North District Phase 2
The North District Phase 2 project is a joint initiative by UC Riverside and Riverside Community College aimed at addressing the increasing demand for on-campus housing for undergraduate and graduate students.
The project proposes to construct over 1,500 new apartment-style units, providing comfortable and modern living spaces for students. The project is being proposed in response to the growing need for affordable, safe, and convenient housing options for students. With the increasing number of students enrolled in UC Riverside and Riverside Community College, the demand for on-campus housing has exceeded the available options. As a result, many students are forced to seek off-campus housing, which may not always be affordable, safe, or convenient.
The proposed project seeks to address this issue by providing over 1,500 new beds in apartment-style units, which will be designed to meet the needs of undergraduate and graduate students. The units will be equipped with modern amenities and facilities, such as Wi-Fi, air conditioning, study areas, and communal spaces for socializing and relaxation.
The project is being proposed in partnership with Riverside Community College and is seeking funding through the State Higher Education Student Housing Grant Program. If the funding application is successful, the project will provide 652 beds for low-income UCR and RCCD students, ensuring that students from diverse backgrounds have access to safe and affordable housing options.
Overall, the North District Phase 2 project is an important initiative that will help to address the growing demand for on-campus housing for UC Riverside and Riverside Community College students. By providing modern and affordable housing options, the project will help integrate Riverside Community College students into UC Riverside campus and student community as well as help to create a more vibrant and inclusive campus community, while also ensuring that students have the resources they need to succeed academically.
Project Scope:
Program, design and construction of a new ~400,000 GSF buildings for undergraduate and graduate student housing.
North District Phase 2 Project Updates
-
950586B North District Phase 2 - Construction Alert #42
Week of October 7, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C
UTIL-CS-135
Excavate Storm Drain
Excavator
N/A
Bldg. D
D-S-RF-200
Install Roof Davits / Tie-Backs
Trade Tools
N/A
Lot
LOT-285
Paving Cure Time
Trade Tools
N/A
Lot
LOT-445
Shift Temp Construction Parking to West Side
Trade Tools
N/A
Week of October 14, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Rec Fields
SUM-275
Recreation Fields
Trade Tools
N/A
Rec Fields
FIELDS-115
Rough Grade Site
Trade Tools
N/A
ROW
ROW-ELEC-145
Install Ductbanks
Trade Tools
N/A
Central Park
CENPARK-255
Install Irrigation Sleeves
Trade Tools
N/A
Week of October 21, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C
UTIL-CE-145 & 155
Excavate & Install Fire Water
Trade Tools
N/A
ROW
ROW-ELEC-135
Excavate for Conduit Pathway
Trade Tools
N/A
Bldg. D
D-ML-160
Jump Manlift to Roof Level
Trade Tools
N/A
Bldg. D
UTIL-DE-125
Install Storm Drain Structures
Trade Tools
N/A
Bldg. D
D-INT-7S-935 & 7N-935
Set FCU's - Level 7S
Trade Tools
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Upgrade Sewer
Canyon Crest Street
(University to Blaine)
TBA
Traffic Along Canyon Crest (University to Blaine)
Offsite
UTIL-PEACH-135
Excavate & Install
New Sewer Line
TBA
-
950586B North District Phase 2 - Construction Alert #41
Week of September 30, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Parking Lot
ROW-ELEC-125
Install Vaults
Trade Tools
N/A
Parking Lot
C-SE-E1-1035
Bike Rack / Mechanical Enclosure Buildout
Trade Tools
N/A
Parking Lot
LOT-315
Install Catch Basins
Trade Tools
N/A
Parking Lot
LOT-195
Install Hardscape
Trade Tools
N/A
Week of October 7, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
ROW
ROW-ELEC-135
Excavate for Conduit Pathway
Excavator
N/A
Bldg. C
UTIL-CS-135
Excavate Storm Drain
Excavator
N/A
Bldg. D
D-ML-160
Jump Manlift to Roof Level
Trade Tools
N/A
Bldg. D
D-S-RF-200
Install Roof Davits / Tie-Backs
Trade Tools
N/A
Lot
LOT-285
Paving Cure Time
Trade Tools
N/A
Lot
LOT-445
Shift Temp Construction Parking to West Side
Trade Tools
N/A
Week of October 14, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Rec Fields
SUM-275
Recreation Fields
Trade Tools
N/A
Rec Fields
FIELDS-115
Rough Grade Site
Trade Tools
N/A
ROW
ROW-ELEC-145
Install Ductbanks
Trade Tools
N/A
Central Park
CENPARK-255
Install Irrigation Sleeves
Trade Tools
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Upgrade Sewer
Canyon Crest Street
(University to Blaine)
TBA
Traffic Along Canyon Crest (University to Blaine)
Offsite
UTIL-PEACH-135
Excavate & Install
New Sewer Line
TBA
-
950586B North District Phase 2 - Construction Alert #40
Week of September 23, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. D
PR05-1485
Fabricate / Deliver - Building D - Level 7 - Roofs
Crane
N/A
Bldg. D
PR05-1495
Fabricate / Deliver - Building D - Upper Roof
Crane
N/A
Bldg. C
UTIL-CS-145
Install Storm Drain
Trade Tools
N/A
Cherry Street
UTIL-CHERRY-255
Excavate Sewer
Trade Tools
N/A
Saturday Work
Bldg. D
D-L7R-380
Erect Structural Metal Stud Walls & Floor - Level 7 - Roofs
Crane
N/A
Bldg. D
D-L7R-160
Erect Structural Metal Stud Walls & Floor - Upper Roof
Crane
N/A
Week of September 30, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Parking Lot
ROW-ELEC-125
Install Vaults
Trade Tools
N/A
Parking Lot
C-SE-E1-1035
Bike Rack / Mechanical Enclosure Buildout
Trade Tools
N/A
Parking Lot
LOT-195
Install Hardscape
Trade Tools
N/A
Saturday Work
Bldg. D
D-L7R-160
Erect Structural Metal Stud Walls & Floor - Upper Roof
Crane
N/A
Week of October 7, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C
UTIL-CS-135
Excavate Storm Drain
Excavator
N/A
Bldg. D
D-N-RF-200
Install Roof Davits / Tie-Backs
Trade Tools
N/A
Bldg. D
D-S-EXT-W-135
Install Brackets for Wood Slats & Shade Canopies
Trade Tools
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Upgrade Sewer
Canyon Crest Street
(University to Blaine)
TBA
Traffic Along Canyon Crest (University to Blaine)
Offsite
UTIL-PEACH-135
Excavate & Install
New Sewer Line
TBA
-
950586B North District Phase 2 - Construction Alert #39
Week of September 9, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Peach Street
UTIL-CS-115 & 125
Excavate & Install Sewer
Trade Tools
N/A
Cherry Street
UTIL-CHERRY-135
Install Sewer
Trade Tools
N/A
Bldg. C
C-SE-LNG-245
Erect Tube Steel - L5-RF
Crane
N/A
Bldg. C
C-SE-LNG-255
Erect CFS Walls - L5
Crane
N/A
Bldg. C
C-SE-LNG-265
Erect CFS Roof - RF
Crane
N/A
Bldg. C
C-SE-EXT-EN-145
Install Rigid Insulation
Trade Tools
N/A
Parking Lot
LOT-175
Install Swales & Dissipators
Trade Tools
N/A
Bldg. D
D-L56-180
Erect Structural Metal Stud Walls & Floor - Level 6 - Floors
Crane
N/A
Saturday Work
Bldg. D
D-L67-170
Erect Structural Metal Stud Walls & Floor - Level - 6 Walls
Crane
N/A
Week of September 16, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C
UTIL-CS-135
Excavate Storm Drain
Excavator
N/A
Cherry Street
UTIL-CHERRY-145
Excavate Storm Drain Structures
Excavator
N/A
Bldg. C
C-NW-L7R-100
Erect Structural Metal Stud Walls & Floor - Upper Roof
Crane
N/A
Parking Lot
LOT-185
Final Grade for Paving & Hardscape
Trade Tools
N/A
Saturday Work
Bldg. D
D-L7R-370
Erect Structural Metal Stud Walls & Floor - Level 7 - Walls
Crane
N/A
Bldg. D
D-L67-160
Erect Structural Metal Stud Walls & Floor - Level 7 - Floors
Crane
N/A
Week of September 23, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C
UTIL-CS-145
Install Storm Drain
Trade Tools
N/A
Cherry Street
UTIL-CHERRY-255
Excavate Sewer
Trade Tools
N/A
Cherry Street
UTIL-CHERRY-225
Install Sewer Manholes
Trade Tools
N/A
Saturday Work
Bldg. D
D-L7R-380
Erect Structural Metal Stud Walls & Floor - Level 7 - Roofs
Crane
N/A
Bldg. D
D-L7R-160
Erect Structural Metal Stud Walls & Floor - Upper Roof
Crane
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Upgrade Sewer
Canyon Crest Street
(University to Blaine)
TBA
Traffic Along Canyon Crest (University to Blaine)
Offsite
UTIL-PEACH-135
Excavate & Install
New Sewer Line
TBA
-
950586B North District Phase 2 - Construction Alert #38
Dear UCR Partners,
Please be advised that the following activities will be occurring during the weeks/ dates noted below at the North District 2 (ND2) project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below. The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below.
