Student Success Center Slider

PDC Contacts

Project Manager: Mihai Gavan - 951-827-6959

Planner: Jaime Engbrecht - 951-827-2421

Project Description

  • Approximately 62,000 gross square feet / 42,000 assignable square feet 
  • About 1,000 General Assignment classroom seats in a mix of lecture halls and classrooms 
  • Lecture Hall in the Round (more information here)
  • Informal study/tutoring/mentoring spaces throughout the building
  • Multi-purpose student life spaces: large/ small meeting rooms, student lounge, informal study spaces, multi-purpose rooms
  • Dining venue

Student Success Center

Current Activity

  • Closeout

Next Steps

  • Final Inspection
  • Notice of Completion

Construction Notices

  • See Construction Alerts for current activities

Construction Progress

UC Riverside’s Student Success Center reached an important milestone Friday, Nov. 6 as construction crews placed the top beam on the new building that is less than a year from completion.

A small ceremony was held to mark the occasion with construction workers and a few campus community members signing their names to the steel beam before a crane lifted it to the top of the structure.

The three-story, 62,000-square-foot building will feature a mix of classrooms, small- to large-sized lecture halls, multipurpose rooms, student study areas, meeting rooms, and a student lounge. 

With a seating capacity of 1,100, the new building will provide a significant increase in classroom space to meet the growing campus enrollment and graduation rates in coming years.

In a video celebrating the topping-out ceremony, Chancellor Kim A. Wilcox described the progress as a great moment for the campus. He said the project represents UCR’s long-standing values of education and student growth.

Read More...

“I’m looking forward to having everybody back on campus as soon as this pandemic is over so we can all be in the building and enjoy a brand-new classroom building,” he said.

The project began construction in late 2019 and is expected to be completed by August 2021, said Mihai Gavan, a project manager with the Office of Planning, Design and Construction.

 

Construction Progress Pictures

Temporary Construction Fence Map


The majority of the construction fence has been removed from the site. The Student Success Center and its neighboring buildings are currently not impacted by any temporary construction fence.

Student Success Center Updates

  • 950512 SSC Project Notification #1

    950512 SSC Project Notification #1

     

    Please be advised that the following activities will be occurring from 7:00AM to 5:00PM on the Student Success Center Site and adjacent areas during the week of September 3rd through September 6th. The activities will occur in the areas identified in the attached exhibits.

     

    Underground utility location

    • Locate underground utilities and make visible with removable paint.
    • Pothole designated locations after survey is complete for specific invert elevation determination.

     

    Site survey

    • Opening manholes to get bottom of tunnel elevations, bottom of vault elevation, tracing elevations.
    • Working with equipment to obtain topographic elevations of existing grades.
    • Survey and identify existing utilities, trees, landscape planter areas, walkways, benches, existing buildings, existing walls, fire lanes, etc..
    • Survey team will be a crew of two.

     

    Boring samples

    • Provide multiple boring samples at the locations specified in the Proposed Boring Locations Exhibit.

     

    The Inspector of Record and PM team will be overseeing these activities with the required support from our Facilities Services partners.

     

    Our team is not anticipating any impact to the adjacent buildings, occupants or any disruptions to the campus activity.

     

    Thank you!

     

     

     

  • 950512 SSC Project Notification #2

    950512 SSC Project Notification #2

     

    Please be advised that the following activities will be occurring from 6:00AM to 3:00PM on the Student Success Center site and adjacent areas on Monday and Tuesday of next week. The activities will occur in the areas identified in the attached exhibit.

     

    Electrical survey

    • Opening manholes.
    • Confirm locations of existing campus infrastructure.

     

    Underground utility location

    • Locate underground utilities and make visible with removable paint.
    • Pothole/trench designated locations for specific invert elevation determination and location confirmation.

     

    The Inspector of Record and PM team will be overseeing these activities with the required support from our Facilities Services partners.

     

    Our team is not anticipating any impact to the adjacent buildings, occupants or any major disruptions to the campus activity.

     

    Thank you!

    UCR SSC Addtl Locating and Potholing
  • 950512 SSC Construction Alert #1

    950512 SSC Construction Alert #1

    Please be advised that the following activities will be occurring from 6:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of November 18th through November 22nd.

    • Site fence installation (equipment: flatbed truck and trailer, air compressor);
    • Live feed camera installation (equipment: truck, ladders);
    • Site office trailer delivery and installation (equipment: truck, air compressors, screw guns, hammers, skil-saw, ladders);
    • Site control survey (equipment: truck, total station, hammers);
    • Selective site demo (equipment: concrete saw, jackhammer, skid steer, dump truck, vibra plates, shovels).
    MAP edited - MR Phase

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • 950512 SSC Construction Alert #2

    950512 SSC Construction Alert #2

    Please be advised that the following activities will be occurring from 6:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of November 25th through November 29th.

    • Material and equipment deliveries (equipment: trucks and trailers, forklift);
    • Concrete sawcut and removal (equipment: gas powered saw, large vacuum);
    • Site and utilities excavation (equipment: backhoe);
    • Stormwater Pollution Prevention Plan (SWPPP) installation (equipment: delivery truck, forklift, tractor);
    • Trailer deck install (equipment: delivery truck, hammers, screw guns);
    • Generator install (equipment: delivery truck, back up alarm, hammers, screw guns);
    • Selective site demo (equipment: concrete saw, jackhammer, skid steer, dump truck, vibra plates, shovels).

