Breadcrumb
NorthDistrict2

North District Phase 2 

The North District Phase 2 project is a joint initiative by UC Riverside and Riverside Community College aimed at addressing the increasing demand for on-campus housing for undergraduate and graduate students.

The project proposes to construct over 1,500 new apartment-style units, providing comfortable and modern living spaces for students. The project is being proposed in response to the growing need for affordable, safe, and convenient housing options for students. With the increasing number of students enrolled in UC Riverside and Riverside Community College, the demand for on-campus housing has exceeded the available options. As a result, many students are forced to seek off-campus housing, which may not always be affordable, safe, or convenient.

The proposed project seeks to address this issue by providing over 1,500 new beds in apartment-style units, which will be designed to meet the needs of undergraduate and graduate students. The units will be equipped with modern amenities and facilities, such as Wi-Fi, air conditioning, study areas, and communal spaces for socializing and relaxation.

The project is being proposed in partnership with Riverside Community College and is seeking funding through the State Higher Education Student Housing Grant Program. If the funding application is successful, the project will provide 652 beds for low-income UCR and RCCD students, ensuring that students from diverse backgrounds have access to safe and affordable housing options.

Overall, the North District Phase 2 project is an important initiative that will help to address the growing demand for on-campus housing for UC Riverside and Riverside Community College students. By providing modern and affordable housing options, the project will help integrate Riverside Community College students into UC Riverside campus and student community as well as help to create a more vibrant and inclusive campus community, while also ensuring that students have the resources they need to succeed academically.


Project Scope:

Program, design and construction of a new ~400,000 GSF buildings for undergraduate and graduate student housing.


North District Phase 2 Project Updates

  • 950586B North District Phase 2 - Construction Alert #42

    Week of October 7, 2024

    Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Bldg. C

    UTIL-CS-135

    Excavate Storm Drain

    Excavator

    N/A

    Bldg. D

    D-S-RF-200

    Install Roof Davits / Tie-Backs

    Trade Tools

    N/A

    Lot

    LOT-285

    Paving Cure Time

    Trade Tools

    N/A

    Lot

    LOT-445

    Shift Temp Construction Parking to West Side

    Trade Tools

    N/A

     

    Week of October 14, 2024

    Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Rec Fields

    SUM-275

    Recreation Fields

    Trade Tools

    N/A

    Rec Fields

    FIELDS-115

    Rough Grade Site

    Trade Tools

    N/A

    ROW

     

    ROW-ELEC-145

    Install Ductbanks

    Trade Tools

    N/A

    Central Park

    CENPARK-255

    Install Irrigation Sleeves

    Trade Tools

    N/A

     

    Week of October 21, 2024

    Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Bldg. C

    UTIL-CE-145 & 155

    Excavate & Install Fire Water

    Trade Tools

    N/A

    ROW

    ROW-ELEC-135

    Excavate for Conduit Pathway

    Trade Tools

    N/A

    Bldg. D

    D-ML-160

    Jump Manlift to Roof Level

    Trade Tools

    N/A

    Bldg. D

    UTIL-DE-125

    Install Storm Drain Structures

    Trade Tools

    N/A

    Bldg. D

    D-INT-7S-935 & 7N-935

    Set FCU's - Level 7S

    Trade Tools

    N/A

     

     Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.

    Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Upgrade Sewer

    Canyon Crest Street

    (University to Blaine)

    TBA

    Traffic Along Canyon Crest (University to Blaine)

    Offsite

    UTIL-PEACH-135

    Excavate & Install

    New Sewer Line

    TBA

     
  • 950586B North District Phase 2 - Construction Alert #41

    Week of September 30, 2024

    Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Parking Lot

    ROW-ELEC-125

    Install Vaults

    Trade Tools

    N/A

    Parking Lot

    C-SE-E1-1035

    Bike Rack / Mechanical Enclosure Buildout

    Trade Tools

    N/A

    Parking Lot

    LOT-315

    Install Catch Basins

    Trade Tools

    N/A

    Parking Lot

    LOT-195

    Install Hardscape

    Trade Tools

    N/A

    Week of October 7, 2024

    Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    ROW

    ROW-ELEC-135

    Excavate for Conduit Pathway

    Excavator

    N/A

    Bldg. C

    UTIL-CS-135

    Excavate Storm Drain

    Excavator

    N/A

    Bldg. D

    D-ML-160

    Jump Manlift to Roof Level

    Trade Tools

    N/A

    Bldg. D

    D-S-RF-200

    Install Roof Davits / Tie-Backs

    Trade Tools

    N/A

    Lot

    LOT-285

    Paving Cure Time

    Trade Tools

    N/A

    Lot

    LOT-445

    Shift Temp Construction Parking to West Side

    Trade Tools

    N/A

    Week of October 14, 2024

    Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Rec Fields

    SUM-275

    Recreation Fields

    Trade Tools

    N/A

    Rec Fields

    FIELDS-115

    Rough Grade Site

    Trade Tools

    N/A

    ROW

    ROW-ELEC-145

    Install Ductbanks

    Trade Tools

    N/A

    Central Park

    CENPARK-255

    Install Irrigation Sleeves

    Trade Tools

    N/A

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.

    Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Upgrade Sewer

    Canyon Crest Street

    (University to Blaine)

    TBA

    Traffic Along Canyon Crest (University to Blaine)

    Offsite

    UTIL-PEACH-135

    Excavate & Install

    New Sewer Line

    TBA

     
  • 950586B North District Phase 2 - Construction Alert #40

     Week of September 23, 2024

    Construction Activities 

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Bldg. D

    PR05-1485

    Fabricate / Deliver - Building D - Level 7 - Roofs

    Crane

    N/A

    Bldg. D

    PR05-1495

    Fabricate / Deliver - Building D - Upper Roof

    Crane

    N/A

    Bldg. C

    UTIL-CS-145

    Install Storm Drain

    Trade Tools

    N/A

    Cherry Street

    UTIL-CHERRY-255

    Excavate Sewer

    Trade Tools

    N/A

     

    Saturday Work

     

     

    Bldg. D

    D-L7R-380

    Erect Structural Metal Stud Walls & Floor - Level 7 - Roofs

    Crane

    N/A

    Bldg. D

    D-L7R-160

    Erect Structural Metal Stud Walls & Floor - Upper Roof

    Crane

    N/A

    Week of September 30, 2024

    Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Parking Lot

    ROW-ELEC-125

    Install Vaults

    Trade Tools

    N/A

    Parking Lot

    C-SE-E1-1035

    Bike Rack / Mechanical Enclosure Buildout

    Trade Tools

    N/A

    Parking Lot

    LOT-195

    Install Hardscape

    Trade Tools

    N/A

     

    Saturday Work

     

     

    Bldg. D

    D-L7R-160

    Erect Structural Metal Stud Walls & Floor - Upper Roof

    Crane

    N/A

    Week of October 7, 2024

    Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Bldg. C

    UTIL-CS-135

    Excavate Storm Drain

    Excavator

    N/A

    Bldg. D

    D-N-RF-200

    Install Roof Davits / Tie-Backs

    Trade Tools

    N/A

    Bldg. D

    D-S-EXT-W-135

    Install Brackets for Wood Slats & Shade Canopies

    Trade Tools

    N/A

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete.

    Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Upgrade Sewer

    Canyon Crest Street

    (University to Blaine)

    TBA

    Traffic Along Canyon Crest (University to Blaine)

    Offsite

    UTIL-PEACH-135

    Excavate & Install

    New Sewer Line

    TBA

     
  • 950586B North District Phase 2 - Construction Alert #39

    Week of September 9, 2024

    Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Peach Street

    UTIL-CS-115 & 125

    Excavate & Install Sewer

    Trade Tools

    N/A

    Cherry Street

    UTIL-CHERRY-135

    Install Sewer

    Trade Tools

    N/A

    Bldg. C

    C-SE-LNG-245

    Erect Tube Steel - L5-RF

    Crane

    N/A

    Bldg. C

    C-SE-LNG-255

    Erect CFS Walls - L5

    Crane

    N/A

    Bldg. C

    C-SE-LNG-265

    Erect CFS Roof - RF

    Crane

    N/A

    Bldg. C

    C-SE-EXT-EN-145

    Install Rigid Insulation

    Trade Tools

    N/A

    Parking Lot

    LOT-175

    Install Swales & Dissipators

    Trade Tools

    N/A

    Bldg. D

    D-L56-180

    Erect Structural Metal Stud Walls & Floor - Level 6 - Floors

    Crane

    N/A

     

    Saturday Work

     

     

    Bldg. D

    D-L67-170

    Erect Structural Metal Stud Walls & Floor - Level - 6 Walls

    Crane

    N/A

    Week of September 16, 2024

    Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Bldg. C

    UTIL-CS-135

    Excavate Storm Drain

    Excavator

    N/A

    Cherry Street

    UTIL-CHERRY-145

    Excavate Storm Drain Structures

    Excavator

    N/A

    Bldg. C

    C-NW-L7R-100

    Erect Structural Metal Stud Walls & Floor - Upper Roof

    Crane

    N/A

    Parking Lot

    LOT-185

    Final Grade for Paving & Hardscape

    Trade Tools

    N/A

     

    Saturday Work

     

     

    Bldg. D

    D-L7R-370

    Erect Structural Metal Stud Walls & Floor - Level 7 - Walls

    Crane

    N/A

    Bldg. D

    D-L67-160

    Erect Structural Metal Stud Walls & Floor - Level 7 - Floors

    Crane

    N/A

    Week of September 23, 2024

    Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Bldg. C

    UTIL-CS-145

    Install Storm Drain

    Trade Tools

    N/A

    Cherry Street

    UTIL-CHERRY-255

    Excavate Sewer

    Trade Tools

    N/A

    Cherry Street

    UTIL-CHERRY-225

    Install Sewer Manholes

    Trade Tools

    N/A

     

    Saturday Work

     

     

    Bldg. D

    D-L7R-380

    Erect Structural Metal Stud Walls & Floor - Level 7 - Roofs

    Crane

    N/A

    Bldg. D

    D-L7R-160

    Erect Structural Metal Stud Walls & Floor - Upper Roof

    Crane

    N/A

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. 

    Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Upgrade Sewer

    Canyon Crest Street

    (University to Blaine)

    TBA

    Traffic Along Canyon Crest (University to Blaine)

    Offsite

    UTIL-PEACH-135

    Excavate & Install

    New Sewer Line

    TBA

     
  • 950586B North District Phase 2 - Construction Alert #38

    Dear UCR Partners, 

    Please be advised that the following activities will be occurring during the weeks/ dates noted below at the North District 2 (ND2) project site and surrounding areas during regular construction work hours (7am to 5pm) unless otherwise indicated below.  The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below.

    The North District 2 Team recognizes that construction activities will result in inconveniences and disruption to the surrounding neighborhood. We thank you for your continued patience during the construction of this much needed project

    Week of September 9, 2024

    Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Peach Street

    UTIL-CS-115 & 125

    Excavate & Install Sewer

    Excavator

    N/A

    Cherry Street

    UTIL-CHERRY-135

    Install Sewer

    Lifter

    N/A

    Bldg. C

    C-SE-LNG-245

    Erect Tube Steel - L5-RF

    Trade Tools

    N/A

    Bldg. C

    C-SE-LNG-255

    Erect CFS Walls - L5

    Trade Tools

    N/A

    Bldg. C

    C-SE-LNG-265

    Erect CFS Roof - RF

    Crane

    N/A

    Parking Lot

    LOT-175

    Install Swales & Dissipators

    Lifter

    N/A

     

    Saturday Work

     

     

    Bldg. D

    Erect Structural Metal Stud Walls & Floor - Level 6 - Walls

    Crane

    N/A

     

    Week of September 16, 2024

    Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Bldg. C

    UTIL-CS-135

    Excavate Storm Drain

    Excavator

    N/A

    Cherry Street

    UTIL-CHERRY-145

    Excavate Storm Drain Structures

    Excavator

    N/A

    Bldg. C

    C-NW-L7R-100

    Erect Structural Metal Stud Walls & Floor - Upper Roof

    Lifter

    N/A

    Bldg. D

    D-L56-180

    Erect Structural Metal Stud Walls & Floor - Level 6 - Floors

    Excavator

    N/A

    Bldg. D

    D-L67-160

    Erect Structural Metal Stud Walls & Floor - Level 7 - Floors

    Excavator

    N/A

    Bldg. D

    D-L7R-370

    Erect Structural Metal Stud Walls & Floor - Level 7 - Walls

    Excavator

    N/A

    Saturday Work

     

     

    Bldg. D

    Erect Structural Metal Stud Walls & Floor - Level 7 Walls

    Crane

    N/A

     

     

    Week of September 23, 2024

    Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Cherry Street

    UTIL-CHERRY-255

    Excavate Sewer

    Excavator

    N/A

    Cherry Street

    UTIL-CHERRY-225

    Install Sewer Manholes

    Trade Tools

    N/A

    Saturday Work

     

     

    Bldg. D

    Erect Structural Metal Stud Walls & Floor - Level 7 - Roof

    Crane

    N/A

      

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. 

    Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Upgrade Sewer

    Canyon Crest Street

    (University to Blaine)

    TBA

    Traffic Along Canyon Crest (University to Blaine)

    Offsite

    UTIL-PEACH-135

    Excavate & Install

    New Sewer Line

    TBA

     

  • 950586B North District Phase 2 - Construction Alert #37

    Week of September 2, 2024

    Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Peach Street

    UTIL-CE-125

    Install Storm Drain Structures

    Excavator; Trade Tools

    N/A

    Bldg. C

    C-NW-EXT-WS-115

    Scaffold Setup

    Trade Tools

    N/A

    Cherry Street

    UTIL-CHERRY-135

    Install Sewer

    Excavator; Trade Tools

    N/A

    Bldg. D

    Erect Structural Metal Stud Walls & Floor - Level 5 - Walls

    Crane

    N/A

     

    Saturday Work

     

    Bldg. D

    Erect Structural Metal Stud Walls & Floor - Level 5 – Roof

    Crane

    N/A

     

    Week of September 9, 2024

    Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Peach Street

    UTIL-CE-125

    Install Storm Drain Structures

    Excavator; Trade Tools

    N/A

    Bldg. C

    C-SE-LNG-255

    Erect CFS Walls - L5

    Crane

    N/A

    Peach Street

    UTIL-PEACH-135

    Install Grease Interceptor

    Trade Tools

    N/A

    Cherry Street

    UTIL-CHERRY-135

    Install Sewer

    Excavator; Trade Tools

    N/A

    Bldg. C

    C-SE-LNG-265

    Erect CFS Roof - RF

    Crane

    N/A

    Bldg. D

    Erect Structural Metal Stud Walls & Floor - Level 6 – Floors, Walls

    Crane

    N/A

     

    Saturday Work

     

     

    Bldg. D

    Erect Structural Metal Stud Walls & Floor - Level 6 - Walls

    Crane

    N/A

     

     

     

     

    Week of September 16, 2024

    Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Cherry Street

    UTIL-CHERRY-145

    Excavate Storm Drain Structures

    Excavator; Trade Tools

    N/A

    Cherry Street

    UTIL-CHERRY-155

    Install Storm Drain Structures

    Excavator; Boom lifter

    N/A

    Bldg. D

    Erect Structural Metal Stud Walls & Floor - Level 6 - Walls

    Crane

    N/A

    Bldg. D

    Erect Structural Metal Stud Walls & Floor - Level 7 – Floors, Walls

    Crane

    N/A

     

    Saturday Work

     

     

    Bldg. D

    Erect Structural Metal Stud Walls & Floor - Level 7 - Walls

    Crane

    N/A

     

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. 

    Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Upgrade Sewer

    Canyon Crest Street

    (University to Blaine)

    TBA

    Traffic Along Canyon Crest (University to Blaine)

    Offsite

    UTIL-PEACH-135

    Excavate & Install

    New Sewer Line

    TBA

     
  • 950586B North District Phase 2 - Construction Alert #36

    Week of August 26, 2024

    Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Bldg. C – South

    UTIL-CS-115

    Excavate & Install Sewer

    Excavator

    N/A

    Bldg. C & Cherry

    UTIL-CS-135

    Excavate, Install SD & Sewer Manhole

    Excavator

    N/A

    Parking Lot

    LOT-155, 165

    Grade and install Curbs, Gutters & Swales

    Grader

    N/A

     

    Saturday Work

     

     

    Bldg. D

    Erect Structural Metal Stud Walls & Floor - Level 3 - Walls (Remaining Panels)

    Crane

    N/A

     

     

    Week of September 2, 2024

    Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Peach Street

    UTIL-CE-125

    Install Storm Drain Structures

    Trade Tools

    N/A

    Cherry Street

    UTIL-CHERRY-135

    Install Sewer

    Trade Tools

    N/A

    Bldg. C

    C-NW-EXT-WS-115

    Scaffold Setup

    Trade Tools

    N/A

     

    Saturday Work

     

    N/A

    Bldg. D

    Erect Structural Metal Stud Walls & Floor - Level 3 - Walls (Remaining Panels)

    Crane

    N/A

     

     

    Week of September 9, 2024

    Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Bldg. C

    C-SE-LNG-255

    Erect CFS Walls - L5

    Trade Tools

    N/A

    Bldg. C

    C-SE-RF-140

    Install Tapered Insulation & Roofing Membrane

    Trade Tools

    N/A

    Cherry Street

    UTIL-CHERRY-135

    Install Sewer

    Trade Tools

    N/A

     

    Saturday Work

     

     

    Bldg. D

    Erect Structural Metal Stud Walls & Floor - Level 3 - Walls (Remaining Panels)

    Crane

    N/A

     

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. 

    Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Upgrade Sewer

    Canyon Crest Street

    (University to Blaine)

    TBA

    Traffic Along Canyon Crest (University to Blaine)

    Offsite

    UTIL-PEACH-135

    Excavate & Install

    New Sewer Line

    TBA

     
  • 950586B North District Phase 2 - Construction Alert #35

    Week of August 19, 2024

    Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Parking Lot

    LOT-135

    Install Site Lighting Pole Bases

    Gradall

    N/A

    Parking Lot

    LOT-165

    Install Curbs, Gutters & Flow Lines

    Trade Tools/Concrete Truck

    N/A

    Peach Street

    UTIL-PEACH-225

    Excavate Site Electrical

    Excavator

    N/A

    Peach Street

    UTIL-PEACH-325

    Excavate & Install Remaining Storm Drain

    Excavator

    N/A

    Peach Street

    UTIL-PEACH-355

    Excavate Fire Water

    Excavator

    N/A

    Peach Street

    UTIL-PEACH-125

    5 Install Sewer Manholes

    Excavator

    N/A

     

      

    Week of August 26, 2024

    Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Bldg. C - South

    UTIL-CS-115

    Excavate & Install Sewer

    Excavator

    N/A

    Bldg. C - South

    UTIL-CS-135

    Excavate & Install Storm Drain

    Excavator

    N/A

    Cherry Street

    UTIL-CHERRY-115

    Excavate & Install Sewer

    Excavator

    N/A

    Peach Street

    ROW-ELEC-115

    Excavate for Vaults 5

    Trade Tools

    N/A

    Peach Street

    ROW-ELEC-125

    Install Vaults 5

    Trade Tools

    N/A

     

     

    Week of September 2, 2024

    Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Peach Street

    UTIL-CE-125

    Install Storm Drain Structures

    Trade Tools

    N/A

    Peach Street

    UTIL-PEACH-135

    Install Grease Interceptor

    Trade Tools

    N/A

    Cherry Street

    UTIL-CHERRY-135

    Install Sewer

    Trade Tools

    N/A

     

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. 

    Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Upgrade Sewer

    Canyon Crest Street

    (University to Blaine)

    TBA

    Traffic Along Canyon Crest (University to Blaine)

    Offsite

    UTIL-PEACH-135

    Excavate & Install

    New Sewer Line

    TBA

     
  • 950586B North District Phase 2 - Construction Alert #34

    Week of August 12, 2024

    Critical Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Bldg. C

    C-NW-L7R-310 Erect Structural Metal Stud Walls & Floor - Level 7 - Roofs

    Crane

    N/A

    Bldg. C

    C-NW-L7R-100 Erect Structural Metal Stud Walls & Floor - Upper Roof

    Crane

    N/A

    Peach Street

    UTIL-PEACH-155 Excavate Remaining Storm Drain 3

    Excavator;

    Trade Tools

    N/A

    Peach Street

    UTIL-PEACH-355 Excavate Fire Water 3

    Excavator;

    Trade Tools

    N/A

    Peach Street

    ROW-ELEC-115 Excavate for Vaults 5

    Excavator;

    Trade Tools

    N/A

    Bldg. C

    C-NW-L7R-310 Erect Structural Metal Stud Walls & Floor - Level 7 - Roofs 2

    Crane

    N/A

    Bldg. C

    C-NW-L7R-100 Erect Structural Metal Stud Walls & Floor - Upper Roof 1

    Crane

    N/A

    Bldg. D

    D-L34-170 Erect Structural Metal Stud Walls & Floor - Level 4 - Floors 4

    Crane

    N/A

    Bldg. D

    D-L45-170 Erect Structural Metal Stud Walls & Floor - Level 4 - Walls 4

    Crane

    N/A

     

      

     Week of August 19, 2024

    Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Peach Street

    UTIL-PEACH-225 Excavate Site Electrical 10

    Excavator

    N/A

    Peach Street

    UTIL-PEACH-355 Excavate Fire Water 3

    Excavator

    N/A

    Peach Street

    UTIL-OFF-135 Excavate for New Sewer Line 15

    Excavator

    N/A

    Peach Street

    ROW-ELEC-115 Excavate for Vaults 5

    Excavator

    N/A

    Bldg. C

    C-SE-LNG-205 Erect CFS Floors & Bottom Track - L4 5

    Crane

    N/A

    Bldg. C

    C-SE-LNG-225 Erect CFS Walls - L4 2

    Crane

    N/A

    Bldg. C

    C-SE-LNG-235 Erect CFS Floors & Bottom Track - L5 5

    Crane

    N/A

    Bldg. C

    C-NW-RF-120 Frame & Sheath Equipment Pads 5

    Crane

    N/A

    Bldg. D

    D-L45-170 Erect Structural Metal Stud Walls & Floor - Level 4 - Walls 4

    Crane

    N/A

    Bldg. D

    D-L45-160 Erect Structural Metal Stud Walls & Floor - Level 5 - Floors 4

    Crane

    N/A

     

     

    Week of August 26, 2024

    Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Peach Street

    UTIL-PEACH-225 Excavate Site Electrical 10

    Excavator

    N/A

    Peach Street

    UTIL-CS-115 Excavate Sewer 3

    Excavator

    N/A

    Peach Street

    UTIL-CHERRY-115 Excavate Sewer 3

    Excavator

    N/A

    Peach Street

    ROW-ELEC-135 Excavate for Conduit Pathway 5

    Excavator

    N/A

    Bldg. C

    C-SE-LNG-235 Erect CFS Floors & Bottom Track - L5 5

    Crane

    N/A

    Bldg. D

    D-L45-160 Erect Structural Metal Stud Walls & Floor - Level 5 - Floors 4

    Crane

    N/A

    Bldg. D

    D-L56-170 Erect Structural Metal Stud Walls & Floor - Level 5 - Walls 4

    Crane

    N/A

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. 

    Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    Upgrade Sewer

    Canyon Crest Street

    (University to Blaine)

    TBA

    Traffic Along Canyon Crest (University to Blaine)

  • 950586B North District Phase 2 - Construction Alert #33

    Week of August 5, 2024

    Critical Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Bldg. C East

    UTIL-CE-115

    Excavate Storm Drain

    Excavator; Trade Tools

    N/A

    Offsite Work

    UTIL-OFF-175

    Install Point of Connection

    Excavator, Boom Lift

    N/A

     

     

    Week of August 12, 2024

    Critical Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Bldg. C East

    UTIL-CE-115

    Excavate Storm Drain

    Excavator; Trade Tools

    N/A

    Offsite Work

    UTIL-OFF-185

    Install Piping to Project Site

    Excavator, Boom Lift

    N/A

    Bldg. C

    C-NW-L7R-300

    Erect Structural Metal Stud Walls & Floor – Level 7 – Walls

    Crane

    N/A

    Bldg. D

    D-L56-170

    Erect Structural Metal Stud Walls & Floor – Level 5 - Walls

    Crane

    N/A

    Bldg. D

    D-L56-160

    Erect Structural Metal Stud Walls & Floor – Level 5 - Roof

    Crane

    N/A

     

     

    Week of August 19, 2024

    Critical Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Site Work (Peach St.)

    UTIL-PEACH-205

    Excavate Domestic Water

    Excavator

    N/A

    Bldg. D East

    UTIL-DE-115

    Excavate Storm Drain

    Excavator

    N/A

    Bldg. C

    C-NW-L7R-100

    Erect Structural Metal Stud Walls & Floor – Upper Roof

    Crane

    N/A

    Bldg. D

    D-L56-160

    Erect Structural Metal Stud Walls & Floor – Level 5 - Roof

    Crane

    N/A

    Bldg. D

    D-L56-180

    Erect Structural Metal Stud Walls & Floor – Level 6 - Floors

    Crane

    N/A

    Bldg. D

    D-L67-170

    Erect Structural Metal Stud Walls & Floor – Level 6 - Walls

    Crane

    N/A

     

      

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. 

    Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    N/A

    N/A

    N/A

    N/A

  • 950586B North District Phase 2 - Construction Alert #32

    Week of July 29, 2024

    Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Site Work

    UTIL-CS-135

    Excavate Storm Drain

    Trade Tools

    N/A

    Site Work

    UTIL-PEACH-145

    Install Sewer

    Trade Tools

    N/A

    Site Work

    UTIL-PEACH-155

    Excavate Storm Drain

    Trade Tools

    N/A

    Site Work

    UTIL-OFF-165

    Excavate for Water POCs

    Excavator, Boom Lift

    N/A

    Site Work

    UTIL-OFF-175

    Install Point of Connection

    Excavator, Boom Lift

    N/A

    Offsite Work

    A2670

    Off-Site Street Improvements

    Trade Tools

    N/A

    Bldg. C

    C-DS-L3-125

    F/R/P Delay Strips

    N/A

    N/A

    Bldg. C

    C-NW-L23-100

    Priority Framing – Level 2-3

    Trade Tools

    N/A

    Bldg. C

    C-NW-L67-110

    Erect Structural Metal Stud Walls & Floors – Level 6 - Walls

    Trade Tools

    N/A

    Bldg. C

    C-NW-L67-100

    Erect Structural Metal Stud Walls & Floors – Level 7 - Floors

    Trade Tools

    N/A

    Bldg. C

    C-ML-180

    Manlift in Operation

    N/A

    N/A

    Bldg. C

    C-ML-120

    Manlift in Operation

    N/A

    N/A

    Bldg. C

    C-SE-EXT-EN-135

    Install Z-Furring Channel for Rigid Insulation

    Trade Tools

    N/A

    Bldg. C

    C-SE-EXT-EN-145

    Install Rigid Insulation

    Trade Tools

    N/A

    Bldg. C

    C-SE-EXT-CN-135

    Install Z-Furring Channel for Rigid Insulation

    Trade Tools

    N/A

    Bldg. C

    C-SE-EXT-CN-145

    Install Rigid Insulation

    Trade Tools

    N/A

    Bldg. C

    C-SE-EXT-SW-125

    Install Clips for Wood Slats & Shade Canopies

    Trade Tools

    N/A

    Bldg. C

    C-SE-EXT-SW-255

    Layout / Weld Clips for Curtain Wall System

    Trade Tools

    N/A

    Bldg. C

    C-SE-EXT-CS-125

    Install Clips for Wood Slats & Shade Canopies

    Trade Tools

    N/A

    Bldg. C

    C-SE-EXT-CS-255

    Layout / Weld Clips for Curtain Wall System

    Trade Tools

    N/A

    Bldg. C

    C-INT-E-135

    HVAC Piping Risers / Valves / BSB – Level 3E

    Trade Tools

    N/A

    Bldg. C

    C-INT-1E-175

    RC Channel Install on Underside of all Floor Joists – Level 1E

     

    Trade Tools

    N/A

    Bldg. C

    C-INT-2E-175

    RC Channel Install on Underside of all Floor Joists – Level 2E

    Trade Tools

    N/A

    Bldg. C

    C-INT-3E-165

    Insulation / Fire & Sound Rating First Pass – Level 3E

    Trade Tools

    N/A

     

