Student Health and Counseling Center

 

Student Health and Counseling Center

Create an identifiable and easily accessible facility that welcomes members of our diverse campus community and conveys a commitment to quality care, innovation in technical, medical and clinical services, student support and well being. This facility aligns with the missions and values of the UCR campus, the Division of Student Affairs, Student Health Services, Counseling and Psychological Services, Student Affairs Case Management, and The Well that support student retention and success through optimization of emotional and physical health, through direct service, promotion, prevention, education, student engagement, and provision of resources and referrals.


Project Scope:

  • The new SHCC will further improve health, counseling and wellness services currently provided at the Campus
  • It will offer integrated and holistic care in a welcoming and student-centered environment, with increased medical and mental health providers on staff
  • The design of the SHCC should address the students’ experience
  • In addition to providing medical and mental health services, the new facility is envisioned as a destination within the UCR Campus
  • While the current Student Health Center is relatively insular, the new SHCC should be more visible and become an integral part of the UCR Campus
  • Different programs within the SHCC will share common resources and they will be administered accordingly
  • The SHCC building space should provide opportunities for collaboration, be flexible and have room for growth
  • To best serve the significant number of commuter students. t the SHCC should be a comfortable and welcoming space that accommodates these students while waiting for appointments

Student Health & Counseling Center Construction Updates
  • 950578- STUDENT HEALTH & COUNSELING CENTER CONSTRUCTION ADVISORY #24

    Current Weeks

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Project Site

    Continuation of Structural steel deliveries

    Delivery semi-trucks, Rough terrain fork lift, Various hand tools

    Moderate level of backup alarms, vehicle engine and pedestrian noise. Increased traffic along Linden.

     

    Project Site

    Continuation of Structural steel erection

    Truck crane, Various hand tools

    Moderate level of, vehicle engine noise, occasional hammering and pedestrian noise.

     

    Project Site

    Utility Yard Footing- setting rebar

     

    Mini Excavator, various hand tools

    Moderate level of vehicle engine and pedestrian noise.

     

    Contractor Parking Area

    Continued parking for contractor and sub-contractors; storage of equipment

     

    Contractor vehicles

    Low level of vehicle and pedestrian noise.

     

    Contractor Offices

    Continued office use

    Office Equipment and Furniture

    Low level of pedestrian noise

     

     

    Week of 8-15-2022

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Project Site

    Continuation of Structural steel deliveries

    Delivery semi-trucks, Rough terrain fork lift, Various hand tools

    Moderate level of backup alarms, vehicle engine and pedestrian noise. Increased traffic along Linden.

     

    Project Site

    Continuation of Structural steel erection

    Truck crane, Various hand tools

    Moderate level of, vehicle engine noise, occasional hammering and pedestrian noise.

     

    Landscape Area between Dundee and Glasgow and Dundee Glasgow Access Road

     

    Landscape Restoration

     

    Mini Excavator, various hand tools

    Periodic limited access on road with traffic controlled by flag people.

    Project Site

    Utility Yard Footing concrete pour

     

    Mini Excavator, various hand tools

    Moderate level of vehicle engine and pedestrian noise.

     

    Project Site

    Utility Yard concrete block wall construction

     

    Fork lift, various hand tools

    Moderate level of vehicle engine and pedestrian noise.

     

    Contractor Parking Area

    Continued parking for contractor and sub-contractors; storage of equipment

     

    Contractor vehicles

    Low level of vehicle and pedestrian noise.

     

    Contractor Offices

    Continued office use

    Office Equipment and Furniture

    Low level of pedestrian noise

    Upcoming Anticipated Utility Shutdowns

    The following utility shutdown(s) are anticipated in the weeks to come.  Specific dates are approximations and logistical details are pending approval. Please contact Dexter Galang with any specific questions or concerns at dexter.galang@ucr.edu.

     

    Description

    Location

    Proposed

    Duration & Date

    Potential Impacted Buildings/ Facilities

    None anticipated at this time

    -

    -

    -

     

  • 950578- STUDENT HEALTH & COUNSELING CENTER CONSTRUCTION ADVISORY #23

    Current Weeks

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Project Site

    Continuation of Structural steel deliveries

    Delivery semi-trucks, Rough terrain fork lift, Various hand tools

    Moderate level of backup alarms, vehicle engine and pedestrian noise. Increased traffic along Linden.

     

    Project Site

    Continuation of Structural steel erection

    Truck crane, Various hand tools

    Moderate level of, vehicle engine noise, occasional hammering and pedestrian noise.

     

    Landscape Area between Dundee and Glasgow and Dundee Glasgow Access Road

     

    Sewer Connection

     

    Mini Excavator, various hand tools

    Periodic limited access on road with traffic controlled by flag people. Temporary walkways will be installed using metal plates.

    Project Site

    Utility Yard Footing excavation

     

    Mini Excavator, various hand tools

    Moderate level of vehicle engine and pedestrian noise.

     

    Contractor Parking Area

    Continued parking for contractor and sub-contractors; storage of equipment

    Contractor vehicles

    Low level of vehicle and pedestrian noise.

     

    Contractor Offices

    Continued office use

    Office Equipment and Furniture

    Low level of pedestrian noise

     

     

     

    Week of 8-1-2022

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Project Site

    Continuation of Structural steel deliveries

    Delivery semi-trucks, Rough terrain fork lift, Various hand tools

    Moderate level of backup alarms, vehicle engine and pedestrian noise. Increased traffic along Linden.