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, boom lifts, scissor lifts, saws, screw guns, and hammers.

    MAP edited - MR Phase

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • 950512 SSC Construction Alert #3

    950512 SSC Construction Alert #3

    Please be advised that the following activities will be occurring from 6:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of December 2nd through December 6th:

    • Material and equipment deliveries (equipment: trucks and trailers, forklift);
    • Concrete sawcut and removal (equipment: truck, tractor, gas powered saw, jack hammer, large vacuum);
    • Site and utilities excavation (equipment: backhoe);
    • Trailer deck install and furniture deliveries (equipment: delivery truck, hammers, screw guns);
    • Temporary generator install (equipment: delivery truck, back up alarm, hammers, screw guns);
    • Data wiring and network connection for trailers (equipment: drills).

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • 950512 SSC - Construction Alert #4

    950512 SSC - Construction Alert #4

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of December 9th through December 14th:

    • Material and equipment deliveries (equipment: trucks and trailers, forklift);
    • Form fabrication (equipment: generators, saws, screw guns, hammers);
    • Concrete sawcut and removal – scheduled for early mornings up to 7:00AM (equipment: truck, tractor, gas powered saw, jack hammer, large vacuum);
    • Site and utilities excavation (equipment: backhoe);
    • Selective site demo (equipment: dump truck, dozer, saws, jackhammer, skid steer, vibra plates, shovels);
    • Stormwater Pollution Prevention Plan (SWPPP) installation (equipment: delivery truck, forklift, tractor);
    • Trailer deck install and furniture deliveries (equipment: delivery truck, hammers, screw guns).

    In addition please be advised and reminded that an Electrical Shutdown/Service Interruption is scheduled for December 15th, as shown in the attached notification.

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • 950512 SSC - Construction Alert #5

    950512 SSC Construction Alert #5

    Please be advised that the following activities will be occurring from 5:00AM to 8:00PM on the Student Success Center site and adjacent areas on Saturday December 14th and Sunday, December 15th:

    • Concrete sawcut and removal (equipment: truck, tractor, gas powered saw, jack hammer, vacuum);
    • Utilities excavation – electrical (equipment: backhoe);
    • Electrical Shutdown/Service Interruption is scheduled for December 15th, as shown in the attached notification.

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of December 16th through December 21st:

    • Material and equipment deliveries (equipment: trucks and trailers, forklift);
    • New temporary fence installation for sewer connection along Arts Mall – see revised map below and attached drawing (equipment: flatbed truck and trailer, air compressor). The pathways going East-West will be impacted at times in the new temporary fence areas as required to get the areas ready for the work;
    • Form fabrication (equipment: generators, saws, screw guns, hammers);
    • Concrete sawcut and removal for utilities connection (equipment: truck, tractor, gas powered saw, jack hammer, large vacuum);
    • Site and utilities (electrical, sewer, water, chilled water) excavation (equipment: backhoe);
    • Selective site demo (equipment: dump truck, dozer, saws, jackhammer, skid steer, vibra plates, shovels);
    • Trailer deck install and furniture deliveries (equipment: delivery truck, hammers, screw guns).

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • 950512 SSC - Construction Alert #6

    950512 SSC Construction Alert #6

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas on Saturday December 21st:

    • Installation of underground chilled water pipe (equipment: forklift, generators, welding machine);
    • Utilities excavation – sewer line along Arts Mall (equipment: backhoe).

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of December 23rd through December 28th:

    • Material and equipment deliveries (equipment: trucks and trailers, forklift);
    • Modified temporary fence for sewer connection along Arts Mall – see revised map below. The pathways going East-West will be impacted at times in the new temporary fence areas as required to get the areas ready for the work;
    • Concrete sawcut and removal (equipment: truck, tractor, gas powered saw, jack hammer, large vacuum);
    • Site and utilities (electrical, sewer, water, chilled water) excavation (equipment: backhoe);
    • Pipe installation (equipment: forklift, gas and electric saws);
    • Selective site demo (equipment: dump truck, dozer, saws, jackhammer, skid steer, vibra plates, shovels);
    • Trailer deck install (equipment: delivery truck, hammers, skill saws, screw guns).

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

     

  • 950512 SSC - Construction Alert #7

    950512 SSC Construction Alert #7

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas on Saturday December 28th and Sunday December 29th:

    • Selective site demo (equipment: dump truck, dozer, saws, jackhammer, skid steer, vibra plates, shovels);
    • Installation of underground pipe for the high voltage (equipment: forklift, backhoe, generators);
    • Utilities excavation – sewer line along Arts Mall (equipment: backhoe);
    • Installation of underground pipe for sewer connection (equipment: backhoe, vibra plates, shovels, generators).

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of December 30th through January 4th:

    • Material and equipment deliveries (equipment: trucks and trailers, forklift);
    • Modified temporary fence for sewer connection along Arts Mall – see revised map below. The pathways going East-West will be impacted at times in the new temporary fence areas as required to get the areas ready for the work;
    • Temporary construction access road mobilization (equipment: trucks, jack hammer);
    • Concrete sawcut and removal (equipment: truck, tractor, gas powered saw, jack hammer, large vacuum);
    • Site and utilities (electrical, sewer, water, chilled water) excavation (equipment: dump truck, backhoe);
    • Utility pipe installation (equipment: forklift, welding machines, generators, gas and electric saws);
    • Selective site demo (equipment: dump truck, dozer, saws, jackhammer, skid steer, vibra plates, shovels);
    • Trailer deck install (equipment: delivery truck, hammers, skill saws, screw guns).