    Bldg. C

    C-INT-4E-145

    MEPF Hanger & Strap Install – Level 4E

    Trade Tools

    N/A

    Bldg. C

    C-INT-4E-155

    Early Low Voltage Wire Pull – Level 4E

    Trade Tools

    N/A

    Bldg. C

    C-INT-4E-165

    Insulation / Fire & Sound Rating First Pass – Level 4E

    Trade Tools

    N/A

    Bldg. C

    C-INT-5E-125

    Priority Risers & In Floor Piping – Level 5E

    Trade Tools

    N/A

    Bldg. C

    C-INT-5E-135

    Priority Electrical in Load Bearing Walls & Floors – Level 5E

    Trade Tools

    N/A

    Bldg. C

    C-INT-5E-935

    Set FCUs – Level 5E

    Trade Tools

    N/A

    Bldg. C

    C-INT-5E-145

    MEPF Hanger & Strap Install – Level 5E

    Trade Tools

    N/A

    Bldg. C

    C-INT-5E-155

    Early Low Voltage Wire Pull – Level 5E

    Trade Tools

    N/A

    Bldg. C

    C-INT-S-135

    HVAC Piping Risers / Valves / BSB / - Level 3S

    Trade Tools

    N/A

    Bldg. C

    C-INT-1S-175

    RC Channel Install on Underside of all Floor Joists – Level 1S

    Trade Tools

    N/A

    Bldg. C

    C-INT-2S-175

    RC Channel Install on Underside of all Floor Joists – Level 2S

    Trade Tools

    N/A

    Bldg. C

    C-INT-3S-165

    Insulation / Fire & Sound Rating First Pass – Level 3S

    Trade Tools

    N/A

    Bldg. C

    C-INT-4S-145

    MEPF Hanger & Strap Install – Level 4S

    Trade Tools

    N/A

    Bldg. C

    C-INT-4S-155

    Early Low Voltage Wire Pull – Level 4S

    Trade Tools

    N/A

    Bldg. C

    C-INT-4S-165

    Insulation / Fire & Sound Rating First Pass – Level 4S

    Trade Tools

    N/A

    Bldg. C

    C-INT-5S-125

    Priority Risers & In Floor Piping – Level 5S

    Trade Tools

    N/A

    Bldg. C

    C-INT-5S-135

    Priority Electrical in Load Bearing Walls & Floors – Level 5S

    Trade Tools

    N/A

    Bldg. C

    C-INT-5S-935

    Set FCUs – Level 5S

    Trade Tools

    N/A

    Bldg. C

    C-INT-5S-145

    MEPF Hanger & Strap Install – Level 5S

    Trade Tools

    N/A

    Bldg. C

    C-INT-5S-155

    Early Low Voltage Wire Pull – Level 5S

    Trade Tools

    N/A

    Bldg. C

    C-INT-N-115

    HVAC Piping Risers / Valves / BSB – Level 1N

    Trade Tools

    N/A

    Bldg. C

    C-INT-2N-115

    Pre MEPF Rating / Shaft Pass – Level 2N

    Trade Tools

    N/A

    Bldg. C

    C-INT-2N-925

    HVAC Piping / FCU Hanger & Strap Install – Level 2N

    Trade Tools

    N/A

    Bldg. C

    C-INT-4N-915

    Core HVAC Piping Penetrations – Level 4N

    Trade Tools

    N/A

    Bldg. C

    C-INT-4N-905

    Core MEP Penetrations – Level 4N

    Trade Tools

    N/A

    Bldg. C

    C-INT-W-115

    HVAC Piping Risers / Valves / BSB – Level 1W

    Trade Tools

    N/A

    Bldg. C

    C-INT-2W-115

    Pre MEPF Rating / Shaft Pass – Level 2W

    Trade Tools

    N/A

    Bldg. C

    C-INT-2W-925

    HVAC Piping / FCU Hanger & Strap Install– Level 2W

    Trade Tools

    N/A

    Bldg. C

    C-INT-4W-915

    Core HVAC Piping Penetrations – Level 4W

    Trade Tools

    N/A

    Bldg. C

    C-INT-4W-905

    Core MEP Penetrations – Level 4W

    Trade Tools

    N/A

    Bldg. C

    C-NW-L1R-130

    MEPF Hanger & Strap Install – Level 1

    Trade Tools

    N/A

    Bldg. D

    D-DS-L3-115

    Cure Decks for Delay Strips (28 Calendar Days)

    Excavator, Boom Lift

    N/A

    Bldg. D

    D-L12-1000

    Priority Framing – Level 1-2

    Trade Tools

    N/A

    Bldg. D

    D-L23-1000

    Priority Framing – Level 2-3

    Trade Tools

    N/A

    Bldg. D

    D-L34-170

    Erect Structural Metal Stud Walls & Floor – Level 4 - Floors

    Excavator, Boom Lift

    N/A

    Bldg. D

    D-L45-170

    Erect Structural Metal Stud Walls & Floor – Level 4 - Walls

    Excavator, Boom Lift

    N/A

    Bldg. D

    D-ML-120

    Manlift in Operation

    Trade Tools

    N/A

    Bldg. D

    D-INT-1N-115

    Pre MEPF Rating / Shaft Pass – Level 1N

    Trade Tools

    N/A

    Bldg. D

    D-INT-1N-925

    HVAC Piping / FCU Hanger & Strap Install – Level 1N

    Trade Tools

    N/A

    Bldg. D

    D-L1R-100

    Pre MEPF Rating / Shaft Pass – Level 1

    Trade Tools

    N/A

    Bldg. D

    D-CAFE-100
    Cafe Buildout

    Trade Tools

    N/A

    Site Work

    LOT-145

    Install Irrigation Sleeves

    Trade Tools

    N/A

    Site Work

    LOT-155

    Grade for Curbs, Gutters & Swales

    Trade Tools

    N/A

     

     

     

    Week of August 5, 2024

    Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Bldg. C South

    UTIL-CS-145

    Install Storm Drain

    Trade Tools

    N/A

    Bldg. C East

    UTIL-CE-115

    Excavate Storm Drain

    Excavator; Trade Tools

    N/A

    Site Work (Peach St.)

    UTIL-PEACH-165

    Install Storm Drain Structures

    Trade Tools

    N/A

    Site Work (Peach St.)

    UTIL-PEACH-175

    Install Storm Drain

    Trade Tools

    N/A

    Site Work (Peach St.)

    UTIL-PEACH-185

    Excavate Fire Water

    Trade Tools

    N/A

    Offsite Work

    UTIL-OFF-175

    Install Point of Connection

    Excavator, Boom Lift

    N/A

    Offsite Work

    A2670

    Off-Site Street Improvements

    Trade Tools

    N/A

    Bldg. C

    C-NW-L7R-300

    Erect Structural Metal Stud Walls & Floor – Level 7 – Walls

    Trade Tools

    N/A

    Bldg. C

    C-SE-EXT-EN-135

    Install Z-Furring Channel for Rigid Insulation

    Trade Tools

    N/A

    Bldg. C

    C-SE-EXT-EN-145

    Install Rigid Insulation

    Trade Tools

    N/A

    Bldg. C

    C-SE-EXT-CN-135

    Install Z-Furring Channel for Rigid Insulation

    Trade Tools

    N/A

    Bldg. C

    C-SE-EXT-CN-145

    Install Rigid Insulation

    Trade Tools

    N/A

    Bldg. C

    C-SE-EXT-SW-125

    Install Clips for Wood Slats & Shade Canopies

    Trade Tools

    N/A

    Bldg. C

    C-SE-EXT-CS-125

    Install Clips for Wood Slats & Shade Canopies

    Trade Tools

    N/A

    Bldg. C

    C-INT-E-135

    HVAC Piping Risers / Valves / BSB – Level 3E

    Trade Tools

    N/A

    Bldg. C

    C-INT-E-145

    HVAC Piping Risers / Valves / BSB – Level 4E

    Trade Tools

    N/A

    Bldg. C

    C-INT-2E-175

    RC Channel Install on Underside of all Floor Joists – Level 2E

    Trade Tools

    N/A

    Bldg. C

    C-INT-3E-175

    RC Channel Install on Underside of all Floor Joists – Level 3E

    Trade Tools

    N/A

     