     

    Project Site

    Continuation of Structural steel erection

    Truck crane, Various hand tools

    Moderate level of, vehicle engine noise, occasional hammering and pedestrian noise.

     

    Landscape Area between Dundee and Glasgow and Dundee Glasgow Access Road

     

    Sewer Connection

     

    Mini Excavator, various hand tools

    Periodic limited access on road with traffic controlled by flag people. Temporary walkways will be installed using metal plates.

    Project Site

    Utility Yard Footing excavation

     

    Mini Excavator, various hand tools

    Moderate level of vehicle engine and pedestrian noise.

     

    Contractor Parking Area

    Continued parking for contractor and sub-contractors; storage of equipment

     

    Contractor vehicles

    Low level of vehicle and pedestrian noise.

     

    Contractor Offices

    Continued office use

    Office Equipment and Furniture

    Low level of pedestrian noise

     

    Upcoming Anticipated Utility Shutdowns

    The following utility shutdown(s) are anticipated in the weeks to come.  Specific dates are approximations and logistical details are pending approval. Please contact Dexter Galang with any specific questions or concerns at dexter.galang@ucr.edu.

     

    Description

    Location

    Proposed

    Duration & Date

    Potential Impacted Buildings/ Facilities

    None anticipated at this time

    -

    -

    -

  • 950578- STUDENT HEALTH & COUNSELING CENTER CONSTRUCTION ADVISORY #22

    Current Weeks

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Project Site

    Retaining wall waterproofing

    Various hand tools

    Low level of pedestrian noise.

     

    Project Site

    Structural steel deliveries

    Delivery semi-trucks, Rough terrain fork lift, Various hand tools

    Moderate level of backup alarms, vehicle engine and pedestrian noise. Increased traffic along Linden.

     

    Project Site

    Structural steel erection

    Truck crane, Various hand tools

    Moderate level of, vehicle engine noise, occasional hammering and pedestrian noise.

     

    Project Site

    Telecom conduit installation

    Mini Excavator, various hand tools

    Moderate level of backup alarms, vehicle engine and pedestrian noise.

     

    Landscape Area between Dundee and Glasgow and Dundee Glasgow Access Road

     

    Sewer Connection

     

    Mini Excavator, various hand tools

    Occasion high levels of jackhammering noise with moderate level of vehicle and pedestrian noise.  Periodic limited access on road with traffic controlled by flag people. Temporary walkways will be installed using metal plates.  Sewer connection work will continue until the end of July with no noticeable  interruption to service in surrounding areas.

    Strong odors may be present at this time

     

    Project Site

    Continue underground utility installation

     

    Mini Excavator, various hand tools

    Moderate level of vehicle engine and pedestrian noise.

     

    Contractor Parking Area

    Continued parking for contractor and sub-contractors; storage of equipment

    Contractor vehicles

    Low level of vehicle and pedestrian noise.

     

    Contractor Offices

    Continued office use

    Office Equipment and Furniture

    Low level of pedestrian noise

     

     

     

    Week of 8-1-2022

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Project Site

    Continued Structural steel deliveries

    Delivery semi-trucks, Rough terrain fork lift, Various hand tools

    Moderate level of backup alarms, vehicle engine and pedestrian noise. Increased traffic along Linden.

     

    Project Site

    Continued Structural steel erection

    Truck crane, Various hand tools

    Moderate level of, vehicle engine noise, occasional hammering and pedestrian noise.

     

    Landscape Area between Dundee and Glasgow and Dundee Glasgow Access Road

     

    Sewer Connection

     

    Mini Excavator, various hand tools

    Occasion high levels of jackhammering noise with moderate level of vehicle and pedestrian noise.  Periodic limited access on road with traffic controlled by flag people. Temporary walkways will be installed using metal plates.  Sewer connection work will continue until the end of July with no noticeable  interruption to service in surrounding areas.

    Strong odors may be present at this time

     

    Project Site

    Continue underground utility installation

     

    Mini Excavator, various hand tools

    Moderate level of vehicle engine and pedestrian noise.

     

    Contractor Parking Area

    Continued parking for contractor and sub-contractors; storage of equipment

     

    Contractor vehicles

    Low level of vehicle and pedestrian noise.

     

    Contractor Offices

    Continued office use

    Office Equipment and Furniture

    Low level of pedestrian noise

     

    Upcoming Anticipated Utility Shutdowns

    The following utility shutdown(s) are anticipated in the weeks to come.  Specific dates are approximations and logistical details are pending approval. Please contact Dexter Galang with any specific questions or concerns at dexter.galang@ucr.edu.

     

    Description

    Location

    Proposed

    Duration & Date

    Potential Impacted Buildings/ Facilities

    None anticipated at this time

    -

    -

    -

  • 950578- STUDENT HEALTH & COUNSELING CENTER CONSTRUCTION ADVISORY #21

    Current Weeks

    Construction Activities

     

    Please note that summer work hours will begin at 6:00 am

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Project Site

    Retaining wall waterproofing

    Various hand tools

    Low level of pedestrian noise.

     

    Project Site

    Structural steel deliveries

    Delivery semi-trucks, Rough terrain fork lift, Various hand tools

    Moderate level of backup alarms, vehicle engine and pedestrian noise. Increased traffic along Linden.