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • 950512 SSC - Construction Alert #8

    950512 SSC Construction Alert #8

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas on Saturday January 4th:

    • Temporary construction access road (equipment: trucks, jack hammer);
    • Excavation and installation of underground pipe for the high voltage (equipment: forklift, backhoe, generators).

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of January 6th through January 11th:

    • Material and equipment deliveries (equipment: trucks and trailers, forklift);
    • Modified temporary fence for sewer connection along Arts Mall – see revised map below. The pathways going East-West will be impacted at times in the new temporary fence areas as required to get the areas ready for the work;
    • Form fabrication (equipment: generators, saws, screw guns, hammers);
    • Concrete sawcut and removal (equipment: truck, tractor, gas powered saw, jack hammer, large vacuum);
    • Site and utilities (electrical, sewer, water, chilled water) excavation and backfill (equipment: dump truck, backhoe);
    • Utility pipe installation (equipment: forklift, welding machines, generators, gas and electric saws);
    • Selective site demo (equipment: dump truck, dozer, saws, jackhammer, skid steer, vibra plates, shovels).

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

     

  • 950512 SSC - Construction Alert #9

    950512 SSC Construction Alert #9

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas on Saturday January 11th:

    • Backfill of utility trenches (equipment: slurry trucks, backhoe, compactor);
    • Excavation for the high voltage (equipment: forklift, backhoe, generators).

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of January 13th through January 18th:

    • Material and equipment deliveries (equipment: trucks and trailers, forklift);
    • Modified temporary fence for sewer connection along Arts Mall – see revised map below. The pathways going East-West will be impacted at times in the new temporary fence areas as required to get the areas ready for the work;
    • Concrete sawcut and removal (equipment: truck, tractor, gas powered saw, jack hammer, large vacuum);
    • Form fabrication (equipment: generators, saws, screw guns, hammers);
    • Site and utilities (electrical, sewer, water, chilled water) excavation and backfill (equipment: dump truck, backhoe);
    • Utility pipe installation (equipment: forklift, welding machines, generators, gas and electric saws).

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • 950512 SSC - Construction Alert #10

    950512 SSC Construction Alert #10

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of January 20th through January 25th:

    • Material and equipment deliveries (equipment: trucks and trailers, forklift);
    • Modified temporary fence for sewer connection along Arts Mall – see revised map below. The pathways going East-West will be impacted at times in the new temporary fence areas as required to get the areas ready for the work;
    • Concrete sawcut and removal (equipment: truck, tractor, gas powered saw, jack hammer, large vacuum);
    • Form fabrication (equipment: generators, saws, screw guns, hammers);
    • Site and utilities (electrical, sewer, water, chilled water) excavation and backfill (equipment: dump truck, compactor, tractor, backhoe);
    • Utility pipe installation (equipment: concrete trucks, backhoe, forklift, welding machines, generators, gas and electric saws).

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • 950512 SSC - Construction Alert #11

    950512 SSC Construction Alert #11

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas on Saturday January 25th:

    • Backfill of utility trenches (equipment: slurry trucks, backhoe, compactor);
    • Form work for V-4D 12kV electrical vault (equipment: generators, saws, screw guns, hammers).

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of January 27th through February 1st:

    • Material and equipment deliveries (equipment: trucks and trailers, forklift);
    • Backfill of utility trenches (equipment: backhoe, compactor);
    • Modified temporary fence for sewer connection along Arts Mall – see revised map below. The pathways going East-West will be impacted at times in the new temporary fence areas as required to get the areas ready for the work;
    • Concrete demo and removal (equipment: truck, tractor, gas powered saw, jack hammer, large vacuum);
    • Vault construction (equipment: concrete trucks, forklifts, generators, saws, screw guns, hammers);
    • Form fabrication and stem walls (equipment: generators, saws, screw guns, hammers);
    • Over excavation (equipment: excavator, skip loader, compactor). This activity will generate vibration as we detailed in neighborhood meeting this week.

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • 950512 SSC - Construction Alert #12

    950512 SSC Construction Alert #12

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas on Saturday February 1st:

    • Excavation and conduit installation at the new high voltage 12kV switches (equipment: excavator, forklift, compactor, screw guns);
    • Spoils removal (equipment: backhoe, dump truck).

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of February 3rd through February 8th:

    • Material deliveries (equipment: trucks and trailers, forklift);
    • Removal of domestic water pipe (equipment: excavator);
    • Strip concrete vault (equipment: forklift, hammers, saws, drills);
    • Backfill of utility trenches (equipment: tractor, backhoe, compactor);
    • Conduit installation and encasement (equipment: concrete truck, backhoe, forklift, saws, hammers);
    • Storm drain installation (equipment: backhoe, saws);
    • Form fabrication and stem walls (equipment: generators, saws, screw guns, hammers);
    • Pad and over excavation (equipment: excavator, skip loader, compactor). This activity will generate vibration;
    • Modified temporary fence for sewer connection along Arts Mall – see revised map below. The pathways going East-West will be impacted at times in the new temporary fence areas as required to get the areas ready for the work.

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • 950512 SSC - Construction Alert #13

    950512 SSC Construction Alert #13

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas on Saturday February 8th:

    • Electric cable installation and backfill at the new high voltage switches (equipment: excavator, forklift, compactor, delivery truck, cable puller, screw guns);
    • Spoils removal (equipment: backhoe, dump truck).

