Parking Structure 1

Parking Structure 1 is a four level parking structure and reconfiguration of existing surface parking on Lot 13.


Project Scope:

  • Approximately 1,287 (800 net new) parking stalls
  • Approximately 104 electric vehicle charging stations
  • Parking guidance system
  • Bicycle Parking
  • Pedestrian and bicycle pathways to campus
  • Provisions for future solar panel arrays
  • Good Neighbor features (includes a subterranean parking level on the eastern edge of the structure reducing visual impact and overall height; headlight screening; full cut off light fixtures; landscape screening, etc.)
  • Parksmart Silver Certification 

Project Timeline: 

Start:
December 2019


Completed:
Winter 2020


Contact:

Project Manager: Daneca Stevens
tel: (951) 827-2788
Project Manager: John Franklin
tel: (951) 827-1270
Planner: Jaime Engbrecht
tel: (951) 827-2421