     

    Project Site

    Structural steel erection

    Truck crane, Rough terrain fork lift, Various hand tools

    Moderate level of backup alarms, vehicle engine and pedestrian noise.

     

    Project Site

    Telecom conduit installation

    Mini Excavator, various hand tools

    Moderate level of backup alarms, vehicle engine and pedestrian noise.

     

    Landscape Area between Dundee and Glasgow

     

    Sewer Connection

     

    Mini Excavator, various hand tools

    Moderate level of vehicle and pedestrian noise.  Periodic limited access on road with traffic controlled by flag people. Temporary walkways will be installed using metal plates.  Sewer connection work will continue until the end of July with no noticeable  interruption to service in surrounding areas.

     

    Project Site

    Continue underground utility installation

     

    Mini Excavator, various hand tools

    Moderate level of vehicle engine and pedestrian noise.

     

    Contractor Parking Area

    Continued parking for contractor and sub-contractors; storage of equipment

    Contractor vehicles

    Low level of vehicle and pedestrian noise.

     

    Contractor Offices

    Continued office use

    Office Equipment and Furniture

    Low level of pedestrian noise

     

     

     

    Week of 7-25-2022

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Project Site

    Continuation of structural steel deliveries

    Delivery semi-trucks, Rough terrain fork lift, Various hand tools

    Moderate level of backup alarms, vehicle engine and pedestrian noise. Increased traffic along Linden.

     

    Project Site

    Continuation of structural steel erection

    Truck crane, Rough terrain fork lift, Various hand tools

    Moderate level of backup alarms, vehicle engine and pedestrian noise.

     

    Landscape Area between Dundee and Glasgow

     

    Continuation of sewer connection

     

    Mini Excavator, various hand tools

    Moderate level of vehicle and pedestrian noise.  Periodic limited access on road with traffic controlled by flag people. Temporary walkways will be installed using metal plates.  Sewer connection work will continue until the end of July with no noticeable  interruption to service in surrounding areas.

     

    Contractor Parking Area

    Continued parking for contractor and sub-contractors; storage of equipment

    Contractor vehicles

    Low level of vehicle and pedestrian noise.

     

    Contractor Offices

    Continued office use

    Office Equipment and Furniture

    Low level of pedestrian noise

     

    Upcoming Anticipated Utility Shutdowns

    The following utility shutdown(s) are anticipated in the weeks to come.  Specific dates are approximations and logistical details are pending approval. Please contact Dexter Galang with any specific questions or concerns at dexter.galang@ucr.edu.

     

    Description

    Location

    Proposed

    Duration & Date

    Potential Impacted Buildings/ Facilities

    None anticipated at this time

    -

    -

    -

  • 950578- STUDENT HEALTH & COUNSELING CENTER CONSTRUCTION ADVISORY #20

    Current Weeks

    Construction Activities

     

    Please note that summer work hours will begin at 6:00 am

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Project Site

    Concrete wall pour

    Concrete Pumper and Mixer Trucks, Various hand tools

    Moderate level of vehicle engine, backup warning sounds and pedestrian noise.

     

    Landscape Area between Dundee and Glasgow

     

    Sewer Connection

     

    Mini Excavator, various hand tools

    Moderate level of vehicle and pedestrian noise.  Periodic limited access on road with traffic controlled by flag people. Temporary walkways will be installed using metal plates.  Sewer connection work will continue until the end of July with no noticeable  interruption to service in surrounding areas.

     

    Project Site

    Continue underground utility installation

     

    Mini Excavator, various hand tools

    Moderate level of vehicle engine and pedestrian noise.

     

    Contractor Parking Area

    Continued parking for contractor and sub-contractors; storage of equipment

    Contractor vehicles

    Low level of vehicle and pedestrian noise.

     

    Contractor Offices

    Office Use

    Office Equipment and Furniture

    Low level of pedestrian noise

     

     

     

    Week of 7-18-2022

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Project Site

    Steel Erection

    Truck-mounted telescopic Crane, Various Hand Tools

    Moderate level of vehicle engine, backup warning sounds and pedestrian noise.

     

    Landscape Area between Dundee and Glasgow

     

    Sewer Connection

     

    Mini Excavator, various hand tools

    Moderate level of vehicle and pedestrian noise.  Periodic limited access on road with traffic controlled by flag people. Temporary walkways will be installed using metal plates.  Sewer connection work will continue until the end of July with no noticeable  interruption to service in surrounding areas.

     

    Contractor Parking Area

    Continued parking for contractor and sub-contractors; storage of equipment

    Contractor vehicles

    Low level of vehicle and pedestrian noise.

     

    Contractor Offices

    Office Use

    Office Equipment and Furniture

    Low level of pedestrian noise

     

    Upcoming Anticipated Utility Shutdowns

    The following utility shutdown(s) are anticipated in the weeks to come.  Specific dates are approximations and logistical details are pending approval. Please contact Dexter Galang with any specific questions or concerns at dexter.galang@ucr.edu.

     

    Description

    Location

    Proposed

    Duration & Date

    Potential Impacted Buildings/ Facilities

    None anticipated at this time

    -

    -

    -

  • 950578- STUDENT HEALTH & COUNSELING CENTER CONSTRUCTION ADVISORY #19

    Current Weeks

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Project Site

    Continue installation of concrete wall forms

    Various hand tools, rough terrain fork lift

    Moderate level of vehicle engine, backup warning sounds and pedestrian noise.