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of February 10th through February 15th:

    • Material deliveries (equipment: trucks and trailers, forklift);
    • Backfill of utility trenches (equipment: tractor, backhoe, compactor);
    • Electric cable installation and conduit encasement (equipment: delivery truck, cable puller, concrete truck, backhoe, forklift, saws, hammers);
    • Storm drain installation (equipment: backhoe, saws);
    • Form fabrication and stem walls (equipment: generators, saws, screw guns, hammers);
    • Over excavation and compaction (equipment: excavator, skip loader, compactor). This activity will generate vibration;
    • Concrete removal (equipment: dump truck, concrete saws, jackhammers);
    • Concrete placement (equipment: concrete truck);
    • Modified temporary fence for sewer connection along Arts Mall – see revised map below. The pathways going East-West will be impacted at times in the new temporary fence areas as required to get the areas ready for the work;
    • Proposed power shutdown / interruption on Saturday, February 15 – see attached Notification.

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • 950512 SSC - Construction Alert #14

    950512 SSC Construction Alert #14

    Please be advised that the following activities will be occurring from 5:00AM to 7:00PM on the Student Success Center site and adjacent areas on Saturday February 15th:

    • Planned power shutdown / interruption on Saturday, February 15 – see attached Reminder Notification;
    • Electrical work related to the high voltage connections.

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of February 17th through February 22nd:

    • Material deliveries (equipment: trucks and trailers, forklift);
    • Backfill at utility tunnel (equipment: tractor, backhoe, compactor);
    • Communication conduit installation at tunnel (equipment: backhoe, concrete truck, core drilling machine);
    • Storm drain installation (equipment: backhoe, skid steer loader);
    • Form fabrication and placing (equipment: generators, saws, screw guns, hammers);
    • Excavation and compaction (equipment: excavator, skip loader, compactor). This activity will generate vibration to the surrounding buildings;
    • Excavate footings (equipment: backhoe);
    • Modification of temporary fence along Arts Mall.

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • 950512 SSC - Construction Alert #15

    950512 SSC Construction Alert #15

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of February 24th through February 29th:

    • Material deliveries (equipment: trucks and trailers, forklift);
    • Backfill at utility tunnel (equipment: tractor, backhoe, compactor);
    • Excavate footings (equipment: backhoe, skip loader);
    • Form fabrication and placing (equipment: generators, saws, screw guns, hammers);
    • Excavation and compaction (equipment: excavator, skip loader, compactor). This activity will generate vibration to the surrounding buildings;
    • High voltage concrete encasement demolition (equipment: backhoe, jackhammer). This activity can generate noise and vibration;
    • Rebar delivery and installation (equipment: delivery truck, forklift).

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • 950512 SSC - Construction Alert #16

    950512 SSC Construction Alert #16

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of March 2nd through March 7th:

    • Material deliveries (equipment: trucks and trailers, forklift);
    • Excavate footings (equipment: backhoe, skip loader);
    • Concrete demo (equipment: dump trucks, jackhammers);
    • Backfill (equipment: tractor, backhoe, compactor);
    • Form placing (equipment: forklift, saws, screw guns, hammers);
    • Excavation and compaction (equipment: excavator, skip loader, compactor). This activity will generate vibration to the surrounding buildings;
    • Rebar delivery and installation (equipment: delivery truck, forklift);
    • Concrete placement (equipment: concrete trucks, concrete vibrators).

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • 950512 SSC - Construction Alert #17

    950512 SSC Construction Alert #17

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas on Saturday March 7th:

    • Excavation and compaction (equipment: excavator, front loader, skip loader, compactor). This activity will generate vibration to the surrounding buildings.

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of March 9th through March 14th:

    • Material deliveries (equipment: trucks and trailers, forklift);
    • Excavation and compaction (equipment: excavator, front loader, skip loader, compactor). This activity will generate vibration to the surrounding buildings;
    • Excavate footings (equipment: backhoe, skip loader);
    • Form placing (equipment: forklift, saws, screw guns, hammers);
    • Rebar delivery and installation (equipment: delivery truck, forklift);
    • Underground utilities (equipment: excavator, backhoe).

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • 950512 SSC - Construction Alert #18

    950512 SSC Construction Alert #18

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of March 16th through March 21st:

    • Material deliveries (equipment: trucks and trailers, forklift);
    • Rebar installation (equipment: delivery truck, forklift, torches);
    • Form retaining wall and columns (equipment: forklift, drills, hammers, saws);
    • Waterproof tunnel (equipment: delivery truck, forklift);
    • Concrete placement (equipment: concrete trucks, pump truck, concrete vibrators);
    • Strip forms (equipment: forklift, drills, hammers, saws).

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • 950512 SSC - Construction Alert #19

    950512 SSC Construction Alert #19

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of March 23rd through March 28th:

    • Material deliveries (equipment: trucks and trailers, forklift);
    • Rebar installation (equipment: delivery truck, forklift, torches);
    • Strip forms (equipment: forklift, drills, hammers, saws);
    • Excavate footings (equipment: backhoe, skip loader);
    • Backfill and grading (equipment: front loader, skip loader, compactor);
    • Slurry pour at the chilled water line connection (equipment: concrete trucks).