The North District 2 Team recognizes that construction activities will result in inconveniences and disruption to the surrounding neighborhood. We thank you for your continued patience during the construction of this much needed project
Week of September 9, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Peach Street
UTIL-CS-115 & 125
Excavate & Install Sewer
Excavator
N/A
Cherry Street
UTIL-CHERRY-135
Install Sewer
Lifter
N/A
Bldg. C
C-SE-LNG-245
Erect Tube Steel - L5-RF
Trade Tools
N/A
Bldg. C
C-SE-LNG-255
Erect CFS Walls - L5
Trade Tools
N/A
Bldg. C
C-SE-LNG-265
Erect CFS Roof - RF
Crane
N/A
Parking Lot
LOT-175
Install Swales & Dissipators
Lifter
N/A
Saturday Work
Bldg. D
Erect Structural Metal Stud Walls & Floor - Level 6 - Walls
Crane
N/A
Week of September 16, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C UTIL-CS-135
Excavate Storm Drain
Excavator
N/A
Cherry Street UTIL-CHERRY-145
Excavate Storm Drain Structures
Excavator
N/A
Bldg. C C-NW-L7R-100
Erect Structural Metal Stud Walls & Floor - Upper Roof
Lifter
N/A
Bldg. D D-L56-180
Erect Structural Metal Stud Walls & Floor - Level 6 - Floors
Excavator
N/A
Bldg. D D-L67-160
Erect Structural Metal Stud Walls & Floor - Level 7 - Floors
Excavator
N/A
Bldg. D D-L7R-370
Erect Structural Metal Stud Walls & Floor - Level 7 - Walls
Excavator
N/A
Saturday Work
Bldg. D Erect Structural Metal Stud Walls & Floor - Level 7 Walls
Crane
N/A
Week of September 23, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Cherry Street UTIL-CHERRY-255
Excavate Sewer
Excavator
N/A
Cherry Street UTIL-CHERRY-225
Install Sewer Manholes
Trade Tools
N/A
Saturday Work
Bldg. D Erect Structural Metal Stud Walls & Floor - Level 7 - Roof
Crane
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Upgrade Sewer
Canyon Crest Street
(University to Blaine)
TBA
Traffic Along Canyon Crest (University to Blaine)
Offsite
UTIL-PEACH-135
Excavate & Install
New Sewer Line
TBA
-
950586B North District Phase 2 - Construction Alert #37
Week of September 2, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Peach Street
UTIL-CE-125
Install Storm Drain Structures
Excavator; Trade Tools
N/A
Bldg. C
C-NW-EXT-WS-115
Scaffold Setup
Trade Tools
N/A
Cherry Street
UTIL-CHERRY-135
Install Sewer
Excavator; Trade Tools
N/A
Bldg. D
Erect Structural Metal Stud Walls & Floor - Level 5 - Walls
Crane
N/A
Saturday Work
Bldg. D
Erect Structural Metal Stud Walls & Floor - Level 5 – Roof
Crane
N/A
Week of September 9, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Peach Street
UTIL-CE-125
Install Storm Drain Structures
Excavator; Trade Tools
N/A
Bldg. C
C-SE-LNG-255
Erect CFS Walls - L5
Crane
N/A
Peach Street
UTIL-PEACH-135
Install Grease Interceptor
Trade Tools
N/A
Cherry Street
UTIL-CHERRY-135
Install Sewer
Excavator; Trade Tools
N/A
Bldg. C
C-SE-LNG-265
Erect CFS Roof - RF
Crane
N/A
Bldg. D
Erect Structural Metal Stud Walls & Floor - Level 6 – Floors, Walls
Crane
N/A
Saturday Work
Bldg. D
Erect Structural Metal Stud Walls & Floor - Level 6 - Walls
Crane
N/A
Week of September 16, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Cherry Street
UTIL-CHERRY-145
Excavate Storm Drain Structures
Excavator; Trade Tools
N/A
Cherry Street
UTIL-CHERRY-155
Install Storm Drain Structures
Excavator; Boom lifter
N/A
Bldg. D
Erect Structural Metal Stud Walls & Floor - Level 6 - Walls
Crane
N/A
Bldg. D
Erect Structural Metal Stud Walls & Floor - Level 7 – Floors, Walls
Crane
N/A
Saturday Work
Bldg. D
Erect Structural Metal Stud Walls & Floor - Level 7 - Walls
Crane
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Upgrade Sewer
Canyon Crest Street
(University to Blaine)
TBA
Traffic Along Canyon Crest (University to Blaine)
Offsite
UTIL-PEACH-135
Excavate & Install
New Sewer Line
TBA
-
950586B North District Phase 2 - Construction Alert #36
Week of August 26, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C – South
UTIL-CS-115
Excavate & Install Sewer
Excavator
N/A
Bldg. C & Cherry
UTIL-CS-135
Excavate, Install SD & Sewer Manhole
Excavator
N/A
Parking Lot
LOT-155, 165
Grade and install Curbs, Gutters & Swales
Grader
N/A
Saturday Work
Bldg. D
Erect Structural Metal Stud Walls & Floor - Level 3 - Walls (Remaining Panels)
Crane
N/A
Week of September 2, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Peach Street
UTIL-CE-125
Install Storm Drain Structures
Trade Tools
N/A
Cherry Street
UTIL-CHERRY-135
Install Sewer
Trade Tools
N/A
Bldg. C
C-NW-EXT-WS-115
Scaffold Setup
Trade Tools
N/A
Saturday Work
N/A
Bldg. D
Erect Structural Metal Stud Walls & Floor - Level 3 - Walls (Remaining Panels)
Crane
N/A
Week of September 9, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C
C-SE-LNG-255
Erect CFS Walls - L5
Trade Tools
N/A
Bldg. C
C-SE-RF-140
Install Tapered Insulation & Roofing Membrane
Trade Tools
N/A
Cherry Street
UTIL-CHERRY-135
Install Sewer
Trade Tools
N/A
Saturday Work
Bldg. D
Erect Structural Metal Stud Walls & Floor - Level 3 - Walls (Remaining Panels)
Crane
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Upgrade Sewer
Canyon Crest Street
(University to Blaine)
TBA
Traffic Along Canyon Crest (University to Blaine)
Offsite
UTIL-PEACH-135
Excavate & Install
New Sewer Line
TBA
-
950586B North District Phase 2 - Construction Alert #35
Week of August 19, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Parking Lot
LOT-135
Install Site Lighting Pole Bases
Gradall
N/A
Parking Lot
LOT-165
Install Curbs, Gutters & Flow Lines
Trade Tools/Concrete Truck
N/A
Peach Street
UTIL-PEACH-225
Excavate Site Electrical
Excavator
N/A
Peach Street
UTIL-PEACH-325
Excavate & Install Remaining Storm Drain
Excavator
N/A
Peach Street
UTIL-PEACH-355
Excavate Fire Water
Excavator
N/A
Peach Street
UTIL-PEACH-125
5 Install Sewer Manholes
Excavator
N/A
Week of August 26, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C - South
UTIL-CS-115
Excavate & Install Sewer
Excavator
N/A
Bldg. C - South
UTIL-CS-135
Excavate & Install Storm Drain
Excavator
N/A
Cherry Street
UTIL-CHERRY-115
Excavate & Install Sewer
Excavator
N/A
Peach Street
ROW-ELEC-115
Excavate for Vaults 5
Trade Tools
N/A
Peach Street
ROW-ELEC-125
Install Vaults 5
Trade Tools