     

    Landscape Area between Dundee and Glasgow

     

    Installation of Fencing for sewer connection work

    Various hand tools, Contractor Trucks

    Moderate level of vehicle and pedestrian noise.  Periodic limited access on road with traffic controlled by flag people. Temporary walkways will be installed using metal plates.  Fencing will remain until the end on July.

     

    Landscape Area between Dundee and Glasgow

     

    Sewer Connection

     

    Mini Excavator, various hand tools

    Moderate level of vehicle and pedestrian noise.  Periodic limited access on road with traffic controlled by flag people. Temporary walkways will be installed using metal plates.  Sewer connection work will continue until the end of July with no noticeable  interruption to service in surrounding areas.

     

    East side of Dundee Glasgow Access Road

    Storm Drain Connection

     

    Mini Excavator, various hand tools

    Moderate level of vehicle and pedestrian noise.  Periodic limited access on road with traffic controlled by flag people.

     

    Project Site

    Continue underground utility installation

    Mini Excavator, various hand tools

    Moderate level of vehicle engine and pedestrian noise.

     

    Contractor Parking Area

    Continued parking for contractor and sub-contractors; storage of equipment

    Contractor vehicles

    Low level of vehicle and pedestrian noise.

     

    Contractor Offices

    Office Use

    Office Equipment and Furniture

    Low level of pedestrian noise

     

     

    Week of 7-11-2022

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Project Site

    Concrete wall pour

    Concrete Pumper and Mixer Trucks, Various hand tools

    Moderate level of vehicle engine, backup warning sounds and pedestrian noise.

     

    Landscape Area between Dundee and Glasgow

     

    Sewer Connection

     

    Mini Excavator, various hand tools

    Moderate level of vehicle and pedestrian noise.  Periodic limited access on road with traffic controlled by flag people. Temporary walkways will be installed using metal plates.  Sewer connection work will continue until the end of July with no noticeable  interruption to service in surrounding areas.

     

    Project Site

    Continue underground utility installation

    Mini Excavator, various hand tools

    Moderate level of vehicle engine and pedestrian noise.

     

    Contractor Parking Area

    Continued parking for contractor and sub-contractors; storage of equipment

    Contractor vehicles

    Low level of vehicle and pedestrian noise.

     

    Contractor Offices

    Office Use

    Office Equipment and Furniture

    Low level of pedestrian noise

     

    Upcoming Anticipated Utility Shutdowns

    The following utility shutdown(s) are anticipated in the weeks to come.  Specific dates are approximations and logistical details are pending approval. Please contact Dexter Galang with any specific questions or concerns at dexter.galang@ucr.edu.

     

    Description

    Location

    Proposed

    Duration & Date

    Potential Impacted Buildings/ Facilities

    None anticipated at this time

    -

    -

    -

  • 950578- STUDENT HEALTH & COUNSELING CENTER CONSTRUCTION ADVISORY #18

    Current Weeks

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Project Site

    Continue shotcrete installation

    Shotcrete Gun, Air Compressor, Concrete Pump, Concrete Mixer Truck, various hand tools

    Increased truck traffic along Linden from concrete truck deliveries.

    Continual hum of pump and air compressor during shotcrete shoots starting at 7:00 AM through the early afternoon.

     

    Project Site

    Continue underground utility installation

    Mini Excavator, various hand tools

    Moderate level of vehicle engine and pedestrian noise.

     

    Contractor Parking Area

    Continued parking for contractor and sub-contractors; storage of equipment

    Contractor vehicles

    Low level of vehicle and pedestrian noise.

     

    Contractor Offices

    Office Use

    Office Equipment and Furniture

    Low level of pedestrian noise

     

     

    Week of 6-27-2022

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Project Site

    Continue shotcrete installation

    Shotcrete Gun, Air Compressor, Concrete Pump, Concrete Mixer Truck, various hand tools

    Increased truck traffic along Linden from concrete truck deliveries.

    Continual hum of pump and air compressor during shotcrete shoots starting at 7:00 AM through the early afternoon.

     

    Project Site

    Remove concrete wall forms

    Mini Excavator, various hand tools

    Moderate level of vehicle engine, backup warning sounds and pedestrian noise.

     

    Project Site

    Continue underground utility installation

    Mini Excavator, various hand tools

    Moderate level of vehicle engine, backup warning sounds and pedestrian noise.

     

    Contractor Parking Area

    Continued parking for contractor and sub-contractors; storage of equipment

    Contractor vehicles

    Low level of vehicle and pedestrian noise.

     

    Contractor Offices

    Office Use

    Office Equipment and Furniture

    Low level of pedestrian noise

     

    Upcoming Anticipated Utility Shutdowns

    The following utility shutdown(s) are anticipated in the weeks to come.  Specific dates are approximations and logistical details are pending approval. Please contact Dexter Galang with any specific questions or concerns at dexter.galang@ucr.edu.

     

    Description

    Location

    Proposed

    Duration & Date

    Potential Impacted Buildings/ Facilities

    None anticipated at this time

    -

    -

    -

     

    Biweekly Neighborhood Meetings are scheduled every other Mondays at 2:00 pm where construction impacts to the adjacent areas are discussed and how those issues can be addressed or mitigated.  If you would like to be added to the list of attendees, or if you would like us to include additional attendees, please respond to this email with the required contact information.