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • 950512 SSC - Construction Alert #20

    950512 SSC Construction Alert #20

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of March 30th through April 4th:

    • Material deliveries (equipment: trucks and trailers, forklift);
    • Form placing for footings and columns (equipment: forklift, skill saws, hammers, drills);
    • Rebar installation for footings and columns (equipment: delivery truck, forklift, torches);
    • Underground conduit installation (equipment: mini excavator, concrete truck, forklift);
    • Excavate footings (equipment: backhoe, skip loader);
    • Concrete placement for footings, retaining wall and mockups (equipment: concrete trucks, pump truck, concrete vibrators);
    • Backfill (equipment: excavator, front loader, skip loader, compactor).

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • 950512 SSC - Construction Alert #21

    950512 SSC Construction Alert #21

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas on Saturday April 4th:

    • Concrete placement for footings and columns (equipment: concrete trucks, pump truck, concrete vibrators);
    • Backfill (equipment: excavator, front loader, skip loader, compactor).

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of April 6th through April 11th:

    • Material deliveries (equipment: trucks and trailers, forklift);
    • Form placing (equipment: forklift, skill saws, hammers, drills);
    • Rebar deliveries and installation (equipment: delivery truck, forklift, torches);
    • Underground utilities installation (equipment: mini excavator, forklift);
    • Excavate footings (equipment: backhoe, skip loader);
    • Concrete placement for footings, retaining wall and mockups (equipment: concrete trucks, pump truck, concrete vibrators);
    • Backfill (equipment: excavator, front loader, skip loader, compactor).

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • 950512 SSC - Construction Alert #22

    950512 SSC Construction Alert #22

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas on Saturday April 11th:

    • Starter forms installation (equipment: forklift, skill saws, hammers, drills);
    • Reskin form panels (equipment: forklift, skill saws, hammers, drills);
    • Pump rain water from building footprint area (equipment: pumps).

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of April 13th through April 18th:

    • Material deliveries (equipment: trucks and trailers, forklift);
    • Form placing (equipment: forklift, skill saws, hammers, drills);
    • Rebar deliveries and installation (equipment: delivery truck, forklift, torches);
    • Underground utilities installation (equipment: mini excavator, forklift);
    • Dewater footings (equipment: backhoe, pumps);
    • Excavate footings (equipment: backhoe, skip loader);
    • Concrete placement (equipment: concrete trucks, pump truck, concrete vibrators);
    • Building pad grading (equipment: skip loader);
    • Backfill footings and building pad (equipment: excavator, front loader, skip loader, compactor).

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • 950512 SSC - Construction Alert #23

    950512 SSC Construction Alert #23

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas on Saturday April 18th:

    • Concrete pour at elevator pit (equipment: concrete trucks, pump truck, concrete vibrators);
    • Formwork and scaffold brackets (equipment: forklift, skill saws, hammers, drills).

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of April 20th through April 25th:

    • Material deliveries (equipment: trucks and trailers, forklift);
    • Form building and installation (equipment: forklift, skill saws, hammers, drills);
    • Rebar deliveries and installation (equipment: delivery truck, forklift, torches);
    • Underground building utilities piping (equipment: excavator, forklift, compactor);
    • Waterproofing (equipment: powder activated shot gun, screw guns, saws);
    • Footings excavation (equipment: backhoe, skip loader);
    • Concrete placement (equipment: concrete trucks, pump truck, concrete vibrators);
    • Site storm drain piping (equipment: excavator, compactor, saws);
    • Backfill footings and building pad (equipment: excavator, front loader, skip loader, compactor).

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • 950512 SSC - Construction Alert #24

    950512 SSC Construction Alert #24

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas on Saturday April 25th:

    • Form panels installation (equipment: forklift, skill saws, hammers, drills);
    • Rebar installation (equipment: forklift, torches).

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of April 27th through May 2nd:

    • Material deliveries (equipment: trucks and trailers, forklift);
    • Form installation and removal (equipment: forklift, skill saws, hammers, drills);
    • Rebar deliveries and installation (equipment: delivery truck, forklift, torches);
    • Underground building utilities – electrical, plumbing (equipment: excavator, forklift, compactor, saws);
    • Waterproofing (equipment: powder activated shot gun, screw guns, saws);
    • Concrete placement (equipment: concrete trucks, pump truck, concrete vibrators);
    • Site storm drain piping (equipment: excavator, compactor, saws);
    • Backfill footings and building pad (equipment: excavator, front loader, skip loader, compactor);
    • Proposed power shutdown for CHASS INT North and South on Thursday, May 7 – see attached Notification.

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • 950512 SSC - Construction Alert #25

    950512 SSC Construction Alert #25

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of May 4th through May 9th:

    • Material deliveries (equipment: trucks and trailers, forklift);
    • Form installation (equipment: forklift, skill saws, hammers, drills);
    • Excavate footings (equipment: backhoe, skip loader);
    • Rebar deliveries and installation (equipment: delivery truck, forklift, torches);
    • Underground building utilities – electrical, plumbing (equipment: excavator, forklift, compactor, saws);
    • Backfill site storm drain (equipment: excavator, compactor, saws);
    • Backfill footings and building pad (equipment: excavator, front loader, skip loader, compactor);
    • Power shutdown for CHASS INT North and South on Thursday, May 7 – see attached Notification.

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • 950512 SSC - Construction Alert #26

    950512 SSC Construction Alert #26

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas on Saturday May 9th:

    • Form panels installation (equipment: forklift, skill saws, hammers, drills);
    • Rebar installation (equipment: forklift, torches).