N/A
Week of September 2, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Peach Street
UTIL-CE-125
Install Storm Drain Structures
Trade Tools
N/A
Peach Street
UTIL-PEACH-135
Install Grease Interceptor
Trade Tools
N/A
Cherry Street
UTIL-CHERRY-135
Install Sewer
Trade Tools
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Upgrade Sewer
Canyon Crest Street
(University to Blaine)
TBA
Traffic Along Canyon Crest (University to Blaine)
Offsite
UTIL-PEACH-135
Excavate & Install
New Sewer Line
TBA
-
950586B North District Phase 2 - Construction Alert #34
Week of August 12, 2024
Critical Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C
C-NW-L7R-310 Erect Structural Metal Stud Walls & Floor - Level 7 - Roofs
Crane
N/A
Bldg. C
C-NW-L7R-100 Erect Structural Metal Stud Walls & Floor - Upper Roof
Crane
N/A
Peach Street
UTIL-PEACH-155 Excavate Remaining Storm Drain 3
Excavator;
Trade Tools
N/A
Peach Street
UTIL-PEACH-355 Excavate Fire Water 3
Excavator;
Trade Tools
N/A
Peach Street
ROW-ELEC-115 Excavate for Vaults 5
Excavator;
Trade Tools
N/A
Bldg. C
C-NW-L7R-310 Erect Structural Metal Stud Walls & Floor - Level 7 - Roofs 2
Crane
N/A
Bldg. C
C-NW-L7R-100 Erect Structural Metal Stud Walls & Floor - Upper Roof 1
Crane
N/A
Bldg. D
D-L34-170 Erect Structural Metal Stud Walls & Floor - Level 4 - Floors 4
Crane
N/A
Bldg. D
D-L45-170 Erect Structural Metal Stud Walls & Floor - Level 4 - Walls 4
Crane
N/A
Week of August 19, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Peach Street
UTIL-PEACH-225 Excavate Site Electrical 10
Excavator
N/A
Peach Street
UTIL-PEACH-355 Excavate Fire Water 3
Excavator
N/A
Peach Street
UTIL-OFF-135 Excavate for New Sewer Line 15
Excavator
N/A
Peach Street
ROW-ELEC-115 Excavate for Vaults 5
Excavator
N/A
Bldg. C
C-SE-LNG-205 Erect CFS Floors & Bottom Track - L4 5
Crane
N/A
Bldg. C
C-SE-LNG-225 Erect CFS Walls - L4 2
Crane
N/A
Bldg. C
C-SE-LNG-235 Erect CFS Floors & Bottom Track - L5 5
Crane
N/A
Bldg. C
C-NW-RF-120 Frame & Sheath Equipment Pads 5
Crane
N/A
Bldg. D
D-L45-170 Erect Structural Metal Stud Walls & Floor - Level 4 - Walls 4
Crane
N/A
Bldg. D
D-L45-160 Erect Structural Metal Stud Walls & Floor - Level 5 - Floors 4
Crane
N/A
Week of August 26, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Peach Street
UTIL-PEACH-225 Excavate Site Electrical 10
Excavator
N/A
Peach Street
UTIL-CS-115 Excavate Sewer 3
Excavator
N/A
Peach Street
UTIL-CHERRY-115 Excavate Sewer 3
Excavator
N/A
Peach Street
ROW-ELEC-135 Excavate for Conduit Pathway 5
Excavator
N/A
Bldg. C
C-SE-LNG-235 Erect CFS Floors & Bottom Track - L5 5
Crane
N/A
Bldg. D
D-L45-160 Erect Structural Metal Stud Walls & Floor - Level 5 - Floors 4
Crane
N/A
Bldg. D
D-L56-170 Erect Structural Metal Stud Walls & Floor - Level 5 - Walls 4
Crane
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
Upgrade Sewer
Canyon Crest Street
(University to Blaine)
TBA
Traffic Along Canyon Crest (University to Blaine)
-
950586B North District Phase 2 - Construction Alert #33
Week of August 5, 2024
Critical Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C East
UTIL-CE-115
Excavate Storm Drain
Excavator; Trade Tools
N/A
Offsite Work
UTIL-OFF-175
Install Point of Connection
Excavator, Boom Lift
N/A
Week of August 12, 2024
Critical Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C East
UTIL-CE-115
Excavate Storm Drain
Excavator; Trade Tools
N/A
Offsite Work
UTIL-OFF-185
Install Piping to Project Site
Excavator, Boom Lift
N/A
Bldg. C
C-NW-L7R-300
Erect Structural Metal Stud Walls & Floor – Level 7 – Walls
Crane
N/A
Bldg. D
D-L56-170
Erect Structural Metal Stud Walls & Floor – Level 5 - Walls
Crane
N/A
Bldg. D
D-L56-160
Erect Structural Metal Stud Walls & Floor – Level 5 - Roof
Crane
N/A
Week of August 19, 2024
Critical Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Site Work (Peach St.)
UTIL-PEACH-205
Excavate Domestic Water
Excavator
N/A
Bldg. D East
UTIL-DE-115
Excavate Storm Drain
Excavator
N/A
Bldg. C
C-NW-L7R-100
Erect Structural Metal Stud Walls & Floor – Upper Roof
Crane
N/A
Bldg. D
D-L56-160
Erect Structural Metal Stud Walls & Floor – Level 5 - Roof
Crane
N/A
Bldg. D
D-L56-180
Erect Structural Metal Stud Walls & Floor – Level 6 - Floors
Crane
N/A
Bldg. D
D-L67-170
Erect Structural Metal Stud Walls & Floor – Level 6 - Walls
Crane
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
-
950586B North District Phase 2 - Construction Alert #32
Week of July 29, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Site Work
UTIL-CS-135
Excavate Storm Drain
Trade Tools
N/A
Site Work
UTIL-PEACH-145
Install Sewer
Trade Tools
N/A
Site Work
UTIL-PEACH-155
Excavate Storm Drain
Trade Tools
N/A
Site Work
UTIL-OFF-165
Excavate for Water POCs
Excavator, Boom Lift
N/A
Site Work
UTIL-OFF-175
Install Point of Connection
Excavator, Boom Lift
N/A
Offsite Work
A2670
Off-Site Street Improvements
Trade Tools
N/A
Bldg. C
C-DS-L3-125
F/R/P Delay Strips
N/A
N/A
Bldg. C
C-NW-L23-100
Priority Framing – Level 2-3
Trade Tools
N/A
Bldg. C
C-NW-L67-110
Erect Structural Metal Stud Walls & Floors – Level 6 - Walls
Trade Tools
N/A
Bldg. C
C-NW-L67-100
Erect Structural Metal Stud Walls & Floors – Level 7 - Floors
Trade Tools
N/A
Bldg. C
C-ML-180
Manlift in Operation
N/A
N/A
Bldg. C
C-ML-120
Manlift in Operation
N/A
N/A
Bldg. C
C-SE-EXT-EN-135
Install Z-Furring Channel for Rigid Insulation
Trade Tools
N/A
Bldg. C
C-SE-EXT-EN-145
Install Rigid Insulation
Trade Tools
N/A
Bldg. C
C-SE-EXT-CN-135
Install Z-Furring Channel for Rigid Insulation
Trade Tools
N/A
Bldg. C
C-SE-EXT-CN-145
Install Rigid Insulation
Trade Tools
N/A
Bldg. C
C-SE-EXT-SW-125
Install Clips for Wood Slats & Shade Canopies
Trade Tools
N/A
Bldg. C
C-SE-EXT-SW-255
Layout / Weld Clips for Curtain Wall System
Trade Tools
N/A
Bldg. C
C-SE-EXT-CS-125
Install Clips for Wood Slats & Shade Canopies
Trade Tools
N/A
Bldg. C
C-SE-EXT-CS-255
Layout / Weld Clips for Curtain Wall System
Trade Tools
N/A
Bldg. C
C-INT-E-135
HVAC Piping Risers / Valves / BSB – Level 3E
Trade Tools
N/A
Bldg. C
C-INT-1E-175
RC Channel Install on Underside of all Floor Joists – Level 1E
Trade Tools
N/A
Bldg. C
C-INT-2E-175