     

  • 950578- STUDENT HEALTH & COUNSELING CENTER CONSTRUCTION ADVISORY #17

    Current Weeks

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Project Site

    Concrete wall form installation

    Rough Terrain Forklift, & various hand tools

    Moderate level of sustained construction noise primarily comprised of running motors and backup alarms.

    Occasional increased slow traffic due to truck deliveries.

    Sidewalk will be open but alternate paths are encouraged.

     

    Project Site

    Concrete Wall Pour

    Concrete Pump, Concrete Mixer Truck, various hand tools

    Increased truck traffic along Linden from concrete truck deliveries.

     

     

    Project Site

    Underground utility installation

    Mini Excavator, various hand tools

    Moderate level of vehicle engine and pedestrian noise.

     

    Contractor Parking Area

    Continued parking for contractor and sub-contractors; storage of equipment

    Contractor vehicles

    Low level of vehicle and pedestrian noise.

     

    Contractor Offices

    Office Use

    Office Equipment and Furniture

    Low level of pedestrian noise

     

     

    Week of 6-27-2022

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Project Site

    Continue concrete wall form installation

    Rough Terrain Forklift, & various hand tools

    Moderate level of sustained construction noise primarily comprised of running motors and backup alarms.

    Occasional increased slow traffic due to truck deliveries.

    Sidewalk will be open but alternate paths are encouraged.

     

    Project Site

    Continue shotcrete installation

    Shotcrete Gun, Air Compressor, Concrete Pump, Concrete Mixer Truck, various hand tools

    Increased truck traffic along Linden from concrete truck deliveries.

    Continual hum of pump and air compressor during shotcrete shoots starting at 7:00 AM through the early afternoon.

     

    Project Site

    Continue underground utility installation

    Mini Excavator, various hand tools

    Moderate level of vehicle engine and pedestrian noise.

     

    Contractor Parking Area

    Continued parking for contractor and sub-contractors; storage of equipment

    Contractor vehicles

    Low level of vehicle and pedestrian noise.

     

    Contractor Offices

    Office Use

    Office Equipment and Furniture

    Low level of pedestrian noise

     

    Upcoming Anticipated Utility Shutdowns

    The following utility shutdown(s) are anticipated in the weeks to come.  Specific dates are approximations and logistical details are pending approval. Please contact Dexter Galang with any specific questions or concerns at dexter.galang@ucr.edu.

     

    Description

    Location

    Proposed

    Duration & Date

    Potential Impacted Buildings/ Facilities

    None anticipated at this time

    -

    -

    -

  • 950578- STUDENT HEALTH & COUNSELING CENTER CONSTRUCTION ADVISORY #16

    Current Weeks

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Project Site

    Concrete wall form installation

    Rough Terrain Forklift, & various hand tools

    Moderate level of sustained construction noise primarily comprised of running motors and backup alarms.

    Occasional increased slow traffic due to truck deliveries.

    Sidewalk will be open but alternate paths are encouraged.

     

    Project Site

    Shotcrete installation

    Shotcrete Gun, Air Compressor, Concrete Pump, Concrete Mixer Truck, various hand tools

    Increased truck traffic along Linden from concrete truck deliveries.

    Continual hum of pump and air compressor during shotcrete shoots starting at 7:00 AM through the early afternoon.

     

    Contractor Parking Area

    Continued parking for contractor and sub-contractors; storage of equipment

    Contractor vehicles

    Low level of vehicle and pedestrian noise.

     

    Contractor Offices

    Office Use

    Office Equipment and Furniture

    Low level of pedestrian noise

     

     

    Week of 6-13-2022

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Project Site

    Concrete wall form installation

    Rough Terrain Forklift, & various hand tools

    Moderate level of sustained construction noise primarily comprised of running motors and backup alarms.

    Occasional increased slow traffic due to truck deliveries.

    Sidewalk will be open but alternate paths are encouraged.

     

    Project Site

    Shotcrete installation

    Shotcrete Gun, Air Compressor, Concrete Pump, Concrete Mixer Truck, various hand tools

    Increased truck traffic along Linden from concrete truck deliveries.

    Continual hum of pump and air compressor during shotcrete shoots starting at 7:00 AM through the early afternoon.

     

    Dundee-Glasgow Access Road at Linden

    Utility Shutdown: Domestic water connection

    Contractor Work Trucks

    On June 17 from 7am to 5pm, one lane of Dundee- Glasgow access road will be closed.  During this time, access to and from Linden to Glasgow Dining Hall will be controlled by flag people.

     

    Pentland Hills Residence Halls,

    Building I, J, K and L

     

    Utility Shutdown: Domestic water connection

    Contractor Work Trucks

    Pentland Hills Residence Halls,

    Building I, J, K and L will be without water for 10 hours on June 17 from 7am to 5pm.

    Contractor Parking Area

    Continued parking for contractor and sub-contractors; storage of equipment

    Contractor vehicles

    Low level of vehicle and pedestrian noise.

     

    Contractor Offices

    Office Use

    Office Equipment and Furniture

    Low level of pedestrian noise

     

     

    Upcoming Anticipated Utility Shutdowns

    The following utility shutdown(s) are anticipated in the weeks to come.  Specific dates are approximations and logistical details are pending approval. Please contact Dexter Galang with any specific questions or concerns at dexter.galang@ucr.edu.

     

    Description

    Location

    Proposed

    Duration & Date

    Potential Impacted Buildings/ Facilities

    Sewer connection

    Landscape area between Dundee and Glasgow

    Date: N/A

    This work will not result in a utility shutdown as originally anticipated.  Sewer service will remain operational during construction.