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of May 11th through May 16th:

    • Material deliveries (equipment: trucks and trailers, forklift);
    • Form installation (equipment: forklift, skill saws, hammers, drills);
    • Rebar deliveries and installation (equipment: delivery truck, forklift, torches);
    • Concrete placement – walls and columns (equipment: concrete trucks, pump truck, concrete vibrators);
    • Excavate manhole (equipment: concrete truck, backhoe, skip loader);
    • Underground building utilities – electrical, plumbing (equipment: excavator, forklift, compactor, saws);
    • Backfill underground plumbing (equipment: excavator, compactor, saws);
    • Backfill footings and building pad (equipment: excavator, front loader, skip loader, compactor).

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • 950512 SSC - Construction Alert #27

    950512 SSC Construction Alert #27

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas on Saturday May 16th:

    • Form panels installation (equipment: forklift, skill saws, hammers, drills);
    • Subgrade prep (equipment: skip loader, vibratory plate, compactor).

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of May 18th through May 23rd:

    • Material deliveries (equipment: trucks and trailers, forklift);
    • Form installation (equipment: forklift, skill saws, hammers, drills);
    • Rebar installation (equipment: delivery truck, forklift, torches);
    • Strip forms (equipment: crane, hammers, forklift);
    • Concrete placement – walls and columns (equipment: concrete trucks, pump truck, concrete vibrators);
    • Underground building utilities – electrical, plumbing (equipment: mini-excavator, forklift, compactor, saws);
    • Backfill underground utilities (equipment: excavator, compactor, saws);
    • Subgrade prep (equipment: skip loader, vibratory plate, compactor).

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • 950512 SSC - Construction Alert #28

    950512 SSC Construction Alert #28

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas on Saturday May 23rd:

    • Underground building utilities – electrical (equipment: mini-excavator, forklift, compactor, saws);
    • Subgrade prep (equipment: skip loader, vibratory plate, compactor).

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of May 25th through May 30th :

    • Material deliveries (equipment: trucks and trailers, forklift);
    • Rebar delivery and installation (equipment: delivery truck, forklift, torches);
    • Strip forms (equipment: crane, hammers, forklift);
    • Concrete placement – slab on grade (equipment: concrete trucks, pump truck, power finishers);
    • Under slab building utilities – electrical (equipment: mini-excavator, forklift, compactor, saws);
    • Grading (equipment: skip loader, skid steer);
    • Backfill underground utilities and building pad (equipment: excavator, compactor).

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • 950512 SSC Construction Alert #29

    950512 SSC Construction Alert #29

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of June 1st through June 6th:

    • Material deliveries (equipment: trucks and trailers, forklift);
    • Subgrade prep (equipment: skip loader, vibratory plate, compactor);
    • Rebar installation (equipment: delivery truck, forklift, torches);
    • Concrete placement – slab on grade (equipment: concrete trucks, pump truck, power finishers, concrete saws);
    • Level 2 deck forms installation (equipment: crane forklift, drills, skill saws, hammers);
    • Inserts, deck sleeves and embeds (equipment: drills, saws, hammers).

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • 950512 SSC Construction Alert #30

    950512 SSC Construction Alert #30

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas on Saturday June 6th:

    • Level 2 deck forms installation (equipment: crane, forklift, drills, skill saws, hammers);

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of June 8th through June 13th:

    • Material deliveries (equipment: trucks and trailers, forklift);
    • Level 2 deck forms installation (equipment: crane, forklift, drills, skill saws, hammers);
    • Level 2 deck rebar installation (equipment: crane, forklift);
    • Inserts, deck sleeves and embeds (equipment: drills, saws, hammers);
    • In slab conduit installation (equipment: forklift, band saw, sawzall, drills);
    • Site grading and export (equipment: dump trucks, mini excavator, skip loader, skid steer, compactors);
    • Reseeding Arts Mall project impacted areas (equipment: delivery trucks, skid steer, tiller).

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • 950512 SSC Construction Alert #31

    950512 SSC Construction Alert #31

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas on Saturday June 13th:

    • Level 2 deck forms installation (equipment: crane, forklift, drills, skill saws, hammers);
    • Level 2 in slab conduit installation (equipment: forklift, band saw, sawzall, drills);
    • Concrete demolition for storm drain on north side (equipment: truck, gas powered saw, jack hammer, vacuum).

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of June 15th through June 20th:

    • Material deliveries (equipment: trucks and trailers, forklift);
    • Level 2 deck, columns and walls – forms installation (equipment: crane, forklift, drills, skill saws, hammers);
    • Level 2 deck, columns and walls – rebar installation (equipment: crane, forklift);
    • Inserts, deck sleeves and embeds (equipment: drills, saws, hammers);
    • In slab conduit installation (equipment: forklift, band saw, sawzall, drills);
    • Level 2 deck concrete placement (equipment: concrete trucks, pump truck, crane);
    • Storm drain connections (equipment: truck, mini excavator, cut off saw).

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • 950512 SSC Construction Alert #32

    950512 SSC Construction Alert #32

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas on Saturday, June 20th:

    • Level 2 deck and walls – forms installation (equipment: crane, forklift, drills, skill saws, hammers).

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of June 22nd through June 27th:

    • Material deliveries (equipment: trucks and trailers, forklift);
    • Level 2 deck, columns and walls – forms installation (equipment: trucks, crane, forklift, drills, skill saws, hammers);
    • Level 2 deck, beams, vertical columns and walls – rebar installation (equipment: crane, forklift, hammers);
    • Inserts, deck sleeves and embeds (equipment: lasers, drills, saws, hammers);
    • Column installation – SW corner (equipment: truck, forklift, roto-hammers, hammers, welding machines);
    • Embed installation (equipment: crane, forklift, hammers, drills).