RC Channel Install on Underside of all Floor Joists – Level 2E
Trade Tools
N/A
Bldg. C
C-INT-3E-165
Insulation / Fire & Sound Rating First Pass – Level 3E
Trade Tools
N/A
Bldg. C
C-INT-4E-145
MEPF Hanger & Strap Install – Level 4E
Trade Tools
N/A
Bldg. C
C-INT-4E-155
Early Low Voltage Wire Pull – Level 4E
Trade Tools
N/A
Bldg. C
C-INT-4E-165
Insulation / Fire & Sound Rating First Pass – Level 4E
Trade Tools
N/A
Bldg. C
C-INT-5E-125
Priority Risers & In Floor Piping – Level 5E
Trade Tools
N/A
Bldg. C
C-INT-5E-135
Priority Electrical in Load Bearing Walls & Floors – Level 5E
Trade Tools
N/A
Bldg. C
C-INT-5E-935
Set FCUs – Level 5E
Trade Tools
N/A
Bldg. C
C-INT-5E-145
MEPF Hanger & Strap Install – Level 5E
Trade Tools
N/A
Bldg. C
C-INT-5E-155
Early Low Voltage Wire Pull – Level 5E
Trade Tools
N/A
Bldg. C
C-INT-S-135
HVAC Piping Risers / Valves / BSB / - Level 3S
Trade Tools
N/A
Bldg. C
C-INT-1S-175
RC Channel Install on Underside of all Floor Joists – Level 1S
Trade Tools
N/A
Bldg. C
C-INT-2S-175
RC Channel Install on Underside of all Floor Joists – Level 2S
Trade Tools
N/A
Bldg. C
C-INT-3S-165
Insulation / Fire & Sound Rating First Pass – Level 3S
Trade Tools
N/A
Bldg. C
C-INT-4S-145
MEPF Hanger & Strap Install – Level 4S
Trade Tools
N/A
Bldg. C
C-INT-4S-155
Early Low Voltage Wire Pull – Level 4S
Trade Tools
N/A
Bldg. C
C-INT-4S-165
Insulation / Fire & Sound Rating First Pass – Level 4S
Trade Tools
N/A
Bldg. C
C-INT-5S-125
Priority Risers & In Floor Piping – Level 5S
Trade Tools
N/A
Bldg. C
C-INT-5S-135
Priority Electrical in Load Bearing Walls & Floors – Level 5S
Trade Tools
N/A
Bldg. C
C-INT-5S-935
Set FCUs – Level 5S
Trade Tools
N/A
Bldg. C
C-INT-5S-145
MEPF Hanger & Strap Install – Level 5S
Trade Tools
N/A
Bldg. C
C-INT-5S-155
Early Low Voltage Wire Pull – Level 5S
Trade Tools
N/A
Bldg. C
C-INT-N-115
HVAC Piping Risers / Valves / BSB – Level 1N
Trade Tools
N/A
Bldg. C
C-INT-2N-115
Pre MEPF Rating / Shaft Pass – Level 2N
Trade Tools
N/A
Bldg. C
C-INT-2N-925
HVAC Piping / FCU Hanger & Strap Install – Level 2N
Trade Tools
N/A
Bldg. C
C-INT-4N-915
Core HVAC Piping Penetrations – Level 4N
Trade Tools
N/A
Bldg. C
C-INT-4N-905
Core MEP Penetrations – Level 4N
Trade Tools
N/A
Bldg. C
C-INT-W-115
HVAC Piping Risers / Valves / BSB – Level 1W
Trade Tools
N/A
Bldg. C
C-INT-2W-115
Pre MEPF Rating / Shaft Pass – Level 2W
Trade Tools
N/A
Bldg. C
C-INT-2W-925
HVAC Piping / FCU Hanger & Strap Install– Level 2W
Trade Tools
N/A
Bldg. C
C-INT-4W-915
Core HVAC Piping Penetrations – Level 4W
Trade Tools
N/A
Bldg. C
C-INT-4W-905
Core MEP Penetrations – Level 4W
Trade Tools
N/A
Bldg. C
C-NW-L1R-130
MEPF Hanger & Strap Install – Level 1
Trade Tools
N/A
Bldg. D
D-DS-L3-115
Cure Decks for Delay Strips (28 Calendar Days)
Excavator, Boom Lift
N/A
Bldg. D
D-L12-1000
Priority Framing – Level 1-2
Trade Tools
N/A
Bldg. D
D-L23-1000
Priority Framing – Level 2-3
Trade Tools
N/A
Bldg. D
D-L34-170
Erect Structural Metal Stud Walls & Floor – Level 4 - Floors
Excavator, Boom Lift
N/A
Bldg. D
D-L45-170
Erect Structural Metal Stud Walls & Floor – Level 4 - Walls
Excavator, Boom Lift
N/A
Bldg. D
D-ML-120
Manlift in Operation
Trade Tools
N/A
Bldg. D
D-INT-1N-115
Pre MEPF Rating / Shaft Pass – Level 1N
Trade Tools
N/A
Bldg. D
D-INT-1N-925
HVAC Piping / FCU Hanger & Strap Install – Level 1N
Trade Tools
N/A
Bldg. D
D-L1R-100
Pre MEPF Rating / Shaft Pass – Level 1
Trade Tools
N/A
Bldg. D
D-CAFE-100
Cafe BuildoutTrade Tools
N/A
Site Work
LOT-145
Install Irrigation Sleeves
Trade Tools
N/A
Site Work
LOT-155
Grade for Curbs, Gutters & Swales
Trade Tools
N/A
Week of August 5, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C South
UTIL-CS-145
Install Storm Drain
Trade Tools
N/A
Bldg. C East
UTIL-CE-115
Excavate Storm Drain
Excavator; Trade Tools
N/A
Site Work (Peach St.)
UTIL-PEACH-165
Install Storm Drain Structures
Trade Tools
N/A
Site Work (Peach St.)
UTIL-PEACH-175
Install Storm Drain
Trade Tools
N/A
Site Work (Peach St.)
UTIL-PEACH-185
Excavate Fire Water
Trade Tools
N/A
Offsite Work
UTIL-OFF-175
Install Point of Connection
Excavator, Boom Lift
N/A
Offsite Work
A2670
Off-Site Street Improvements
Trade Tools
N/A
Bldg. C
C-NW-L7R-300
Erect Structural Metal Stud Walls & Floor – Level 7 – Walls
Trade Tools
N/A
Bldg. C
C-SE-EXT-EN-135
Install Z-Furring Channel for Rigid Insulation
Trade Tools
N/A
Bldg. C
C-SE-EXT-EN-145
Install Rigid Insulation
Trade Tools
N/A
Bldg. C
C-SE-EXT-CN-135
Install Z-Furring Channel for Rigid Insulation
Trade Tools
N/A
Bldg. C
C-SE-EXT-CN-145
Install Rigid Insulation
Trade Tools
N/A
Bldg. C
C-SE-EXT-SW-125
Install Clips for Wood Slats & Shade Canopies
Trade Tools
N/A
Bldg. C
C-SE-EXT-CS-125
Install Clips for Wood Slats & Shade Canopies
Trade Tools
N/A
Bldg. C
C-INT-E-135
HVAC Piping Risers / Valves / BSB – Level 3E
Trade Tools
N/A
Bldg. C
C-INT-E-145
HVAC Piping Risers / Valves / BSB – Level 4E
Trade Tools
N/A
Bldg. C
C-INT-2E-175
RC Channel Install on Underside of all Floor Joists – Level 2E
Trade Tools
N/A
Bldg. C
C-INT-3E-175
RC Channel Install on Underside of all Floor Joists – Level 3E
Trade Tools
N/A
Bldg. C
C-INT-4E-165
Insulation / Fire & Sound Rating First Pass – Level 4E
Trade Tools
N/A
Bldg. C
C-INT-5E-145
MEPF Hanger & Strap Install – Level 5E
Trade Tools
N/A
Bldg. C
C-INT-5E-155
Early Low Voltage Wire Pull – Level 5E
Trade Tools
N/A
Bldg. C
C-INT-5E-165
Insulation / Fire & Sound Rating First Pass – Level 5E
Trade Tools
N/A
Bldg. C
C-INT-S-135
HVAC Piping Risers / Valves / BSB / - Level 3S
Trade Tools
N/A
Bldg. C
C-INT-S-145
HVAC Piping Risers / Valves / BSB / - Level 4S
Trade Tools
N/A
Bldg. C
C-INT-2S-175
RC Channel Install on Underside of all Floor Joists – Level 2S
Trade Tools
N/A
Bldg. C
C-INT-3S-175
RC Channel Install on Underside of all Floor Joists – Level 3S
Trade Tools
N/A
Bldg. C
C-INT-4S-165
Insulation / Fire & Sound Rating First Pass – Level 4S
Trade Tools
N/A
Bldg. C
C-INT-5S-145
MEPF Hanger & Strap Install – Level 5S
Trade Tools
N/A
Bldg. C
C-INT-5S-155
Early Low Voltage Wire Pull – Level 5S
Trade Tools
N/A
Bldg. C
C-INT-5S-165
Insulation / Fire & Sound Rating First Pass – Level 5S
Trade Tools
N/A
Bldg. C
C-INT-N-125