    Bldg. C

    C-INT-4E-165

    Insulation / Fire & Sound Rating First Pass – Level 4E

    Trade Tools

    N/A

    Bldg. C

    C-INT-5E-145

    MEPF Hanger & Strap Install – Level 5E

    Trade Tools

    N/A

    Bldg. C

    C-INT-5E-155

    Early Low Voltage Wire Pull – Level 5E

    Trade Tools

    N/A

    Bldg. C

    C-INT-5E-165

    Insulation / Fire & Sound Rating First Pass – Level 5E

    Trade Tools

    N/A

    Bldg. C

    C-INT-S-135

    HVAC Piping Risers / Valves / BSB / - Level 3S

    Trade Tools

    N/A

    Bldg. C

    C-INT-S-145

    HVAC Piping Risers / Valves / BSB / - Level 4S

    Trade Tools

    N/A

    Bldg. C

    C-INT-2S-175

    RC Channel Install on Underside of all Floor Joists – Level 2S

    Trade Tools

    N/A

    Bldg. C

    C-INT-3S-175

    RC Channel Install on Underside of all Floor Joists – Level 3S

    Trade Tools

    N/A

    Bldg. C

    C-INT-4S-165

    Insulation / Fire & Sound Rating First Pass – Level 4S

    Trade Tools

    N/A

    Bldg. C

    C-INT-5S-145

    MEPF Hanger & Strap Install – Level 5S

    Trade Tools

    N/A

    Bldg. C

    C-INT-5S-155

    Early Low Voltage Wire Pull – Level 5S

    Trade Tools

    N/A

    Bldg. C

    C-INT-5S-165

    Insulation / Fire & Sound Rating First Pass – Level 5S

    Trade Tools

    N/A

    Bldg. C

    C-INT-N-125

    HVAC Piping Risers / Valves / BSB – Level 2N

    Trade Tools

    N/A

    Bldg. C

    C-INT-2N-115

    Pre MEPF Rating / Shaft Pass – Level 2N

    Trade Tools

    N/A

    Bldg. C

    C-INT-2N-925

    HVAC Piping / FCU Hanger & Strap Install – Level 2N

    Trade Tools

    N/A

    Bldg. C

    C-INT-2N-125

    Priority Risers & In Floor Piping – Level 2N

    Trade Tools

    N/A

    Bldg. C

    C-INT-2N-135

    Priority Electrical in Load Bearing Walls & Floors – Level 2N

    Trade Tools

    N/A

    Bldg. C

    C-INT-2N-935

    Set FCU’s – Level 2N

    Trade Tools

    N/A

    Bldg. C

    C-INT-2N-145

    MEPF Hanger & Strap Install – Level 2N

    Trade Tools

    N/A

    Bldg. C

    C-INT-2N-155

    Early Low Voltage Wire Pull – Level 2N

    Trade Tools

    N/A

    Bldg. C

    C-INT-3N-925

    HVAC Piping / FCU Hanger & Strap Install – Level 3N

    Trade Tools

    N/A

    Bldg. C

    C-INT-5N-915

    Core HVAC Piping Penetrations – Level 5N

    Trade Tools

    N/A

    Bldg. C

    C-INT-5N-905

    Core MEP Penetrations – Level 5N

    Trade Tools

    N/A

    Bldg. C

    C-INT-W-125

    HVAC Piping Risers / Valves / BSB – Level 2W

    Trade Tools

    N/A

    Bldg. C

    C-INT-2W-115

    Pre MEPF Rating / Shaft Pass – Level 2W

    Trade Tools

    N/A

    Bldg. C

    C-INT-2W-925

    HVAC Piping / FCU Hanger & Strap Install– Level 2W

    Trade Tools

    N/A

    Bldg. C

    C-INT-2W-925

    HVAC Piping / FCU Hanger & Strap Install– Level 2W

    Trade Tools

    N/A

    Bldg. C

    C-INT-2W-125

    Priority Risers & In Floor Piping – Level 2W

    Trade Tools

    N/A

    Bldg. C

    C-INT-2W-135

    Priority Electrical in Load Bearing Walls & Floors – Level 2W

    Trade Tools

    N/A

    Bldg. C

    C-INT-2W-935

    Set FCU’s – Level 2W

    Trade Tools

    N/A

    Bldg. C

    C-INT-2W-145

    MEPF Hanger & Strap Install – Level 2W

    Trade Tools

    N/A

    Bldg. C

    C-INT-2W-155

    Early Low Voltage Wire Pull – Level 2W

    Trade Tools

    N/A

    Bldg. C

    C-INT-3W-925

    HVAC Piping / FCU Hanger & Strap Install – Level 3W

    Trade Tools

    N/A

    Bldg. C

    C-INT-5W-915

    Core HVAC Piping Penetrations – Level 5W

    Trade Tools

    N/A

    Bldg. C

    C-INT-5W-905

    Core MEP Penetrations – Level 5W

    Trade Tools

    N/A

    Bldg. C

    C-NW-L1R-290

    Insulation / Fire & Sound Rating First Pass – Level 1

    Trade Tools

    N/A

    Bldg. D

    D-DS-L3-115

    Cure Decks for Delay Strips (28 Calendar Days)

    Trade Tools

    N/A

    Bldg. D

    D-DS-L3-125

    F/R/P Delay Strips

    N/A

    N/A

    Bldg. D

    D-L23-1000

    Priority Framing – Level 2-3

    Trade Tools

    N/A

    Bldg. D

    D-L45-170

    Erect Structural Metal Stud Walls & Floor – Level 4 - Walls

    Trade Tools

    N/A

    Bldg. D

    D-L45-160

    Erect Structural Metal Stud Walls & Floor – Level 5 - Floors

    Trade Tools

    N/A

    Bldg. D

    D-ML-120

    Manlift in Operation

    Trade Tools

    N/A

    Bldg. D

    D-INT-S-115

    HVAC Piping Risers / Valves / BSB – Level 1S

    Trade Tools

    N/A

    Bldg. D

    D-INT-N-115

    HVAC Piping Risers / Valves / BSB – Level 1N

    Trade Tools

    N/A

    Bldg. D

    D-INT-1N-115

    Pre MEPF Rating / Shaft Pass – Level 1N

    Trade Tools

    N/A

    Bldg. D

    D-INT-1N-925

    HVAC Piping / FCU Hanger & Strap Install – Level 1N

    Trade Tools

    N/A

    Bldg. D

    D-INT-1N-125

    Priority Risers & In Floor Piping – Level 1N

    Trade Tools

    N/A

    Bldg. D

    D-INT-1N-135

    Priority Electrical in Load Bearing Walls & Floors – Level 1N

    Trade Tools

    N/A

    Bldg. D

    D-INT-1N-935

    Set FCU’s – Level 1N

    Trade Tools

    N/A

    Bldg. D

    D-L1R-100

    Pre MEPF Rating / Shaft Pass – Level 1

    Trade Tools

    N/A

    Bldg. D

    D-L1R-110

    Priority Risers & In Floor Piping – Level 1

    Trade Tools

    N/A

    Bldg. D

    D-L1R-120

    Priority Electrical in Load Bearing Walls & Floors – Level 1

    Trade Tools

    N/A

    Bldg. D

    D-CAFE-100
    Cafe Buildout

    Trade Tools

    N/A

    Site Work

    LOT-155

    Grade for Curbs, Gutters & Swales

    Trade Tools

    N/A

    Site Work

    LOT-165

    Install Curbs, Gutters & flow Lines

    Trade Tools

    N/A

     

     

    Week of August 12, 2024

    Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Bldg. C South

    UTIL-CS-145

    Install Storm Drain

    Trade Tools

    N/A

    Bldg. C East

    UTIL-CE-115

    Excavate Storm Drain

    Excavator; Trade Tools

    N/A

    Site Work (Peach St.)

    UTIL-PEACH-175

    Install Storm Drain

    Trade Tools

    N/A

    Site Work (Peach St.)

    UTIL-PEACH-195

    Install Fire Water

    Trade Tools

    N/A

    Offsite Work

    UTIL-OFF-175

    Install Point of Connection

    Excavator, Boom Lift

    N/A

    Offsite Work

    UTIL-OFF-185

    Install Piping to Project Site

    Excavator, Boom Lift

    N/A

    Offsite Work

    A2670

    Off-Site Street Improvements

    Trade Tools

    N/A

    Bldg. C

    C-NW-L7R-300

    Erect Structural Metal Stud Walls & Floor – Level 7 – Walls

    Trade Tools; Crane

    N/A

    Bldg. C

    C-NW-L7R-310

    Erect Structural Metal Stud Walls & Floor – Level 7 – Roofs

    Trade Tools; Crane

    N/A

    Bldg. C

    C-SE-EXT-EN-145

    Install Rigid Insulation

    Trade Tools

    N/A

    Bldg. C

    C-SE-EXT-EN-155

    Waterproofing

    Trade Tools

    N/A

    Bldg. C

    C-SE-EXT-CN-145

    Install Rigid Insulation

    Trade Tools

    N/A

    Bldg. C

    C-SE-EXT-CN-155

    Waterproofing

    Trade Tools

    N/A

    Bldg. C

    C-SE-EXT-SW-135

    Install Z-Furring Channel for Rigid Insulation

    Trade Tools

    N/A

    Bldg. C

    C-SE-EXT-CS-135

    Install Z-Furring Channel for Rigid Insulation

    Trade Tools

    N/A

    Bldg. C

    C-INT-E-145

    HVAC Piping Risers / Valves / BSB – Level 4E

    Trade Tools

    N/A

    Bldg. C

    C-INT-3E-175

    RC Channel Install on Underside of all Floor Joists – Level 3E

    Trade Tools

    N/A

     

    Bldg. C

    C-INT-5E-165

    Insulation / Fire & Sound Rating First Pass – Level 5E

    Trade Tools

    N/A

    Bldg. C

    C-INT-S-145

    HVAC Piping Risers / Valves / BSB / - Level 4S

    Trade Tools

    N/A

    Bldg. C

    C-INT-3S-175

    RC Channel Install on Underside of all Floor Joists – Level 3S

    Trade Tools

    N/A

    Bldg. C

    C-INT-5S-165

    Insulation / Fire & Sound Rating First Pass – Level 5S

    Trade Tools

    N/A

    Bldg. C

    C-INT-N-125

    HVAC Piping Risers / Valves / BSB – Level 2N

    Trade Tools

    N/A

    Bldg. C

    C-INT-2N-145

    MEPF Hanger & Strap Install – Level 2N

    Trade Tools

    N/A

    Bldg. C

    C-INT-2N-155

    Early Low Voltage Wire Pull – Level 2N

    Trade Tools

    N/A

    Bldg. C

    C-INT-2N-165

    Insulation / Fire & Sound Rating First Pass – Level 2N

    Trade Tools

    N/A

    Bldg. C

    C-INT-4N-925

    HVAC Piping / FCU Hanger & Strap Install – Level 4N

    Trade Tools

    N/A

    Bldg. C

    C-INT-5N-925

    HVAC Piping / FCU Hanger & Strap Install – Level 5N

    Trade Tools

    N/A

    Bldg. C

    C-INT-W-125

    HVAC Piping Risers / Valves / BSB – Level 2W

    Trade Tools

    N/A

    Bldg. C

    C-INT-2W-145

    MEPF Hanger & Strap Install – Level 2W

    Trade Tools

    N/A

    Bldg. C

    C-INT-2W-155

    Early Low Voltage Wire Pull – Level 2W

    Trade Tools

    N/A

    Bldg. C

    C-INT-2W-165

    Insulation / Fire & Sound Rating First Pass – Level 2W

    Trade Tools

    N/A

    Bldg. C

    C-INT-4W-925

    HVAC Piping / FCU Hanger & Strap Install – Level 4W

    Trade Tools

    N/A

    Bldg. C

    C-INT-5W-925

    HVAC Piping / FCU Hanger & Strap Install – Level 5W

    Trade Tools

    N/A

    Bldg. C

    C-NW-L1R-150

    RC Channel Install on Underside of all Floor Joists (Production Framing) – Level 1