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • 950512 SSC Construction Alert #33

    950512 SSC Construction Alert #33

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas on Saturday, June 27th:

    Level 2

    • Shear walls – rebar installation (equipment: crane, forklift, drills, skill saws, hammers);
    • In slab electrical rough in (equipment: lasers, drills, saws, hammers).

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of June 29th through July 4th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift).

    Level 2

    • Columns and shear walls – rebar installation (equipment: crane, forklift, hammers);
    • Columns and shear walls – forms installation (equipment: trucks, crane, forklift, drills, skill saws, hammers);
    • Deck, shear walls and columns – concrete placement (equipment: concrete trucks, pump truck, crane);
    • Strip deck forms – West area (equipment: forklift, drills, hammers);
    • Strip shear walls and column forms (equipment: crane, forklift, drills, hammers).

    Level 3

    • Deck and beam forms – West area (equipment: crane, forklift, hammers, drills, skill saws).

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #34

    950512 SSC Construction Alert #34

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of July 6th through July 11th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift).

    Level 2

    • Columns and shear walls – rebar installation (equipment: crane, forklift, hammers);
    • Columns and shear walls – forms installation (equipment: trucks, crane, forklift, drills, skill saws, hammers);
    • Columns and shear walls – concrete placement (equipment: concrete trucks, pump truck, crane);
    • Strip shear walls and column forms (equipment: crane, forklift, drills, hammers).

    Level 3

    • Deck forms – West area (equipment: crane, forklift, hammers, drills, skill saws).

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #35

    950512 SSC Construction Alert #35

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of July 13th through July 18th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift).

    Level 2

    • Strip shear walls and column forms (equipment: crane, forklift, drills, hammers).

    Level 3

    • Deck forms installation (equipment: crane, forklift, hammers, drills, skill saws);
    • Deck, columns and shear walls – rebar installation (equipment: crane, forklift, hammers);
    • Inserts, deck sleeves and embeds (equipment: crane, forklift, drills, saws, hammers);
    • In slab rough ins (equipment: drills, hammers);
    • Access stair install (equipment: crane, forklift, drills, saws, hammers).

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #36

    950512 SSC Construction Alert #36

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas on Saturday, July 18th:

    Fence Line Plans for Alternates

    South Road Fence Line

          Level 2

    • Strip deck forms (equipment: crane, forklift, scissor lifts, drills, hammers).

    Level 3

    • Deck forms installation (equipment: crane, forklift, scissor lifts, hammers, drills, skill saws);
    • In slab electrical rough in (equipment: lasers, drills, saws, hammers).

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of July 20th through July 25th:

           General

    • Material deliveries (equipment: trucks and trailers, forklift).

    Level 1

    • Strip deck forms (equipment: crane, forklift, scissor lifts, drills, hammers).

    Level 2

    • Strip shear walls and column forms (equipment: crane, forklift, scissor lifts, drills, hammers).

    Level 3

    • Deck forms installation (equipment: crane, forklift, hammers, drills, skill saws);
    • Deck, columns and shear walls – rebar installation (equipment: crane, forklift, hammers);
    • In slab rough ins (equipment: drills, hammers);
    • Concrete placement – West Deck (equipment: concrete trucks, pump truck, crane).

    In addition, please be advised that we will be starting on some of the site work outside of the current fence line boundary. The upcoming site work is projected to start end of July and projected to last through September. We are currently working with the Swinerton team on a proposed fence plan that has not been approved yet by our project management team. I am attaching a draft of this document so that you are aware of the impact, but will share the final version as part of future construction alerts and also in our neighborhood meeting next week. Below are some of the expected activities that will be part of the work related to Alternate 1 & 2 as well as some of the future fire lane work at the south entry and the west.

    • Temporary Fence
    • Landscape and Hardscape Demo
    • Grading
    • Structural Steel
    • Concrete Sidewalks
    • Concrete Seat Walls
    • Lighting
    • Landscaping

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #37

    950512 SSC Construction Alert #37

    Fence Line Plans for Alternates

    South Road Fence Line

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas on Saturday, July 25th:

           Level 2

    • Strip deck forms (equipment: crane, forklift, scissor lifts, drills, hammers).

    Level 3

    • Deck forms installation (equipment: crane, forklift, scissor lifts, hammers, drills, skill saws);

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of July 27th through August 1st:

        General

    • Material deliveries (equipment: trucks and trailers, forklift).

    Level 1

    • Strip deck forms (equipment: crane, forklift, scissor lifts, drills, hammers).

    Level 2

    • Form stripping (equipment: crane, forklift, scissor lifts, drills, hammers).

    Level 3

    • Concrete placement – West Deck (equipment: concrete trucks, pump truck, crane);
    • Deck forms installation (equipment: crane, forklift, hammers, drills, skill saws);
    • Deck, columns and shear walls – rebar installation (equipment: crane, forklift, hammers);
    • Columns and shear walls – forms installation (equipment: trucks, crane, forklift, drills, skill saws, hammers);
    • Inserts, deck sleeves and embeds (equipment: lasers, drills, saws, hammers);
    • In slab rough ins (equipment: drills, hammers).