HVAC Piping Risers / Valves / BSB – Level 2N
Trade Tools
N/A
Bldg. C
C-INT-2N-115
Pre MEPF Rating / Shaft Pass – Level 2N
Trade Tools
N/A
Bldg. C
C-INT-2N-925
HVAC Piping / FCU Hanger & Strap Install – Level 2N
Trade Tools
N/A
Bldg. C
C-INT-2N-125
Priority Risers & In Floor Piping – Level 2N
Trade Tools
N/A
Bldg. C
C-INT-2N-135
Priority Electrical in Load Bearing Walls & Floors – Level 2N
Trade Tools
N/A
Bldg. C
C-INT-2N-935
Set FCU’s – Level 2N
Trade Tools
N/A
Bldg. C
C-INT-2N-145
MEPF Hanger & Strap Install – Level 2N
Trade Tools
N/A
Bldg. C
C-INT-2N-155
Early Low Voltage Wire Pull – Level 2N
Trade Tools
N/A
Bldg. C
C-INT-3N-925
HVAC Piping / FCU Hanger & Strap Install – Level 3N
Trade Tools
N/A
Bldg. C
C-INT-5N-915
Core HVAC Piping Penetrations – Level 5N
Trade Tools
N/A
Bldg. C
C-INT-5N-905
Core MEP Penetrations – Level 5N
Trade Tools
N/A
Bldg. C
C-INT-W-125
HVAC Piping Risers / Valves / BSB – Level 2W
Trade Tools
N/A
Bldg. C
C-INT-2W-115
Pre MEPF Rating / Shaft Pass – Level 2W
Trade Tools
N/A
Bldg. C
C-INT-2W-925
HVAC Piping / FCU Hanger & Strap Install– Level 2W
Trade Tools
N/A
Bldg. C
C-INT-2W-925
HVAC Piping / FCU Hanger & Strap Install– Level 2W
Trade Tools
N/A
Bldg. C
C-INT-2W-125
Priority Risers & In Floor Piping – Level 2W
Trade Tools
N/A
Bldg. C
C-INT-2W-135
Priority Electrical in Load Bearing Walls & Floors – Level 2W
Trade Tools
N/A
Bldg. C
C-INT-2W-935
Set FCU’s – Level 2W
Trade Tools
N/A
Bldg. C
C-INT-2W-145
MEPF Hanger & Strap Install – Level 2W
Trade Tools
N/A
Bldg. C
C-INT-2W-155
Early Low Voltage Wire Pull – Level 2W
Trade Tools
N/A
Bldg. C
C-INT-3W-925
HVAC Piping / FCU Hanger & Strap Install – Level 3W
Trade Tools
N/A
Bldg. C
C-INT-5W-915
Core HVAC Piping Penetrations – Level 5W
Trade Tools
N/A
Bldg. C
C-INT-5W-905
Core MEP Penetrations – Level 5W
Trade Tools
N/A
Bldg. C
C-NW-L1R-290
Insulation / Fire & Sound Rating First Pass – Level 1
Trade Tools
N/A
Bldg. D
D-DS-L3-115
Cure Decks for Delay Strips (28 Calendar Days)
Trade Tools
N/A
Bldg. D
D-DS-L3-125
F/R/P Delay Strips
N/A
N/A
Bldg. D
D-L23-1000
Priority Framing – Level 2-3
Trade Tools
N/A
Bldg. D
D-L45-170
Erect Structural Metal Stud Walls & Floor – Level 4 - Walls
Trade Tools
N/A
Bldg. D
D-L45-160
Erect Structural Metal Stud Walls & Floor – Level 5 - Floors
Trade Tools
N/A
Bldg. D
D-ML-120
Manlift in Operation
Trade Tools
N/A
Bldg. D
D-INT-S-115
HVAC Piping Risers / Valves / BSB – Level 1S
Trade Tools
N/A
Bldg. D
D-INT-N-115
HVAC Piping Risers / Valves / BSB – Level 1N
Trade Tools
N/A
Bldg. D
D-INT-1N-115
Pre MEPF Rating / Shaft Pass – Level 1N
Trade Tools
N/A
Bldg. D
D-INT-1N-925
HVAC Piping / FCU Hanger & Strap Install – Level 1N
Trade Tools
N/A
Bldg. D
D-INT-1N-125
Priority Risers & In Floor Piping – Level 1N
Trade Tools
N/A
Bldg. D
D-INT-1N-135
Priority Electrical in Load Bearing Walls & Floors – Level 1N
Trade Tools
N/A
Bldg. D
D-INT-1N-935
Set FCU’s – Level 1N
Trade Tools
N/A
Bldg. D
D-L1R-100
Pre MEPF Rating / Shaft Pass – Level 1
Trade Tools
N/A
Bldg. D
D-L1R-110
Priority Risers & In Floor Piping – Level 1
Trade Tools
N/A
Bldg. D
D-L1R-120
Priority Electrical in Load Bearing Walls & Floors – Level 1
Trade Tools
N/A
Bldg. D
D-CAFE-100
Cafe BuildoutTrade Tools
N/A
Site Work
LOT-155
Grade for Curbs, Gutters & Swales
Trade Tools
N/A
Site Work
LOT-165
Install Curbs, Gutters & flow Lines
Trade Tools
N/A
Week of August 12, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Bldg. C South
UTIL-CS-145
Install Storm Drain
Trade Tools
N/A
Bldg. C East
UTIL-CE-115
Excavate Storm Drain
Excavator; Trade Tools
N/A
Site Work (Peach St.)
UTIL-PEACH-175
Install Storm Drain
Trade Tools
N/A
Site Work (Peach St.)
UTIL-PEACH-195
Install Fire Water
Trade Tools
N/A
Offsite Work
UTIL-OFF-175
Install Point of Connection
Excavator, Boom Lift
N/A
Offsite Work
UTIL-OFF-185
Install Piping to Project Site
Excavator, Boom Lift
N/A
Offsite Work
A2670
Off-Site Street Improvements
Trade Tools
N/A
Bldg. C
C-NW-L7R-300
Erect Structural Metal Stud Walls & Floor – Level 7 – Walls
Trade Tools; Crane
N/A
Bldg. C
C-NW-L7R-310
Erect Structural Metal Stud Walls & Floor – Level 7 – Roofs
Trade Tools; Crane
N/A
Bldg. C
C-SE-EXT-EN-145
Install Rigid Insulation
Trade Tools
N/A
Bldg. C
C-SE-EXT-EN-155
Waterproofing
Trade Tools
N/A
Bldg. C
C-SE-EXT-CN-145
Install Rigid Insulation
Trade Tools
N/A
Bldg. C
C-SE-EXT-CN-155
Waterproofing
Trade Tools
N/A
Bldg. C
C-SE-EXT-SW-135
Install Z-Furring Channel for Rigid Insulation
Trade Tools
N/A
Bldg. C
C-SE-EXT-CS-135
Install Z-Furring Channel for Rigid Insulation
Trade Tools
N/A
Bldg. C
C-INT-E-145
HVAC Piping Risers / Valves / BSB – Level 4E
Trade Tools
N/A
Bldg. C
C-INT-3E-175
RC Channel Install on Underside of all Floor Joists – Level 3E
Trade Tools
N/A
Bldg. C
C-INT-5E-165
Insulation / Fire & Sound Rating First Pass – Level 5E
Trade Tools
N/A
Bldg. C
C-INT-S-145
HVAC Piping Risers / Valves / BSB / - Level 4S
Trade Tools
N/A
Bldg. C
C-INT-3S-175
RC Channel Install on Underside of all Floor Joists – Level 3S
Trade Tools
N/A
Bldg. C
C-INT-5S-165
Insulation / Fire & Sound Rating First Pass – Level 5S
Trade Tools
N/A
Bldg. C
C-INT-N-125
HVAC Piping Risers / Valves / BSB – Level 2N
Trade Tools
N/A
Bldg. C
C-INT-2N-145
MEPF Hanger & Strap Install – Level 2N
Trade Tools
N/A
Bldg. C
C-INT-2N-155
Early Low Voltage Wire Pull – Level 2N
Trade Tools
N/A
Bldg. C
C-INT-2N-165
Insulation / Fire & Sound Rating First Pass – Level 2N
Trade Tools
N/A
Bldg. C
C-INT-4N-925
HVAC Piping / FCU Hanger & Strap Install – Level 4N
Trade Tools
N/A
Bldg. C
C-INT-5N-925
HVAC Piping / FCU Hanger & Strap Install – Level 5N
Trade Tools
N/A
Bldg. C
C-INT-W-125
HVAC Piping Risers / Valves / BSB – Level 2W
Trade Tools
N/A
Bldg. C
C-INT-2W-145
MEPF Hanger & Strap Install – Level 2W
Trade Tools
N/A
Bldg. C
C-INT-2W-155
Early Low Voltage Wire Pull – Level 2W
Trade Tools
N/A
Bldg. C
C-INT-2W-165
Insulation / Fire & Sound Rating First Pass – Level 2W
Trade Tools
N/A
Bldg. C
C-INT-4W-925
HVAC Piping / FCU Hanger & Strap Install – Level 4W
Trade Tools
N/A
Bldg. C
C-INT-5W-925
HVAC Piping / FCU Hanger & Strap Install – Level 5W
Trade Tools
N/A
Bldg. C
C-NW-L1R-150