    Trade Tools

    N/A

    Bldg. D

    D-DS-L3-125

    F/R/P Delay Strips

    N/A

    N/A

    Bldg. D

    D-L23-1000

    Priority Framing – Level 2-3

    Trade Tools

    N/A

    Bldg. D

    D-L56-170

    Erect Structural Metal Stud Walls & Floor – Level 5 - Walls

    Trade Tools; Crane

    N/A

    Bldg. D

    D-L56-160

    Erect Structural Metal Stud Walls & Floor – Level 5 - Roof

    Trade Tools; Crane

    N/A

    Bldg. D

    D-ML-120

    Manlift in Operation

    Trade Tools

    N/A

    Bldg. D

    D-INT-S-115

    HVAC Piping Risers / Valves / BSB – Level 1S

    Trade Tools

    N/A

    Bldg. D

    D-INT-2S-115

    Pre MEPF Rating / Shaft Pass – Level 2S

    Trade Tools

    N/A

    Bldg. D

    D-INT-2S-925

    HVAC Piping / FCU Hanger & Strap Install– Level 2S

    Trade Tools

    N/A

    Bldg. D

    D-INT-3S-915

    Core HVAC Piping Penetrations – Level 3S

    Trade Tools

    N/A

    Bldg. D

    D-INT-3S-905

    Core MEP Penetrations – Level 3S

    Trade Tools

    N/A

    Bldg. D

    D-INT-N-115

    HVAC Piping Risers / Valves / BSB – Level 1N

    Trade Tools

    N/A

    Bldg. D

    D-INT-1N-935

    Set FCU’s – Level 1N

    Trade Tools

    N/A

    Bldg. D

    D-INT-1N-145

    MEPF Hanger & Strap Install – Level 1N

    Trade Tools

    N/A

    Bldg. D

    D-INT-1N-155

    Early Low Voltage Wire Pull – Level 1N

    Trade Tools

    N/A

    Bldg. D

    D-INT-1N-165

    Insulation / Fire & Sound Rating First Pass – Level 1N

    Trade Tools

    N/A

    Bldg. D

    D-INT-2N-115

    Pre MEPF Rating / Shaft Pass – Level 2N

    Trade Tools

    N/A

    Bldg. D

    D-INT-2N-925

    HVAC Piping / FCU Hanger & Strap Install – Level 2N

    Trade Tools

    N/A

    Bldg. D

    D-INT-3N-915

    Core HVAC Piping Penetrations – Level 3N

    Trade Tools

    N/A

    Bldg. D

    D-INT-3N-905

    Core MEP Penetrations – Level 3N

    Trade Tools

    N/A

    Bldg. D

    D-L1R-110

    Priority Risers & In Floor Piping – Level 1

    Trade Tools

    N/A

    Bldg. D

    D-L1R-120

    Priority Electrical in Load Bearing Walls & Floors – Level 1

    Trade Tools

    N/A

    Bldg. D

    D-L1R-130

    MEPF Hanger & Strap Install – Level 1

    Trade Tools

    N/A

    Bldg. D

    D-CAFE-100
    Cafe Buildout

    Trade Tools

    N/A

    Site Work

    LOT-165

    Install Curbs, Gutters & flow Lines

    Trade Tools

    N/A

    Site Work

    LOT-175

    Install Swales & Dissipators

    Trade Tools

    N/A

     

      

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. 

    Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

     

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    N/A

    N/A

    N/A

    N/A

  • 950586B North District Phase 2 - Construction Alert #31

    Week of July 15, 2024

    Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Site Work

    UTIL-CS-115

    Excavate Sewer

    Excavator, Boom Lift

    N/A

    Site Work

    UTIL-PEACH-115

    Excavate Sewer

    Excavator, Boom Lift

    N/A

    Site Work

    UTIL-OFF-155

    Backfill Sewer

    Trade Tools

    N/A

    Site Work

    UTIL-OFF-165

    Excavate for Water POCs

    Excavator, Boom Lift

    N/A

    Offsite Work

    A2670

    Off-Site Street Improvements

    Trade Tools

    N/A

    Bldg. C

    C-DS-L3-115

    Cure Decks for Delay Strips (28 Calendar Days)

    Excavator, Boom Lift

    N/A

    Bldg. C

    C-NW-L12-100

    Priority Framing – Level 1-2

    Trade Tools

    N/A

    Bldg. C

    C-NW-L23-100

    Priority Framing – Level 2-3

    Trade Tools

    N/A

    Bldg. C

    C-NW-L45-110

    Erect Structural Metal Stud Walls & Floor – Level 4 - Walls

    Crane

    N/A

    Bldg. C

    C-NW-L45-100

    Erect Structural Metal Stud Walls & Floor – Level 5 - Floors

    Crane

    N/A

    Bldg. C

    C-STR-2020

    Fire Tape Drywall – CST03

    Trade Tools

    N/A

    Bldg. C

    C-ML-180

    Manlift in Operation

    N/A

    N/A

    Bldg. C

    C-ML-120

    Manlift in Operation

    N/A

    N/A

    Bldg. C

    C-SE-RF-130

    Field Measure / Procure Equipment Pad Sheet Metal Caps

    Trade Tools

    N/A

    Bldg. C

    C-SE-EXT-EN-125

    Install Clips for Wood Slats & Shade Canopies

    Trade Tools

    N/A

    Bldg. C

    C-SE-EXT-EN-255

    Layout / Weld Clips for Curtain Wall System

    Trade Tools

    N/A

    Bldg. C

    C-SE-EXT-CN-125

    Install Clips for Wood Slats & Shade Canopies

    Trade Tools

    N/A

    Bldg. C

    C-SE-EXT-SW-115

    Scaffold Setup

    Trade Tools

    N/A

    Bldg. C

    C-SE-EXT-CS-115

    Scaffold Setup

    Trade Tools

    N/A

    Bldg. C

    C-INT-E-115

    HVAC Piping Risers / Valves / BSB – Level 1E

    Trade Tools

    N/A

    Bldg. C

    C-INT-E-125

    HVAC Piping Risers / Valves / BSB – Level 2E

    Trade Tools

    N/A

    Bldg. C

    C-INT-1E-145

    MEPF Hanger & Strap Install – Level 1E

    Trade Tools

    N/A

    Bldg. C

    C-INT-1E-155

    Early Low Voltage Wire Pull – Level 1E

    Trade Tools

    N/A

    Bldg. C

    C-INT-1E-165

    Insulation / Fire & Sound Rating First Pass – Level 1E

    Trade Tools

    N/A

    Bldg. C

    C-INT-2E-125

    Priority Risers & In Floor Piping – Level 2E

    Trade Tools

    N/A

    Bldg. C

    C-INT-2E-135

    Priority Electrical in Load Bearing Walls & Floors – Level 2E

    Trade Tools

    N/A

    Bldg. C

    C-INT-2E-935

    Set FCU’s – Level 2E

    Trade Tools

    N/A

    Bldg. C

    C-INT-2E-145

    MEPF Hanger & Strap Install – Level 2E

    Trade Tools

    N/A

    Bldg. C

    C-INT-2E-155

    Early Low Voltage Wire Pull – Level 2E

    Trade Tools

    N/A

    Bldg. C

    C-INT-3E-115

    Pre MEPF Rating / Shaft Pass – Level 3E

    Trade Tools

    N/A

    Bldg. C

    C-INT-3E-125

    Priority Risers & In Floor Piping – Level 3E

    Trade Tools

    N/A

    Bldg. C

    C-INT-3E-135

    Priority Electrical in Load Bearing Walls & Floors – Level 3E

    Trade Tools

    N/A

    Bldg. C

    C-INT-3E-935

    Set FCU’s – Level 3E

    Trade Tools

    N/A

    Bldg. C

    C-INT-4E-115

    Pre MEPF Rating / Shaft Pass – Level 4E

    Trade Tools

    N/A

    Bldg. C

    C-INT-S-115

    HVAC Piping Risers / Valves / BSB – Level 1S

    Trade Tools

    N/A

    Bldg. C

    C-INT-S-125

    HVAC Piping Risers / Valves / BSB – Level 2S

    Trade Tools

    N/A

    Bldg. C

    C-INT-1S-145

    MEPF Hanger & Strap Install – Level 1S

    Trade Tools

    N/A

    Bldg. C

    C-INT-1S-155

    Early Low Voltage Wire Pull – Level 1S

    Trade Tools

    N/A

    Bldg. C

    C-INT-1S-165

    Insulation / Fire & Sound Rating First Pass – Level 1S

    Trade Tools

    N/A

    Bldg. C

    C-INT-2S-125

    Priority Risers & In Floor Piping – Level 2S

    Trade Tools

    N/A

    Bldg. C

    C-INT-2S-135

    Priority Electrical in Load Bearing Walls & Floors – Level 2S

    Trade Tools

    N/A

    Bldg. C

    C-INT-2S-935

    Set FCU’s – Level 2S

    Trade Tools

    N/A

    Bldg. C

    C-INT-2S-145

    MEPF Hanger & Strap Install – Level 2S

    Trade Tools

    N/A

    Bldg. C

    C-INT-2S-155

    Early Low Voltage Wire Pull – Level 2S

    Trade Tools

    N/A

    Bldg. C

    C-INT-3S-115

    Pre MEPF Rating / Shaft Pass – Level 3S

    Trade Tools

    N/A

    Bldg. C

    C-INT-3S-125

    Priority Risers & In Floor Piping – Level 3S

    Trade Tools

    N/A

    Bldg. C

    C-INT-3S-135

    Priority Electrical in Load Bearing Walls & Floors – Level 3S

    Trade Tools

    N/A

    Bldg. C

    C-INT-3S-935

    Set FCU’s – Level 3S

    Trade Tools

    N/A

    Bldg. C

    C-INT-4S-115

    Pre MEPF Rating / Shaft Pass – Level 4S

    Trade Tools

    N/A

    Bldg. C

    C-NW-L1R-100

    Pre MEPF Rating / Shaft Pass – Level 1

    Trade Tools

    N/A

    Bldg. C

    C-NW-E1-290

    Infill Wall Framing – Main Electrical Room C129

    Trade Tools

    N/A

    Bldg. C

    C-NW-E1-190

    HVAC Rough Ins

    Trade Tools

    N/A

    Bldg. C

    C-NW-E1-300

    Infill Wall Framing – Inverter Room C125

    Trade Tools

    N/A

    Bldg. C

    C-NW-E1-320

    HVAC Rough Ins

    Trade Tools

    N/A

    Bldg. D

    FR04-135

    F/R/P Leaveout Slab on Grade

    N/A

    N/A

    Bldg. D

    D-DECK-L2N-265

    Remove Re-Shores – L1

    Trade Tools

    N/A

    Bldg. D

    D-DS-L2-125

    F/R/P Delay Strips

    N/A

    N/A

    Bldg. D

    D-DECK-L3W-255

    Strip Edge Form & Prep for Stress

    Trade Tools

    N/A

    Bldg. D

    D-DECK-L3N-235

    Cure for Stress

    Trade Tools

    N/A

    Bldg. D

    D-DECK-L3N-265

    Cure for CFS Erection

    Trade Tools

    N/A

    Bldg. D

    D-DECK-L3N-245

    Stress

    Trade Tools

    N/A

    Bldg. D

    D-DECK-L3N-225

    Strip & Haul of Deck System

    Trade Tools

    N/A

    Bldg. D

    D-DS-L3-115

    Cure Decks for Delay Strips (28 Calendar Days)

