pump
N/A
Bldg. C
C-FTG2-185
Rebar – Footing Pour #2
Concrete Truck/Pump
N/A
Bldg. C
C-FTG2-195
Form – Footing Pour #2
Concrete Truck/Pump
N/A
Bldg. D
D-UG-100
Deep Underslab – Plumbing North
Concrete Truck/Pump
N/A
Bldg. D
D-FTG-100
Layout Foundations
N/A
N/A
Week of March 4, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C
C-UG-100, 110
Deep Underslab Plumbing
Skid
N/A
Bldg. C
C-FTG-125
Rebar – Footing Pour #1
Rebar Benders
N/A
Bldg. C
C-FTG 145
QC / Inspect – Footing Pour #1
N/A
N/A
Bldg. C
C-FTG2-185
Rebar – Footing Pour #2
Concrete Truck/Pump
N/A
Bldg. C
C-FTG2-195
Form – Footing Pour #2
Concrete Truck/Pump
N/A
Bldg. C
C-FTG2-205
QC / Inspect – Footing Pour #2
Concrete Truck/Pump
N/A
Bldg. D
D-UG-100
Deep Underslab – Plumbing North
Skidloader & Bucket
N/A
Bldg. D
D-UG-100
Deep Underslab – Plumbing North
Skidloader & Bucket
N/A
Bldg. D
D-FTG1-100
Excavate–Footing Pour #1
Dozer 8
Excavator
N/A
Week of March 11, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C
C-UG-120
Deep Underslab
Telecom
Skidloader & Bucket
N/A
Bldg. C
C-UG-130
Deep Underslab
FW
Skidloader & Bucket
N/A
Bldg. D
D-UG-110
Deep Underslab Plumbing South
Skidloader & Bucket
N/A
Bldg. D
D-FTG1-100
Excavate – Footing Pour #1
Dozer 8
Excavator
N/A
Bldg. D
D-FTG1-110
Rebar – Footing Pour #1
Rebar Benders
N/A
Bldg. D
D-FTG1-120
Form – Footing Pour #1
Concrete Truck/Pump
N/A
Bldg. D
D-FTG1-130
QC / Inspect – Footing Pour #1
Concrete Truck/Pump
N/A
Bldg. D
D-FTG2-100
Excavate – Footing Pour #2
Concrete Truck/Pump
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
-
950586B North District Phase 2 - Construction Alert #9
Week of February 12, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C
EW-225
Fine Grading
Dozer 8
None
Site
UTIL-WELLS
Install Test Drywell for Percolation / Infiltration
Drill Rig, Backhoe, support Truck
Week of February 19, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C
EW-235
Certify Building Pad
N/A
None
Bldg. D
EW-245
Fine Grade
Dozer 8
None
Bldg. C
C-UG-100
Deep Underslab Plumbing
N/A
Bldg. C
C-UG-100
Deep Underslab
Electrical
N/A
Bldg. C
C-FND-100
Layout Foundations
N/A
Week of February 26, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C
C-UG-100
Deep Underslab Plumbing
N/A
Bldg. C
C-UG-100
Deep Underslab
Electrical
N/A
Bldg. C
C-FTG1-115
Excavate – Footing Pour #1
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
-
950586B North District Phase 2 - Construction Alert #8
UCR – ND2: 3 Week Lookahead (2/5/2024)
Week of February 5, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C
&D
Rain & Dry out– SWPPP
None
N/A
Week of February 12, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C &D
Rain & Dry out– SWPPP
None
N/A
Bldg. C
EW-225
Fine Grading
Dozer 8
N/A
Bldg. D
EW-245
Fine Grading Building D
Dozer & Grader
N/A
Week of February 19, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C
EW-235
Certify Building Pad
None
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
-
950586B North District Phase 2 - Construction Alert #7
Week of January 29, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C
EW-225
Fine Grading
Dozer 8
N/A
Bldg. D, Central Plant & Rec. Field
Remove Remaining
Trees (4)
Excavator
N/A
Week of February 5, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C
EW-225
Fine Grading
Dozer 8
N/A
Bldg. C
EW-235
Certify Building Pad
None
N/A
Bldg. D
EW-245
Fine Grading
Building D
Dozer & Grader
N/A
Week of February 12, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. D
EW-245
Fine Grading
Dozer & Grader
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
-
950586B North District Phase 2 - Construction Alert #6
Week of January 22, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C
EW-215
Mass Grading / Balance Building Site
Dozer 8
N/A
Week of January 29, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C
EW-225
Fine Grading– Building C
Skip loader
N/A
Week of February 5, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. D
EW-225
Fine Grade – Building D
Skip loader
N/A
Bldg. C
EQ-235
Certify Building Pad – Building
N/A
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
-