     

     

  • 950578- STUDENT HEALTH & COUNSELING CENTER CONSTRUCTION ADVISORY #15

    950578- STUDENT HEALTH & COUNSELING CENTER CONSTRUCTION ADVISORY #15

    Current Weeks

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Project Site

    Continued foundation concrete forms and rebar installation

    Rough Terrain Forklift, Excavator, semi-trucks, backhoe, loader, grader, & various hand tools

    Moderate level of sustained construction noise primarily comprised of running motors and backup alarms.

    Occasional increased slow traffic due to truck deliveries.

    Sidewalk will be open but alternate paths are encouraged.

    Project Site

    Continued foundation concrete pouring

    Concrete Pumper Truck, Concrete Mixer Truck, various hand tools

    Increased truck traffic along Linden from concrete truck deliveries.

    Continual hum and clanging during pours from concrete pump and mixing trucks starting at 7:00 AM through the early afternoon.

     

    Contractor Parking Area

    Continued parking for contractor and sub-contractors; storage of equipment

    Contractor vehicles

    Low level of vehicle and pedestrian noise.

     

    Contractor Offices

    Office Use

    Office Equipment and Furniture

    Low level of pedestrian noise

     

     

    Week of 6-6-2022

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Project Site

    Continued foundation concrete forms and rebar installation

    Rough Terrain Forklift, Excavator, semi-trucks, backhoe, loader, grader, & various hand tools

    Moderate level of sustained construction noise primarily comprised of running motors and backup alarms.

    Occasional increased slow traffic due to truck deliveries.

    Sidewalk will be open but alternate paths are encouraged.

     

    Project Site

    Continued foundation concrete pouring

    Concrete Pumper Truck, Concrete Mixer Truck, various hand tools

    Increased truck traffic along Linden from concrete truck deliveries.

    Continual hum and clanging during pours from concrete pump and mixing trucks starting at 7:00 AM through the early afternoon.

     

    Contractor Parking Area

    Continued parking for contractor and sub-contractors; storage of equipment

    Contractor vehicles

    Low level of vehicle and pedestrian noise.

     

    Contractor Offices

    Office Use

    Office Equipment and Furniture

    Low level of pedestrian noise

     

    Upcoming Anticipated Utility Shutdowns

    The following utility shutdown(s) are anticipated in the weeks to come.  Specific dates are approximations and logistical details are pending approval. Please contact Dexter Galang with any specific questions or concerns at dexter.galang@ucr.edu.

     

    Description

    Location

    Proposed

    Duration & Date

    Potential Impacted Buildings/ Facilities

    Domestic water connection

    Pentland Hills Residence Halls,

    Building I, J, K and L

    Duration: 8 hours

    Dates: Friday, June 17

    Pentland Hills Residence Halls,

    Building I, J, K and L will likely be without water for 8 hours;

    Domestic water connection

    Dundee access road at Linden

    Dates:

    Monday, June 13 to

    Friday, June 17

    Periodically, one lane of Dundee- Glasgow access road will be closed.  During that time, access to and from Linden to Glasgow Dining Hall will be controlled by flag people.

     

    Sewer connection

    Landscape area between Dundee and Glasgow

    Duration: TBD

    Date: TDB

    Details of this utility shutdown are in progress.  Please reach out to Dexter Galang at dexter.galang@ucr.edu with any concerns or questions.

     

  • 950578- STUDENT HEALTH & COUNSELING CENTER CONSTRUCTION ADVISORY #14

    Current Weeks

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Project Site

    Continued foundation concrete forms and rebar installation

    Excavator, semi-trucks, backhoe, loader, grader, & various hand tools

    Moderate level of sustained construction noise primarily comprised of running motors and backup alarms.

    Occasional increased slow traffic due to truck deliveries.

    Sidewalk will be open but alternate paths are encouraged.

    Project Site

    Continued foundation concrete pouring

    Concrete pumper truck, Concrete Mixer Truck, various hand tools

    Increased truck traffic along Linden from concrete truck deliveries.

    Continual hum and clanging during pours from concrete pump and mixing trucks starting at 7:00 AM through the early afternoon.

     

    Contractor Parking Area

    Continued parking for contractor and sub-contractors; storage of equipment

    Contractor vehicles

    Low level of vehicle and pedestrian noise.

     

    Contractor Offices

    Office Use

    Office Equipment and Furniture

    Low level of pedestrian noise

     

     

    Week of 5-30-2022

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Project Site

    Continued foundation concrete forms and rebar installation

    Excavator, semi-trucks, backhoe, loader, grader, & various hand tools

    Moderate level of sustained construction noise primarily comprised of running motors and backup alarms.

    Occasional increased slow traffic due to truck deliveries.

    Sidewalk will be open but alternate paths are encouraged.

     

    Project Site

    Continued foundation concrete pouring

    Concrete pumper truck, Concrete Mixer Truck, various hand tools

    Increased truck traffic along Linden from concrete truck deliveries.

    Continual hum and clanging during pours from concrete pump and mixing trucks starting at 7:00 AM through the early afternoon.

     

    Contractor Parking Area

    Continued parking for contractor and sub-contractors; storage of equipment

    Contractor vehicles

    Low level of vehicle and pedestrian noise.