    Excavator, Boom Lift

    N/A

    Bldg. D

    D-L12-1000

    Priority Framing – Level 1-2

    Trade Tools

    N/A

    Bldg. D

    D-L34-160

    Erect Structural Metal Stud Walls & Floor – Level 3 - Walls

    Excavator, Boom Lift

    N/A

    Bldg. D

    D-ML-110

    Erect / Certify Manlift

    Trade Tools

    N/A

    Site Work

    LOT-125

    Install Site Lighting Electrical Conduit

    Trade Tools

    N/A

    Site Work

    LOT-135

    Install Site Lighting Pole Bases

    Trade Tools

    N/A

     

     

    Week of July 22, 2024

    Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Site Work

    UTIL-CS-125

    Install Sewer

    Trade Tools

    N/A

    Site Work

    UTIL-PEACH-125

    Install Sewer Manholes

    Trade Tools

    N/A

    Site Work

    UTIL-PEACH-135

    Install Grease Interceptor

    Trade Tools

    N/A

    Site Work

    UTIL-OFF-165

    Excavate for Water POCs

    Excavator, Boom Lift

    N/A

    Offsite Work

    A2670

    Off-Site Street Improvements

    Trade Tools

    N/A

    Bldg. C

    C-DS-L3-115

    Cure Decks for Delay Strips (28 Calendar Days)

    Trade Tools

    N/A

    Bldg. C

    C-DS-L3-125

    F/R/P Delay Strips

    N/A

    N/A

    Bldg. C

    C-NW-L23-100

    Priority Framing – Level 2-3

    Trade Tools

    N/A

    Bldg. C

    C-NW-L56-110

    Erect Structural Metal Stud Walls & Floor – Level 5 - Walls

    Trade Tools

    N/A

    Bldg. C

    C-NW-L56-100

    Erect Structural Metal Stud Walls & Floor – Level 6 - Floors

    Trade Tools

    N/A

    Bldg. C

    C-ML-180

    Manlift in Operation

    N/A

    N/A

    Bldg. C

    C-ML-120

    Manlift in Operation

    N/A

    N/A

    Bldg. C

    C-SE-RF-130

    Field Measure / Procure Equipment Pad Sheet Metal Caps

    Trade Tools

    N/A

    Bldg. C

    C-SE-EXT-EN-125

    Install Clips for Wood Slats & Shade Canopies

    Trade Tools

    N/A

    Bldg. C

    C-SE-EXT-EN-135

    Install Z-Furring Channel for Rigid Insulation

    Trade Tools

    N/A

    Bldg. C

    C-SE-EXT-CN-125

    Install Clips for Wood Slats & Shade Canopies

    Trade Tools

    N/A

    Bldg. C

    C-SE-EXT-CN-135

    Install Z-Furring Channel for Rigid Insulation

    Trade Tools

    N/A

    Bldg. C

    C-SE-EXT-SW-115

    Scaffold Setup

    Trade Tools

    N/A

    Bldg. C

    C-SE-EXT-CS-115

    Scaffold Setup

    Trade Tools

    N/A

    Bldg. C

    C-INT-E-125

    HVAC Piping Risers / Valves / BSB – Level 2E

    Trade Tools

    N/A

    Bldg. C

    C-INT-1E-175

    RC Channel Install on Underside of all Floor Joists – Level 1E

    Trade Tools

    N/A

    Bldg. C

    C-INT-2E-165

    Insulation / Fire & Sound Rating First Pass – Level 2E

    Trade Tools

    N/A

    Bldg. C

    C-INT-3E-935

    Set FCU’s – Level 3E

    Trade Tools

    N/A

    Bldg. C

    C-INT-3E-145

    MEPF Hanger & Strap Install – Level 3E

    Trade Tools

    N/A

    Bldg. C

    C-INT-3E-155

    Early Low Voltage Wire Pull – Level 3E

    Trade Tools

    N/A

    Bldg. C

    C-INT-3E-165

    Insulation / Fire & Sound Rating First Pass – Level 3E

    Trade Tools

    N/A

    Bldg. C

    C-INT-4E-115

    Pre MEPF Rating / Shaft Pass – Level 4E

    Trade Tools

    N/A

    Bldg. C

    C-INT-4E-125

    Priority Risers & In Floor Piping – Level 4E

    Trade Tools

    N/A

    Bldg. C

    C-INT-4E-135

    Priority Electrical in Load Bearing Walls & Floors – Level 4E

    Trade Tools

    N/A

    Bldg. C

    C-INT-4E-935

    Set FCUs – Level 4E

    Trade Tools

    N/A

    Bldg. C

    C-INT-4E-145

    MEPF Hanger & Strap Install – Level 4E

    Trade Tools

    N/A

    Bldg. C

    C-INT-4E-155

    Early Low Voltage Wire Pull – Level 4E

    Trade Tools

    N/A

    Bldg. C

    C-INT-5E-115

    Pre MEPF Rating / Shaft Pass – Level 5E

    Trade Tools

    N/A

    Bldg. C

    C-INT-S-125

    HVAC Piping Risers / Valves / BSB – Level 2S

    Trade Tools

    N/A

    Bldg. C

    C-INT-1S-175

    RC Channel Install on Underside of all Floor Joists – Level 1S

    Trade Tools

    N/A

    Bldg. C

    C-INT-2S-165

    Insulation / Fire & Sound Rating First Pass – Level 2S

    Trade Tools

    N/A

    Bldg. C

    C-INT-3S-935

    Set FCUs – Level 3S

    Trade Tools

    N/A

    Bldg. C

    C-INT-3S-145

    MEPF Hanger & Strap Install – Level 3S

    Trade Tools

    N/A

    Bldg. C

    C-INT-3S-155

    Early Low Voltage Wire Pull – Level 3S

    Trade Tools

    N/A

    Bldg. C

    C-INT-3S-165

    Insulation / Fire & Sound Rating First Pass – Level 3S

    Trade Tools

    N/A

    Bldg. C

    C-INT-4S-115

    Pre MEPF Rating / Shaft Pass – Level 4S

    Trade Tools

    N/A

    Bldg. C

    C-INT-4S-125

    Priority Risers & In Floor Piping – Level 4S

    Trade Tools

    N/A

    Bldg. C

    C-INT-4S-135

    Priority Electrical in Load Bearing Walls & Floors – Level 4S

    Trade Tools

    N/A

    Bldg. C

    C-INT-4S-935

    Set FCUs – Level 4S

    Trade Tools

    N/A

    Bldg. C

    C-INT-4S-145

    MEPF Hanger & Strap Install – Level 4S

    Trade Tools

    N/A

    Bldg. C

    C-INT-4S-155

    Early Low Voltage Wire Pull – Level 4S

    Trade Tools

    N/A

    Bldg. C

    C-INT-5S-115

    Pre MEPF Rating / Shaft Pass – Level 5S

    Trade Tools

    N/A

    Bldg. C

    C-INT-N-115

    HVAC Piping Risers / Valves / BSB – Level 1N

    Trade Tools

    N/A

    Bldg. C

    C-INT-3N-915

    Core HVAC Piping Penetrations – Level 3N

    Trade Tools

    N/A

    Bldg. C

    C-INT-3N-905

    Core MEP Penetrations – Level 3N

    Trade Tools

    N/A

    Bldg. C

    C-INT-W-115

    HVAC Piping Risers / Valves / BSB – Level 1W

    Trade Tools

    N/A

    Bldg. C

    C-INT-3W-915

    Core HVAC Piping Penetrations – Level 3W

    Trade Tools

    N/A

    Bldg. C

    C-INT-3W-905

    Core MEP Penetrations – Level 3W

    Trade Tools

    N/A

    Bldg. C

    C-NW-L1R-100

    Pre MEPF Rating / Shaft Pass – Level 1

    Trade Tools

    N/A

    Bldg. C

    C-NW-L1R-110

    Priority Risers & In Floor Piping – Level 1

    Trade Tools

    N/A

    Bldg. C

    C-NW-L1R-120

    Priority Electrical in Load Bearing Walls & Floors – Level 1

    Trade Tools

    N/A

    Bldg. D

    D-DS-L3-115

    Cure Decks for Delay Strips (28 Calendar Days)

    Excavator, Boom Lift

    N/A

    Bldg. D

    D-L12-1000

    Priority Framing – Level 1-2

    Trade Tools

    N/A

    Bldg. D

    D-L34-160

    Erect Structural Metal Stud Walls & Floor – Level 3 - Walls

    Excavator, Boom Lift

    N/A

    Bldg. D

    D-L34-170

    Erect Structural Metal Stud Walls & Floor – Level 4 - Floors

    Excavator, Boom Lift

    N/A

    Bldg. D

    D-ML-110

    Erect / Certify Manlift

    Trade Tools

    N/A

    Bldg. D

    D-ML-120

    Manlift in Operation

    Trade Tools

    N/A

    Site Work

    LOT-135

    Install Site Lighting Pole Bases

    Trade Tools

    N/A

    Site Work

    LOT-145

    Install Irrigation Sleeves

    Trade Tools

    N/A

     

     