RC Channel Install on Underside of all Floor Joists (Production Framing) – Level 1
Trade Tools
N/A
Bldg. D
D-DS-L3-125
F/R/P Delay Strips
N/A
N/A
Bldg. D
D-L23-1000
Priority Framing – Level 2-3
Trade Tools
N/A
Bldg. D
D-L56-170
Erect Structural Metal Stud Walls & Floor – Level 5 - Walls
Trade Tools; Crane
N/A
Bldg. D
D-L56-160
Erect Structural Metal Stud Walls & Floor – Level 5 - Roof
Trade Tools; Crane
N/A
Bldg. D
D-ML-120
Manlift in Operation
Trade Tools
N/A
Bldg. D
D-INT-S-115
HVAC Piping Risers / Valves / BSB – Level 1S
Trade Tools
N/A
Bldg. D
D-INT-2S-115
Pre MEPF Rating / Shaft Pass – Level 2S
Trade Tools
N/A
Bldg. D
D-INT-2S-925
HVAC Piping / FCU Hanger & Strap Install– Level 2S
Trade Tools
N/A
Bldg. D
D-INT-3S-915
Core HVAC Piping Penetrations – Level 3S
Trade Tools
N/A
Bldg. D
D-INT-3S-905
Core MEP Penetrations – Level 3S
Trade Tools
N/A
Bldg. D
D-INT-N-115
HVAC Piping Risers / Valves / BSB – Level 1N
Trade Tools
N/A
Bldg. D
D-INT-1N-935
Set FCU’s – Level 1N
Trade Tools
N/A
Bldg. D
D-INT-1N-145
MEPF Hanger & Strap Install – Level 1N
Trade Tools
N/A
Bldg. D
D-INT-1N-155
Early Low Voltage Wire Pull – Level 1N
Trade Tools
N/A
Bldg. D
D-INT-1N-165
Insulation / Fire & Sound Rating First Pass – Level 1N
Trade Tools
N/A
Bldg. D
D-INT-2N-115
Pre MEPF Rating / Shaft Pass – Level 2N
Trade Tools
N/A
Bldg. D
D-INT-2N-925
HVAC Piping / FCU Hanger & Strap Install – Level 2N
Trade Tools
N/A
Bldg. D
D-INT-3N-915
Core HVAC Piping Penetrations – Level 3N
Trade Tools
N/A
Bldg. D
D-INT-3N-905
Core MEP Penetrations – Level 3N
Trade Tools
N/A
Bldg. D
D-L1R-110
Priority Risers & In Floor Piping – Level 1
Trade Tools
N/A
Bldg. D
D-L1R-120
Priority Electrical in Load Bearing Walls & Floors – Level 1
Trade Tools
N/A
Bldg. D
D-L1R-130
MEPF Hanger & Strap Install – Level 1
Trade Tools
N/A
Bldg. D
D-CAFE-100
Cafe BuildoutTrade Tools
N/A
Site Work
LOT-165
Install Curbs, Gutters & flow Lines
Trade Tools
N/A
Site Work
LOT-175
Install Swales & Dissipators
Trade Tools
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
-
950586B North District Phase 2 - Construction Alert #31
Week of July 15, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Site Work
UTIL-CS-115
Excavate Sewer
Excavator, Boom Lift
N/A
Site Work
UTIL-PEACH-115
Excavate Sewer
Excavator, Boom Lift
N/A
Site Work
UTIL-OFF-155
Backfill Sewer
Trade Tools
N/A
Site Work
UTIL-OFF-165
Excavate for Water POCs
Excavator, Boom Lift
N/A
Offsite Work
A2670
Off-Site Street Improvements
Trade Tools
N/A
Bldg. C
C-DS-L3-115
Cure Decks for Delay Strips (28 Calendar Days)
Excavator, Boom Lift
N/A
Bldg. C
C-NW-L12-100
Priority Framing – Level 1-2
Trade Tools
N/A
Bldg. C
C-NW-L23-100
Priority Framing – Level 2-3
Trade Tools
N/A
Bldg. C
C-NW-L45-110
Erect Structural Metal Stud Walls & Floor – Level 4 - Walls
Crane
N/A
Bldg. C
C-NW-L45-100
Erect Structural Metal Stud Walls & Floor – Level 5 - Floors
Crane
N/A
Bldg. C
C-STR-2020
Fire Tape Drywall – CST03
Trade Tools
N/A
Bldg. C
C-ML-180
Manlift in Operation
N/A
N/A
Bldg. C
C-ML-120
Manlift in Operation
N/A
N/A
Bldg. C
C-SE-RF-130
Field Measure / Procure Equipment Pad Sheet Metal Caps
Trade Tools
N/A
Bldg. C
C-SE-EXT-EN-125
Install Clips for Wood Slats & Shade Canopies
Trade Tools
N/A
Bldg. C
C-SE-EXT-EN-255
Layout / Weld Clips for Curtain Wall System
Trade Tools
N/A
Bldg. C
C-SE-EXT-CN-125
Install Clips for Wood Slats & Shade Canopies
Trade Tools
N/A
Bldg. C
C-SE-EXT-SW-115
Scaffold Setup
Trade Tools
N/A
Bldg. C
C-SE-EXT-CS-115
Scaffold Setup
Trade Tools
N/A
Bldg. C
C-INT-E-115
HVAC Piping Risers / Valves / BSB – Level 1E
Trade Tools
N/A
Bldg. C
C-INT-E-125
HVAC Piping Risers / Valves / BSB – Level 2E
Trade Tools
N/A
Bldg. C
C-INT-1E-145
MEPF Hanger & Strap Install – Level 1E
Trade Tools
N/A
Bldg. C
C-INT-1E-155
Early Low Voltage Wire Pull – Level 1E
Trade Tools
N/A
Bldg. C
C-INT-1E-165
Insulation / Fire & Sound Rating First Pass – Level 1E
Trade Tools
N/A
Bldg. C
C-INT-2E-125
Priority Risers & In Floor Piping – Level 2E
Trade Tools
N/A
Bldg. C
C-INT-2E-135
Priority Electrical in Load Bearing Walls & Floors – Level 2E
Trade Tools
N/A
Bldg. C
C-INT-2E-935
Set FCU’s – Level 2E
Trade Tools
N/A
Bldg. C
C-INT-2E-145
MEPF Hanger & Strap Install – Level 2E
Trade Tools
N/A
Bldg. C
C-INT-2E-155
Early Low Voltage Wire Pull – Level 2E
Trade Tools
N/A
Bldg. C
C-INT-3E-115
Pre MEPF Rating / Shaft Pass – Level 3E
Trade Tools
N/A
Bldg. C
C-INT-3E-125
Priority Risers & In Floor Piping – Level 3E
Trade Tools
N/A
Bldg. C
C-INT-3E-135
Priority Electrical in Load Bearing Walls & Floors – Level 3E
Trade Tools
N/A
Bldg. C
C-INT-3E-935
Set FCU’s – Level 3E
Trade Tools
N/A
Bldg. C
C-INT-4E-115
Pre MEPF Rating / Shaft Pass – Level 4E
Trade Tools
N/A
Bldg. C
C-INT-S-115
HVAC Piping Risers / Valves / BSB – Level 1S
Trade Tools
N/A
Bldg. C
C-INT-S-125
HVAC Piping Risers / Valves / BSB – Level 2S
Trade Tools
N/A
Bldg. C
C-INT-1S-145
MEPF Hanger & Strap Install – Level 1S
Trade Tools
N/A
Bldg. C
C-INT-1S-155
Early Low Voltage Wire Pull – Level 1S
Trade Tools
N/A
Bldg. C
C-INT-1S-165
Insulation / Fire & Sound Rating First Pass – Level 1S
Trade Tools
N/A
Bldg. C
C-INT-2S-125
Priority Risers & In Floor Piping – Level 2S
Trade Tools
N/A
Bldg. C
C-INT-2S-135
Priority Electrical in Load Bearing Walls & Floors – Level 2S
Trade Tools
N/A
Bldg. C
C-INT-2S-935
Set FCU’s – Level 2S
Trade Tools
N/A
Bldg. C
C-INT-2S-145
MEPF Hanger & Strap Install – Level 2S
Trade Tools
N/A
Bldg. C
C-INT-2S-155
Early Low Voltage Wire Pull – Level 2S
Trade Tools
N/A
Bldg. C
C-INT-3S-115
Pre MEPF Rating / Shaft Pass – Level 3S
Trade Tools
N/A
Bldg. C
C-INT-3S-125
Priority Risers & In Floor Piping – Level 3S
Trade Tools
N/A
Bldg. C
C-INT-3S-135
Priority Electrical in Load Bearing Walls & Floors – Level 3S
Trade Tools
N/A
Bldg. C
C-INT-3S-935
Set FCU’s – Level 3S
Trade Tools
N/A
Bldg. C
C-INT-4S-115
Pre MEPF Rating / Shaft Pass – Level 4S
Trade Tools
N/A
Bldg. C
C-NW-L1R-100
Pre MEPF Rating / Shaft Pass – Level 1
Trade Tools
N/A
Bldg. C
C-NW-E1-290
Infill Wall Framing – Main Electrical Room C129
Trade Tools
N/A
Bldg. C
C-NW-E1-190
HVAC Rough Ins
Trade Tools
N/A
Bldg. C
C-NW-E1-300
Infill Wall Framing – Inverter Room C125
Trade Tools