     

    Contractor Offices

    Office Use

    Office Equipment and Furniture

    Low level of pedestrian noise

     

    Upcoming Anticipated Utility Shutdowns

    The following utility shutdown(s) are anticipated in the weeks to come.  Specific dates are approximations and logistical details are pending approval. Please contact Dexter Galang with any specific questions or concerns at dexter.galang@ucr.edu.

     

    Description

    Location

    Proposed

    Duration & Date

    Potential Impacted Buildings/ Facilities

    Domestic water connection

    Dundee access road at Linden and Pentland Hills Residence Halls,

    Building I, J, K and L

    Duration: 8 hours

    Date: Friday, June 17

    Pentland Hills Residence Halls,

    Building I, J, K and L will likely be without water for 8 hours;

    One lane of Dundee- Glasgow access road will be closed.  Traffic will be controlled by flag people.

     

    Sewer connection

    Landscape area between Dundee and Glasgow

    Duration: TBD

    Date: TDB

    Details of this utility shutdown are in progress.  It will also be discussed at the next Biweekly Neighborhood Meeting next Monday, May 30.  Please reach out to Dexter Galang at dexter.galang@ucr.edu with any concerns, questions or if you would like to attend that meeting.

     

  • 950578- STUDENT HEALTH & COUNSELING CENTER CONSTRUCTION ADVISORY #13

    Current Weeks

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Project Site

    Continued foundation excavation and rebar installation

    Excavator, semi-trucks, backhoe, loader, grader, & various hand tools

    Moderate level of sustained construction noise primarily comprised of running motors and backup alarms.

    Occasional increased slow traffic due to truck deliveries.

    Sidewalk will be open but alternate paths are encouraged.

     

    Contractor Parking Area

    Continued parking for contractor and sub-contractors; storage of equipment

     

    Contractor vehicles

    Low level of vehicle and pedestrian noise.

     

     

    Contractor Offices

    Office Use

    Office Equipment and Furniture

     

    Low level of pedestrian noise

     

     

    Week of 5-23-2022

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Project Site

    Continued foundation excavation and rebar installation

    Excavator, semi-trucks, backhoe, loader, grader, & various hand tools

    Moderate level of sustained construction noise primarily comprised of running motors and backup alarms.

    Occasional increased slow traffic due to truck deliveries.

    Sidewalk will be open but alternate paths are encouraged.

    Project Site

    Foundation Concrete Pouring

    Concrete pumper truck, Concrete Mixer Truck, various hand tools

    Increased truck traffic along Linden from concrete truck deliveries.

    Continual hum and clanging during pours from concrete pump and mixing trucks starting at 7:00 AM through the early afternoon.

     

    Dundee-Glasgow Access Road

    Utility Investigation/ potholing

    Vacuum excavator

    One lane of Dundee- Glasgow access road will be closed.  Traffic will be controlled by flag people.

    Contractor Parking Area

    Continued parking for contractor and sub-contractors; storage of equipment

    Contractor vehicles

    Low level of vehicle and pedestrian noise.

     

    Contractor Offices

    Office Use

    Office Equipment and Furniture

    Low level of pedestrian noise

     

    Live Earthcam link available soon!

     

    Upcoming Anticipated Utility Shutdowns

    The following utility shutdown is anticipated in the weeks to come.  Specific dates are approximations and logistical details are pending approval. Please contact Dexter Galang with any specific questions or concerns at dexter.galang@ucr.edu.

     

    Description

    Location

    Proposed

    Duration & Date

    Potential Impacted Buildings/ Facilities

    Domestic water connection

    Dundee access road at Linden and Pentland Hills Residence Halls,

    Building I, J, K and L

    Duration: 8 hours

    Date: Friday, June 17

    Pentland Hills Residence Halls,

    Building I, J, K and L will likely be without water for 8 hours;

    Temporary water option is currently being explored.

    One lane of Dundee- Glasgow access road will be closed.  Traffic will be controlled by flag people.

     

  • 950578- STUDENT HEALTH & COUNSELING CENTER CONSTRUCTION ADVISORY #12

    Please be advised that the following activities will be occurring during the weeks/ dates noted below at the Student Health & Counseling Center (SHCC) project site and surrounding areas during construction work hours (7am to 5pm).  The activities will occur within the areas identified and the contractor will access the Project Site as shown in the map below.

    The Student Health & Counseling Center Building Team recognizes that construction activities will pose inconveniences and disruption to the surrounding neighborhood. We thank you for your continued patience during the construction of this much needed project.

     

     

     

     

    Current Weeks

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Project Site

    Continued foundation excavation and rebar installation

    Excavator, semi-trucks, backhoe, loader, grader, & various hand tools

    Moderate level of sustained construction noise primarily comprised of running motors and backup alarms.

    Occasional increased slow traffic due to truck deliveries.

    Sidewalk will be open but alternate paths are encouraged.

     

    Contractor Parking Area

    Continued parking for contractor and sub-contractors; storage of equipment

     

    Contractor vehicles

    Low level of vehicle and pedestrian noise.

     

     

    Contractor Offices

    Office Use

    Office Equipment and Furniture

     

    Low level of pedestrian noise

     

     

    Week of 5-16-2022

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Project Site

    Continued foundation excavation and rebar installation

    Excavator, semi-trucks, backhoe, loader, grader, & various hand tools

    Moderate level of sustained construction noise primarily comprised of running motors and backup alarms.

    Occasional increased slow traffic due to truck deliveries.

    Sidewalk will be open but alternate paths are encouraged.

