Parking Structure 1
Parking Structure 1 is a four level parking structure and reconfiguration of existing surface parking on Lot 13.
Project Scope:
- Approximately 1,287 (800 net new) parking stalls
- Approximately 104 electric vehicle charging stations
- Parking guidance system
- Bicycle Parking
- Pedestrian and bicycle pathways to campus
- Provisions for future solar panel arrays
- Good Neighbor features (includes a subterranean parking level on the eastern edge of the structure reducing visual impact and overall height; headlight screening; full cut off light fixtures; landscape screening, etc.)
- Parksmart Silver Certification
Project Timeline:
Start:
December 2019
Completed:
Winter 2020
Contact:
Project Manager: Daneca Stevens
tel: (951) 827-2788
Project Manager: John Franklin
tel: (951) 827-1270
Planner: Jaime Engbrecht
tel: (951) 827-2421
Signup for construction updates on this project