N/A
Bldg. C
C-NW-E1-320
HVAC Rough Ins
Trade Tools
N/A
Bldg. D
FR04-135
F/R/P Leaveout Slab on Grade
N/A
N/A
Bldg. D
D-DECK-L2N-265
Remove Re-Shores – L1
Trade Tools
N/A
Bldg. D
D-DS-L2-125
F/R/P Delay Strips
N/A
N/A
Bldg. D
D-DECK-L3W-255
Strip Edge Form & Prep for Stress
Trade Tools
N/A
Bldg. D
D-DECK-L3N-235
Cure for Stress
Trade Tools
N/A
Bldg. D
D-DECK-L3N-265
Cure for CFS Erection
Trade Tools
N/A
Bldg. D
D-DECK-L3N-245
Stress
Trade Tools
N/A
Bldg. D
D-DECK-L3N-225
Strip & Haul of Deck System
Trade Tools
N/A
Bldg. D
D-DS-L3-115
Cure Decks for Delay Strips (28 Calendar Days)
Excavator, Boom Lift
N/A
Bldg. D
D-L12-1000
Priority Framing – Level 1-2
Trade Tools
N/A
Bldg. D
D-L34-160
Erect Structural Metal Stud Walls & Floor – Level 3 - Walls
Excavator, Boom Lift
N/A
Bldg. D
D-ML-110
Erect / Certify Manlift
Trade Tools
N/A
Site Work
LOT-125
Install Site Lighting Electrical Conduit
Trade Tools
N/A
Site Work
LOT-135
Install Site Lighting Pole Bases
Trade Tools
N/A
Week of July 22, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Site Work
UTIL-CS-125
Install Sewer
Trade Tools
N/A
Site Work
UTIL-PEACH-125
Install Sewer Manholes
Trade Tools
N/A
Site Work
UTIL-PEACH-135
Install Grease Interceptor
Trade Tools
N/A
Site Work
UTIL-OFF-165
Excavate for Water POCs
Excavator, Boom Lift
N/A
Offsite Work
A2670
Off-Site Street Improvements
Trade Tools
N/A
Bldg. C
C-DS-L3-115
Cure Decks for Delay Strips (28 Calendar Days)
Trade Tools
N/A
Bldg. C
C-DS-L3-125
F/R/P Delay Strips
N/A
N/A
Bldg. C
C-NW-L23-100
Priority Framing – Level 2-3
Trade Tools
N/A
Bldg. C
C-NW-L56-110
Erect Structural Metal Stud Walls & Floor – Level 5 - Walls
Trade Tools
N/A
Bldg. C
C-NW-L56-100
Erect Structural Metal Stud Walls & Floor – Level 6 - Floors
Trade Tools
N/A
Bldg. C
C-ML-180
Manlift in Operation
N/A
N/A
Bldg. C
C-ML-120
Manlift in Operation
N/A
N/A
Bldg. C
C-SE-RF-130
Field Measure / Procure Equipment Pad Sheet Metal Caps
Trade Tools
N/A
Bldg. C
C-SE-EXT-EN-125
Install Clips for Wood Slats & Shade Canopies
Trade Tools
N/A
Bldg. C
C-SE-EXT-EN-135
Install Z-Furring Channel for Rigid Insulation
Trade Tools
N/A
Bldg. C
C-SE-EXT-CN-125
Install Clips for Wood Slats & Shade Canopies
Trade Tools
N/A
Bldg. C
C-SE-EXT-CN-135
Install Z-Furring Channel for Rigid Insulation
Trade Tools
N/A
Bldg. C
C-SE-EXT-SW-115
Scaffold Setup
Trade Tools
N/A
Bldg. C
C-SE-EXT-CS-115
Scaffold Setup
Trade Tools
N/A
Bldg. C
C-INT-E-125
HVAC Piping Risers / Valves / BSB – Level 2E
Trade Tools
N/A
Bldg. C
C-INT-1E-175
RC Channel Install on Underside of all Floor Joists – Level 1E
Trade Tools
N/A
Bldg. C
C-INT-2E-165
Insulation / Fire & Sound Rating First Pass – Level 2E
Trade Tools
N/A
Bldg. C
C-INT-3E-935
Set FCU’s – Level 3E
Trade Tools
N/A
Bldg. C
C-INT-3E-145
MEPF Hanger & Strap Install – Level 3E
Trade Tools
N/A
Bldg. C
C-INT-3E-155
Early Low Voltage Wire Pull – Level 3E
Trade Tools
N/A
Bldg. C
C-INT-3E-165
Insulation / Fire & Sound Rating First Pass – Level 3E
Trade Tools
N/A
Bldg. C
C-INT-4E-115
Pre MEPF Rating / Shaft Pass – Level 4E
Trade Tools
N/A
Bldg. C
C-INT-4E-125
Priority Risers & In Floor Piping – Level 4E
Trade Tools
N/A
Bldg. C
C-INT-4E-135
Priority Electrical in Load Bearing Walls & Floors – Level 4E
Trade Tools
N/A
Bldg. C
C-INT-4E-935
Set FCUs – Level 4E
Trade Tools
N/A
Bldg. C
C-INT-4E-145
MEPF Hanger & Strap Install – Level 4E
Trade Tools
N/A
Bldg. C
C-INT-4E-155
Early Low Voltage Wire Pull – Level 4E
Trade Tools
N/A
Bldg. C
C-INT-5E-115
Pre MEPF Rating / Shaft Pass – Level 5E
Trade Tools
N/A
Bldg. C
C-INT-S-125
HVAC Piping Risers / Valves / BSB – Level 2S
Trade Tools
N/A
Bldg. C
C-INT-1S-175
RC Channel Install on Underside of all Floor Joists – Level 1S
Trade Tools
N/A
Bldg. C
C-INT-2S-165
Insulation / Fire & Sound Rating First Pass – Level 2S
Trade Tools
N/A
Bldg. C
C-INT-3S-935
Set FCUs – Level 3S
Trade Tools
N/A
Bldg. C
C-INT-3S-145
MEPF Hanger & Strap Install – Level 3S
Trade Tools
N/A
Bldg. C
C-INT-3S-155
Early Low Voltage Wire Pull – Level 3S
Trade Tools
N/A
Bldg. C
C-INT-3S-165
Insulation / Fire & Sound Rating First Pass – Level 3S
Trade Tools
N/A
Bldg. C
C-INT-4S-115
Pre MEPF Rating / Shaft Pass – Level 4S
Trade Tools
N/A
Bldg. C
C-INT-4S-125
Priority Risers & In Floor Piping – Level 4S
Trade Tools
N/A
Bldg. C
C-INT-4S-135
Priority Electrical in Load Bearing Walls & Floors – Level 4S
Trade Tools
N/A
Bldg. C
C-INT-4S-935
Set FCUs – Level 4S
Trade Tools
N/A
Bldg. C
C-INT-4S-145
MEPF Hanger & Strap Install – Level 4S
Trade Tools
N/A
Bldg. C
C-INT-4S-155
Early Low Voltage Wire Pull – Level 4S
Trade Tools
N/A
Bldg. C
C-INT-5S-115
Pre MEPF Rating / Shaft Pass – Level 5S
Trade Tools
N/A
Bldg. C
C-INT-N-115
HVAC Piping Risers / Valves / BSB – Level 1N
Trade Tools
N/A
Bldg. C
C-INT-3N-915
Core HVAC Piping Penetrations – Level 3N
Trade Tools
N/A
Bldg. C
C-INT-3N-905
Core MEP Penetrations – Level 3N
Trade Tools
N/A
Bldg. C
C-INT-W-115
HVAC Piping Risers / Valves / BSB – Level 1W
Trade Tools
N/A
Bldg. C
C-INT-3W-915
Core HVAC Piping Penetrations – Level 3W
Trade Tools
N/A
Bldg. C
C-INT-3W-905
Core MEP Penetrations – Level 3W
Trade Tools
N/A
Bldg. C
C-NW-L1R-100
Pre MEPF Rating / Shaft Pass – Level 1
Trade Tools
N/A
Bldg. C
C-NW-L1R-110
Priority Risers & In Floor Piping – Level 1
Trade Tools
N/A
Bldg. C
C-NW-L1R-120
Priority Electrical in Load Bearing Walls & Floors – Level 1
Trade Tools
N/A
Bldg. D
D-DS-L3-115
Cure Decks for Delay Strips (28 Calendar Days)
Excavator, Boom Lift
N/A
Bldg. D
D-L12-1000
Priority Framing – Level 1-2
Trade Tools
N/A
Bldg. D
D-L34-160
Erect Structural Metal Stud Walls & Floor – Level 3 - Walls
Excavator, Boom Lift
N/A
Bldg. D
D-L34-170
Erect Structural Metal Stud Walls & Floor – Level 4 - Floors
Excavator, Boom Lift
N/A
Bldg. D
D-ML-110
Erect / Certify Manlift
Trade Tools
N/A
Bldg. D
D-ML-120
Manlift in Operation
Trade Tools
N/A
Site Work
LOT-135
Install Site Lighting Pole Bases
Trade Tools
N/A
Site Work
LOT-145
Install Irrigation Sleeves
Trade Tools
N/A
Week of July 29, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Site Work
UTIL-CS-135
Excavate Storm Drain
Trade Tools
N/A
Site Work
UTIL-PEACH-145
Install Sewer
Trade Tools