    Week of July 29, 2024

    Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Site Work

    UTIL-CS-135

    Excavate Storm Drain

    Trade Tools

    N/A

    Site Work

    UTIL-PEACH-145

    Install Sewer

    Trade Tools

    N/A

    Site Work

    UTIL-PEACH-155

    Excavate Storm Drain

    Trade Tools

    N/A

    Site Work

    UTIL-OFF-165

    Excavate for Water POCs

    Excavator, Boom Lift

    N/A

    Site Work

    UTIL-OFF-175

    Install Point of Connection

    Excavator, Boom Lift

    N/A

    Offsite Work

    A2670

    Off-Site Street Improvements

    Trade Tools

    N/A

    Bldg. C

    C-DS-L3-125

    F/R/P Delay Strips

    N/A

    N/A

    Bldg. C

    C-NW-L23-100

    Priority Framing – Level 2-3

    Trade Tools

    N/A

    Bldg. C

    C-NW-L67-110

    Erect Structural Metal Stud Walls & Floors – Level 6 - Walls

    Trade Tools

    N/A

    Bldg. C

    C-NW-L67-100

    Erect Structural Metal Stud Walls & Floors – Level 7 - Floors

    Trade Tools

    N/A

    Bldg. C

    C-ML-180

    Manlift in Operation

    N/A

    N/A

    Bldg. C

    C-ML-120

    Manlift in Operation

    N/A

    N/A

    Bldg. C

    C-SE-EXT-EN-135

    Install Z-Furring Channel for Rigid Insulation

    Trade Tools

    N/A

    Bldg. C

    C-SE-EXT-EN-145

    Install Rigid Insulation

    Trade Tools

    N/A

    Bldg. C

    C-SE-EXT-CN-135

    Install Z-Furring Channel for Rigid Insulation

    Trade Tools

    N/A

    Bldg. C

    C-SE-EXT-CN-145

    Install Rigid Insulation

    Trade Tools

    N/A

    Bldg. C

    C-SE-EXT-SW-125

    Install Clips for Wood Slats & Shade Canopies

    Trade Tools

    N/A

    Bldg. C

    C-SE-EXT-SW-255

    Layout / Weld Clips for Curtain Wall System

    Trade Tools

    N/A

    Bldg. C

    C-SE-EXT-CS-125

    Install Clips for Wood Slats & Shade Canopies

    Trade Tools

    N/A

    Bldg. C

    C-SE-EXT-CS-255

    Layout / Weld Clips for Curtain Wall System

    Trade Tools

    N/A

    Bldg. C

    C-INT-E-135

    HVAC Piping Risers / Valves / BSB – Level 3E

    Trade Tools

    N/A

    Bldg. C

    C-INT-1E-175

    RC Channel Install on Underside of all Floor Joists – Level 1E

     

    Trade Tools

    N/A

    Bldg. C

    C-INT-2E-175

    RC Channel Install on Underside of all Floor Joists – Level 2E

    Trade Tools

    N/A

    Bldg. C

    C-INT-3E-165

    Insulation / Fire & Sound Rating First Pass – Level 3E

    Trade Tools

    N/A

     

    Bldg. C

    C-INT-4E-145

    MEPF Hanger & Strap Install – Level 4E

    Trade Tools

    N/A

    Bldg. C

    C-INT-4E-155

    Early Low Voltage Wire Pull – Level 4E

    Trade Tools

    N/A

    Bldg. C

    C-INT-4E-165

    Insulation / Fire & Sound Rating First Pass – Level 4E

    Trade Tools

    N/A

    Bldg. C

    C-INT-5E-125

    Priority Risers & In Floor Piping – Level 5E

    Trade Tools

    N/A

    Bldg. C

    C-INT-5E-135

    Priority Electrical in Load Bearing Walls & Floors – Level 5E

    Trade Tools

    N/A

    Bldg. C

    C-INT-5E-935

    Set FCUs – Level 5E

    Trade Tools

    N/A

    Bldg. C

    C-INT-5E-145

    MEPF Hanger & Strap Install – Level 5E

    Trade Tools

    N/A

    Bldg. C

    C-INT-5E-155

    Early Low Voltage Wire Pull – Level 5E

    Trade Tools

    N/A

    Bldg. C

    C-INT-S-135

    HVAC Piping Risers / Valves / BSB / - Level 3S

    Trade Tools

    N/A

    Bldg. C

    C-INT-1S-175

    RC Channel Install on Underside of all Floor Joists – Level 1S

    Trade Tools

    N/A

    Bldg. C

    C-INT-2S-175

    RC Channel Install on Underside of all Floor Joists – Level 2S

    Trade Tools

    N/A

    Bldg. C

    C-INT-3S-165

    Insulation / Fire & Sound Rating First Pass – Level 3S

    Trade Tools

    N/A

    Bldg. C

    C-INT-4S-145

    MEPF Hanger & Strap Install – Level 4S

    Trade Tools

    N/A

    Bldg. C

    C-INT-4S-155

    Early Low Voltage Wire Pull – Level 4S

    Trade Tools

    N/A

    Bldg. C

    C-INT-4S-165

    Insulation / Fire & Sound Rating First Pass – Level 4S

    Trade Tools

    N/A

    Bldg. C

    C-INT-5S-125

    Priority Risers & In Floor Piping – Level 5S

    Trade Tools

    N/A

    Bldg. C

    C-INT-5S-135

    Priority Electrical in Load Bearing Walls & Floors – Level 5S

    Trade Tools

    N/A

    Bldg. C

    C-INT-5S-935

    Set FCUs – Level 5S

    Trade Tools

    N/A

    Bldg. C

    C-INT-5S-145

    MEPF Hanger & Strap Install – Level 5S

    Trade Tools

    N/A

    Bldg. C

    C-INT-5S-155

    Early Low Voltage Wire Pull – Level 5S

    Trade Tools

    N/A

    Bldg. C

    C-INT-N-115

    HVAC Piping Risers / Valves / BSB – Level 1N

    Trade Tools

    N/A

    Bldg. C

    C-INT-2N-115

    Pre MEPF Rating / Shaft Pass – Level 2N

    Trade Tools

    N/A

    Bldg. C

    C-INT-2N-925

    HVAC Piping / FCU Hanger & Strap Install – Level 2N

    Trade Tools

    N/A

    Bldg. C

    C-INT-4N-915

    Core HVAC Piping Penetrations – Level 4N

    Trade Tools

    N/A

    Bldg. C

    C-INT-4N-905

    Core MEP Penetrations – Level 4N

    Trade Tools

    N/A

    Bldg. C

    C-INT-W-115

    HVAC Piping Risers / Valves / BSB – Level 1W

    Trade Tools

    N/A

    Bldg. C

    C-INT-2W-115

    Pre MEPF Rating / Shaft Pass – Level 2W

    Trade Tools

    N/A

    Bldg. C

    C-INT-2W-925

    HVAC Piping / FCU Hanger & Strap Install– Level 2W

    Trade Tools

    N/A

    Bldg. C

    C-INT-4W-915

    Core HVAC Piping Penetrations – Level 4W

    Trade Tools

    N/A

    Bldg. C

    C-INT-4W-905

    Core MEP Penetrations – Level 4W

    Trade Tools

    N/A

    Bldg. C

    C-NW-L1R-130

    MEPF Hanger & Strap Install – Level 1

    Trade Tools

    N/A

    Bldg. D

    D-DS-L3-115

    Cure Decks for Delay Strips (28 Calendar Days)

    Excavator, Boom Lift

    N/A

    Bldg. D

    D-L12-1000

    Priority Framing – Level 1-2

    Trade Tools

    N/A

    Bldg. D

    D-L23-1000

    Priority Framing – Level 2-3

    Trade Tools

    N/A

    Bldg. D

    D-L34-170

    Erect Structural Metal Stud Walls & Floor – Level 4 - Floors

    Excavator, Boom Lift

    N/A

    Bldg. D

    D-L45-170

    Erect Structural Metal Stud Walls & Floor – Level 4 - Walls

    Excavator, Boom Lift

    N/A

    Bldg. D

    D-ML-120

    Manlift in Operation

    Trade Tools

    N/A

    Bldg. D

    D-INT-1N-115

    Pre MEPF Rating / Shaft Pass – Level 1N

    Trade Tools

    N/A

    Bldg. D

    D-INT-1N-925

    HVAC Piping / FCU Hanger & Strap Install – Level 1N

    Trade Tools

    N/A

    Bldg. D

    D-L1R-100

    Pre MEPF Rating / Shaft Pass – Level 1

    Trade Tools

    N/A

    Bldg. D

    D-CAFE-100
    Cafe Buildout

    Trade Tools

    N/A

    Site Work

    LOT-145

    Install Irrigation Sleeves

    Trade Tools

    N/A

    Site Work

    LOT-155

    Grade for Curbs, Gutters & Swales

    Trade Tools

    N/A

     

      

     

    Current and Upcoming Anticipated Closures

    The following shutdown(s)/ closures are anticipated as indicated below. Updates to this schedule will be released weekly in the Project Construction Advisories until the work is complete. 

    Please contact John Franklin with any specific questions or concerns at john.franklin@ucr.edu.

    Description

    Location

    Duration & Date

    Impacted Buildings/ Facilities

    N/A

    N/A

    N/A

    N/A

  • 950586B North District Phase 2 - Construction Alert #30

    Week of July 15, 2024

    Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Site Work

    UTIL-CS-115

    Excavate Sewer

    Excavator, Boom Lift

    N/A

    Site Work

    UTIL-PEACH-115

    Excavate Sewer

    Excavator, Boom Lift

    N/A

    Site Work

    UTIL-OFF-155

    Backfill Sewer

    Trade Tools

    N/A

    Site Work

    UTIL-OFF-165

    Excavate for Water POCs

    Excavator, Boom Lift

    N/A

    Offsite Work

    A2670

    Off-Site Street Improvements

    Trade Tools

    N/A

    Bldg. C

    C-DS-L3-115

    Cure Decks for Delay Strips (28 Calendar Days)

    Excavator, Boom Lift

    N/A

    Bldg. C

    C-NW-L12-100

    Priority Framing – Level 1-2

    Trade Tools

    N/A

    Bldg. C

    C-NW-L23-100

    Priority Framing – Level 2-3

    Trade Tools

    N/A

    Bldg. C

    C-NW-L45-110

    Erect Structural Metal Stud Walls & Floor – Level 4 - Walls

    Crane