950586B North District Phase 2 - Construction Alert #5
Week of January 15, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C & D Site
EW-205
Remaining Misc Site Demolition
Skip loader, Mini Excavator
N/A
Bldg. C & D Site
EW-215
Mass Grading / Balance Building Site
Skip loader, Mini Excavator
N/A
Week of January 22, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C & D Site
EW-215
Mass Grading / Balance Building Site
Skip loader, Excavator
N/A
Week of January 29, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C & D Site
EW-225
Fine Grade – Building C
Skip loader,
Dozer 8
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
-
950586B North District Phase 2 - Construction Alert #4
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C & D Site
EW-185
Abatement
Skip loader, Mini Excavator
N/A
Bldg. C & D Site
EW-195 Cut / Cap and Utility Relocations
Skip loader, Mini Excavator
N/A
Week of January 15, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C & D Site
EW-205 Remaining Misc Site Demo
Skip loader, Mini Excavator
N/A
Bldg. C & D Site
EW-215 Mass Grading / Balance Building Site
Skip loader
N/A
Week of January 22, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C & D Site
EW-215 Mass Grading / Balance Building Site
Skip loader
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
-
950586B North District Phase 2 - Construction Alert #3
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C & D Site
EW-185
Abatement
Skip Loader, Mini Excavator
N/A
Bldg. C & D Site
EW-195 Cut / Cap and Utility Relocations
Skip loader, Mini Excavator
N/A
Week of January 8, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C & D Site
EW-185
Abatement
Skip Loader, Mini Excavator
N/A
Bldg. C & D Site
EW-195 Cut / Cap and Utility Relocations
Skip loader, Mini Excavator
N/A
Week of January 15, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C & D Site
EW-185
Abatement
Skip Loader, Mini Excavator
N/A
Bldg. C & D Site
EW-205
Remaining Misc. Site Demolition
Skip Loader, Mini Excavator
N/A
Bldg. C & D Site
EW-215
Mass Grading / Balance Building Site
Skip Loader, Mini Excavator
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
-
950586B North District Phase 2 - Construction Alert #2
Week of December 18, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C & D Site
A1500 Mass Grading / Balance Building Site
N/A
N/A
Bldg. C & D Site
A1600 AQMD Procedure 5 Notification
N/A
N/A
Bldg. C & D Site
A1590
Abatement
Skip Loader, Mini Excavator
Water disturbance to KUCR
Bldg. C & D Site
A2870 Cut / Cap &Utility Relocation
Mini Excavator
N/A
Week of December 25, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C & D Site
A1590
Abatement
Skip Loader, Mini Excavator
N/A
Bldg. C & D Site
A2870 Cut / Cap &Utility Relocation
Mini Excavator
N/A
Week of January 1, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C & D Site
A2870 Cut / Cap &Utility Relocation
Mini Excavator
N/A
Bldg. C & D Site
A1500 Mass Grading / Balance Building Site
Skip loader, Mini Excavator, Excavator, Bottom Dump Truck
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Cut & cap water feed
Bldg. C & D Site
24 hrs 12/21/23
KUCR Bldg.
-
Construction Alerts
Week of December 11, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C & D Site
A1600
AQMD Procedure 5 Notification
N/A
N/A
Site Make-Ready
A1610
Establish Temporary Power to Site
Auger
N/A
Bldg. C & D Site
A2880
Export Soil While Waiting for Abatement
Skip loader, Mini Excavator, Excavator, Bottom Dump Truck
Noise due to Equipment
Week of December 18, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C & D Site
A1500
Mass Grading / Balance Building Site
Skip loader, Mini Excavator, Excavator, Bottom Dump Truck
N/A
Bldg. C & D Site
A1600
AQMD Procedure 5 Notification
N/A
N/A
Bldg. C & D Site
A1590
Abatement
N/A
N/A
Bldg. C & D Site
A2870
Cut / Cap &Utility Relocation
N/A
N/A
Week of December 25, 2023
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C & D Site
A2870
Cut / Cap &Utility Relocation
N/A
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Cut & cap water feed
Bldg. C & D Site
24 hrs. 12/21/23
KUCR Bldg.