N/A
Site Work
UTIL-PEACH-155
Excavate Storm Drain
Trade Tools
N/A
Site Work
UTIL-OFF-165
Excavate for Water POCs
Excavator, Boom Lift
N/A
Site Work
UTIL-OFF-175
Install Point of Connection
Excavator, Boom Lift
N/A
Offsite Work
A2670
Off-Site Street Improvements
Trade Tools
N/A
Bldg. C
C-DS-L3-125
F/R/P Delay Strips
N/A
N/A
Bldg. C
C-NW-L23-100
Priority Framing – Level 2-3
Trade Tools
N/A
Bldg. C
C-NW-L67-110
Erect Structural Metal Stud Walls & Floors – Level 6 - Walls
Trade Tools
N/A
Bldg. C
C-NW-L67-100
Erect Structural Metal Stud Walls & Floors – Level 7 - Floors
Trade Tools
N/A
Bldg. C
C-ML-180
Manlift in Operation
N/A
N/A
Bldg. C
C-ML-120
Manlift in Operation
N/A
N/A
Bldg. C
C-SE-EXT-EN-135
Install Z-Furring Channel for Rigid Insulation
Trade Tools
N/A
Bldg. C
C-SE-EXT-EN-145
Install Rigid Insulation
Trade Tools
N/A
Bldg. C
C-SE-EXT-CN-135
Install Z-Furring Channel for Rigid Insulation
Trade Tools
N/A
Bldg. C
C-SE-EXT-CN-145
Install Rigid Insulation
Trade Tools
N/A
Bldg. C
C-SE-EXT-SW-125
Install Clips for Wood Slats & Shade Canopies
Trade Tools
N/A
Bldg. C
C-SE-EXT-SW-255
Layout / Weld Clips for Curtain Wall System
Trade Tools
N/A
Bldg. C
C-SE-EXT-CS-125
Install Clips for Wood Slats & Shade Canopies
Trade Tools
N/A
Bldg. C
C-SE-EXT-CS-255
Layout / Weld Clips for Curtain Wall System
Trade Tools
N/A
Bldg. C
C-INT-E-135
HVAC Piping Risers / Valves / BSB – Level 3E
Trade Tools
N/A
Bldg. C
C-INT-1E-175
RC Channel Install on Underside of all Floor Joists – Level 1E
Trade Tools
N/A
Bldg. C
C-INT-2E-175
RC Channel Install on Underside of all Floor Joists – Level 2E
Trade Tools
N/A
Bldg. C
C-INT-3E-165
Insulation / Fire & Sound Rating First Pass – Level 3E
Trade Tools
N/A
Bldg. C
C-INT-4E-145
MEPF Hanger & Strap Install – Level 4E
Trade Tools
N/A
Bldg. C
C-INT-4E-155
Early Low Voltage Wire Pull – Level 4E
Trade Tools
N/A
Bldg. C
C-INT-4E-165
Insulation / Fire & Sound Rating First Pass – Level 4E
Trade Tools
N/A
Bldg. C
C-INT-5E-125
Priority Risers & In Floor Piping – Level 5E
Trade Tools
N/A
Bldg. C
C-INT-5E-135
Priority Electrical in Load Bearing Walls & Floors – Level 5E
Trade Tools
N/A
Bldg. C
C-INT-5E-935
Set FCUs – Level 5E
Trade Tools
N/A
Bldg. C
C-INT-5E-145
MEPF Hanger & Strap Install – Level 5E
Trade Tools
N/A
Bldg. C
C-INT-5E-155
Early Low Voltage Wire Pull – Level 5E
Trade Tools
N/A
Bldg. C
C-INT-S-135
HVAC Piping Risers / Valves / BSB / - Level 3S
Trade Tools
N/A
Bldg. C
C-INT-1S-175
RC Channel Install on Underside of all Floor Joists – Level 1S
Trade Tools
N/A
Bldg. C
C-INT-2S-175
RC Channel Install on Underside of all Floor Joists – Level 2S
Trade Tools
N/A
Bldg. C
C-INT-3S-165
Insulation / Fire & Sound Rating First Pass – Level 3S
Trade Tools
N/A
Bldg. C
C-INT-4S-145
MEPF Hanger & Strap Install – Level 4S
Trade Tools
N/A
Bldg. C
C-INT-4S-155
Early Low Voltage Wire Pull – Level 4S
Trade Tools
N/A
Bldg. C
C-INT-4S-165
Insulation / Fire & Sound Rating First Pass – Level 4S
Trade Tools
N/A
Bldg. C
C-INT-5S-125
Priority Risers & In Floor Piping – Level 5S
Trade Tools
N/A
Bldg. C
C-INT-5S-135
Priority Electrical in Load Bearing Walls & Floors – Level 5S
Trade Tools
N/A
Bldg. C
C-INT-5S-935
Set FCUs – Level 5S
Trade Tools
N/A
Bldg. C
C-INT-5S-145
MEPF Hanger & Strap Install – Level 5S
Trade Tools
N/A
Bldg. C
C-INT-5S-155
Early Low Voltage Wire Pull – Level 5S
Trade Tools
N/A
Bldg. C
C-INT-N-115
HVAC Piping Risers / Valves / BSB – Level 1N
Trade Tools
N/A
Bldg. C
C-INT-2N-115
Pre MEPF Rating / Shaft Pass – Level 2N
Trade Tools
N/A
Bldg. C
C-INT-2N-925
HVAC Piping / FCU Hanger & Strap Install – Level 2N
Trade Tools
N/A
Bldg. C
C-INT-4N-915
Core HVAC Piping Penetrations – Level 4N
Trade Tools
N/A
Bldg. C
C-INT-4N-905
Core MEP Penetrations – Level 4N
Trade Tools
N/A
Bldg. C
C-INT-W-115
HVAC Piping Risers / Valves / BSB – Level 1W
Trade Tools
N/A
Bldg. C
C-INT-2W-115
Pre MEPF Rating / Shaft Pass – Level 2W
Trade Tools
N/A
Bldg. C
C-INT-2W-925
HVAC Piping / FCU Hanger & Strap Install– Level 2W
Trade Tools
N/A
Bldg. C
C-INT-4W-915
Core HVAC Piping Penetrations – Level 4W
Trade Tools
N/A
Bldg. C
C-INT-4W-905
Core MEP Penetrations – Level 4W
Trade Tools
N/A
Bldg. C
C-NW-L1R-130
MEPF Hanger & Strap Install – Level 1
Trade Tools
N/A
Bldg. D
D-DS-L3-115
Cure Decks for Delay Strips (28 Calendar Days)
Excavator, Boom Lift
N/A
Bldg. D
D-L12-1000
Priority Framing – Level 1-2
Trade Tools
N/A
Bldg. D
D-L23-1000
Priority Framing – Level 2-3
Trade Tools
N/A
Bldg. D
D-L34-170
Erect Structural Metal Stud Walls & Floor – Level 4 - Floors
Excavator, Boom Lift
N/A
Bldg. D
D-L45-170
Erect Structural Metal Stud Walls & Floor – Level 4 - Walls
Excavator, Boom Lift
N/A
Bldg. D
D-ML-120
Manlift in Operation
Trade Tools
N/A
Bldg. D
D-INT-1N-115
Pre MEPF Rating / Shaft Pass – Level 1N
Trade Tools
N/A
Bldg. D
D-INT-1N-925
HVAC Piping / FCU Hanger & Strap Install – Level 1N
Trade Tools
N/A
Bldg. D
D-L1R-100
Pre MEPF Rating / Shaft Pass – Level 1
Trade Tools
N/A
Bldg. D
D-CAFE-100
Cafe BuildoutTrade Tools
N/A
Site Work
LOT-145
Install Irrigation Sleeves
Trade Tools
N/A
Site Work
LOT-155
Grade for Curbs, Gutters & Swales
Trade Tools
N/A
Current and Upcoming Anticipated Closures
The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.
Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.
Description
Location
Duration & Date
Impacted Buildings/ Facilities
N/A
N/A
N/A
N/A
-
950586B North District Phase 2 - Construction Alert #30
Week of July 15, 2024
Construction Activities
Location
Activity
Equipment Used
Anticipated Disturbance
Site Work
UTIL-CS-115
Excavate Sewer
Excavator, Boom Lift
N/A
Site Work
UTIL-PEACH-115
Excavate Sewer
Excavator, Boom Lift
N/A
Site Work
UTIL-OFF-155
Backfill Sewer
Trade Tools
N/A
Site Work
UTIL-OFF-165
Excavate for Water POCs
Excavator, Boom Lift
N/A
Offsite Work
A2670
Off-Site Street Improvements
Trade Tools
N/A
Bldg. C
C-DS-L3-115
Cure Decks for Delay Strips (28 Calendar Days)
Excavator, Boom Lift
N/A
Bldg. C
C-NW-L12-100
Priority Framing – Level 1-2
Trade Tools
N/A
Bldg. C
C-NW-L23-100
Priority Framing – Level 2-3
Trade Tools
N/A
Bldg. C
C-NW-L45-110
Erect Structural Metal Stud Walls & Floor – Level 4 - Walls
Crane