    Dundee Access Road

    Utility Investigation/ potholing

    Vacuum excavator

    Limited access of Dundee Access Road

    Contractor Parking Area

    Continued parking for contractor and sub-contractors; storage of equipment

    Contractor vehicles

    Low level of vehicle and pedestrian noise.

     

    Contractor Offices

    Office Use

    Office Equipment and Furniture

    Low level of pedestrian noise

     

    Live Earthcam link available soon!

     

    Upcoming Anticipated Utility Shutdowns

    The following utility shutdown is anticipated in the weeks to come.  Specific dates are approximations and logistical details are pending approval. Please contact Dexter Galang with any specific questions or concerns at dexter.galang@ucr.edu.

     

    Location

    Proposed

    Duration & Date

    Description

    Potential Impacted Buildings/ Facilities

    Dundee access road at Linden

    Duration: 8 hours

    Date: TBD, will occur on a day between June 12 through June 18

    Domestic water connection

    Pentland Hills Residence Halls,

    Building I, J, K and L will likely be without water for 8 hours;

    Limited access through the Dundee Access Road

     

  • 950578- STUDENT HEALTH & COUNSELING CENTER CONSTRUCTION ADVISORY #11

    Current Weeks

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Project Site

    Earthwork & Grading

    Excavator, semi-trucks, backhoe, loader, grader, & various hand tools

    Moderate level of sustained construction noise primarily comprised of running motors and backup alarms.

     

    Sidewalk will be open but alternate paths are encouraged.

     

    Contractor Parking Area

    Continued parking for contractor and sub-contractors; storage of equipment

     

    Contractor vehicles

    Low level of vehicle and pedestrian noise.

     

     

    Contractor Offices

    Office Use

    Office Equipment and Furniture

     

    Low level of pedestrian noise

     

     

    Week of 5-2-2022

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Project Site

    Foundation Excavation

    Excavator, semi-trucks, backhoe, loader, grader, & various hand tools

    Moderate level of sustained construction noise primarily comprised of running motors and backup alarms.

     

    Sidewalk will be open but alternate paths are encouraged.

     

    Linden Street at TAPS Parking Lot

    Temporary Power Installation

    Contractor Vehicles, various hand tools

    Low level of vehicle and pedestrian noise.  Brief traffic disturbances.

     

     

    Contractor Parking Area

    Continued parking for contractor and sub-contractors; storage of equipment

     

    Contractor vehicles

    Low level of vehicle and pedestrian noise.

     

     

    Contractor Offices

    Office Use

    Office Equipment and Furniture

     

    Low level of pedestrian noise

     

    Live Earthcam link available soon!

  • 950578- STUDENT HEALTH & COUNSELING CENTER CONSTRUCTION ADVISORY #10

    Current Weeks

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Project Site

    Earthwork & Grading

    Excavator, semi-trucks, backhoe, loader, grader, & various hand tools

    Moderate level of sustained construction noise primarily comprised of running motors and backup alarms.

     

    Sidewalk will be open but alternate paths are encouraged.

     

    Linden Street, Pentland Way, and South drive lane of remaining Parking Lot 21

    (see plan below)

     

    Earthwork, Grading & Soil Import

    Semi-trucks and Trailers

    Increased traffic during soil import operations anticipated on Friday, 4-15 from 8am to 4pm.

    Street closures not anticipated.

    Staging outside of the jobsite also not anticipated at this point.

    See diagram below for truck route in and out of the project site.

     

    Contractor Parking Area

    Continued parking for contractor and sub-contractors; storage of equipment

     

    Contractor vehicles

    Low level of vehicle and pedestrian noise.

     

     

    Contractor Offices

    Office Use

    Office Equipment and Furniture

     

    Low level of pedestrian noise

     

     

    Week of 4-18-2022

    Construction Activities

     

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Project Site

    Earthwork & Grading

    Excavator, semi-trucks, backhoe, loader, grader, & various hand tools

    Moderate level of sustained construction noise primarily comprised of running motors and backup alarms.

     

    Sidewalk will be open but alternate paths are encouraged.

     

    Linden Street, Pentland Way, and South drive lane of remaining Parking Lot 21

    (see plan below)

     

    Earthwork, Grading & Soil Import

    Semi-trucks and Trailers

    Continued increased traffic during soil import operations anticipated beginning Monday, 4-18 to Friday 4-22 from the hours of 8am to 4pm.

    Street closures not anticipated.

    Staging outside of the jobsite also not anticipated.

    Contractor Parking Area

    Continued parking for contractor and sub-contractors; storage of equipment

     

    Contractor vehicles

    Low level of vehicle and pedestrian noise.

     

     

    Contractor Offices

    Office Use

    Office Equipment and Furniture

     

    Low level of pedestrian noise

  • 950578- STUDENT HEALTH & COUNSELING CENTER CONSTRUCTION ADVISORY #9

    Current Weeks

    Construction Activities

    Location

    Activity

    Equipment Used

    Anticipated Disturbance

    Project Site

    Continue underground utility relocation work within planting area along sidewalk of Linden

    Excavator, backhoe, trencher, & various hand tools

    Moderate level of sustained construction noise primarily comprised of running motors. Sidewalk will be open but alternate paths are encouraged.

     

    Contractor Parking Area

    Continued parking for contractor and sub-contractors; storage of equipment

    Contractor vehicles

    Low level of vehicle and pedestrian noise.