    In addition, please be advised that we will be starting on some of the site work outside of the current fence line boundary. The upcoming site work is projected to start end of July and projected to last through September. We are currently working with the Swinerton team on the proposed fence plan. I am attaching a draft of this document so that you are aware of the impact and will share if there are any updates. Below are some of the expected activities that will be part of the work related to Alternate 1 & 2 as well as some of the future fire lane work at the south entry and the west.

    • Temporary Fence
    • Landscape and Hardscape Demo
    • Grading
    • Structural Steel
    • Concrete Sidewalks
    • Concrete Seat Walls
    • Lighting
    • Landscaping

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #38

    950512 SSC Construction Alert #38

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas on Saturday, August 1st:

    Level 3

    • Columns and shear walls – forms installation (equipment: crane, forklift, scissor lifts, hammers, drills, skill saws);
    • Columns and shear walls – rebar installation (equipment: crane, forklift, hammers).

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of August 3rd through August 8th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift).

    Site

    • Storm drain install – Eastern portion of the site (equipment: truck, backhoe, cut off saw).

    Level 1

    • Form stripping (equipment: crane, forklift, scissor lifts, drills, hammers).

    Level 2

    • Form stripping (equipment: crane, forklift, scissor lifts, drills, hammers).

    Level 3

    • Concrete placement – East deck, columns and shear walls (equipment: concrete trucks, pump truck, crane);
    • Columns and shear walls – rebar installation (equipment: crane, forklift, hammers);
    • Columns and shear walls – forms installation (equipment: trucks, crane, forklift, drills, skill saws, hammers).

    In addition, please be advised that we will be starting on some of the site work outside of the current fence line boundary. The upcoming site work is projected to start beginning of August and projected to last through September. I am attaching the proposed fence plan so that you are aware of the impact and will share any updates as they become available. Below are some of the expected activities that will be part of the work related to Alternate 1 & 2 as well as some of the future fire lane work at the south entry and the west.

    • Temporary Fence
    • Landscape and Hardscape Demo
    • Grading
    • Structural Steel
    • Concrete Sidewalks
    • Concrete Seat Walls
    • Lighting
    • Landscaping

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #39

    950512 SSC Construction Alert #39

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas on Saturday, August 8th:

    Level 1&2

    • Form removal (equipment: crane, forklift, scissor lifts, drills, hammers).

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of August 10th through August 15th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift).

    Level 1

    • Reshore removal (equipment: forklift, scissor lifts, drills, hammers);
    • Framing layout (equipment: roto hammers, chop saws).

    Level 2

    • Form removal (equipment: crane, forklift, scissor lifts, drills, hammers, skill saws).

    Level 3

    • Concrete placement – columns and shear walls (equipment: concrete trucks, pump truck, crane);
    • Columns and shear walls – rebar installation (equipment: crane, forklift, hammers);
    • Columns and shear walls – forms installation (equipment: trucks, crane, forklift, drills, skill saws, hammers).

    Roof

    • Deck forms installation (equipment: crane, forklift, scissor lifts, drills, hammers, skill saws).

    In addition, please be advised that we will be starting on some of the site work outside of the current fence line boundary. I am attaching the proposed fence plan so that you are aware of the impact and will share any updates as they become available. Below are some of the expected activities that will be part of the work related to Alternate 1 & 2 as well as some of the future fire lane work at the south entry and the west.

    • Temporary Fence
    • Landscape and Hardscape Demo
    • Grading
    • Structural Steel
    • Concrete Sidewalks
    • Concrete Seat Walls
    • Lighting
    • Landscaping

    Items listed inred: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #40

    950512 SSC Construction Alert #40

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas on Saturday, August 15th:

    Level 1

    • Reshore removal (equipment: forklift, scissor lifts, drills, hammers).

    Level 3

    • Shear walls – forms installation (equipment: trucks, crane, forklift, drills, skill saws, hammers).

    Roof

    • Deck forms installation (equipment: crane, forklift, scissor lifts, drills, hammers, skill saws).

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of August 17th through August 22nd:

    General

    • Material deliveries (equipment: trucks and trailers, forklift);
    • Formwork removal from site (equipment: trucks, forklift, skill saws).

    Site

    • Water distribution (equipment: truck, backhoe).

    Level 1

    • Reshore removal (equipment: forklift, scissor lifts, drills, hammers);
    • Interior framing (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws);
    • Rough overhead MEPFS (equipment: scissor lifts, drills, hammers);
    • Curbs and housekeeping pads (equipment: concrete trucks, skill saws, drills, hammers).

    Level 2

    • Form removal (equipment: crane, forklift, scissor lifts, drills, hammers, skill saws).

    Level 3

    • Concrete placement – columns and shear walls (equipment: concrete trucks, pump truck, crane);
    • Form removal (equipment: crane, forklift, scissor lifts, drills, hammers, skill saws).

    Roof

    • Deck forms installation (equipment: crane, forklift, scissor lifts, drills, hammers, skill saws).

    In addition, please be advised that we will be starting shortly on some of the site work outside of the current fence line boundary. I am attaching the proposed fence plan so that you are aware of the impact and will share any updates as they become available. Below are some of the expected activities that will be part of the work related to Alternate 1 & 2 as well as some of the future fire lane work at the south entry and the west.

    • Temporary Fence
    • Landscape and Hardscape Demo
    • Grading
    • Structural Steel
    • Concrete Sidewalks
    • Concrete Seat Walls
    • Lighting
    • Landscaping

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #41

    950512 SSC Construction Alert #41

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of August 24th through August 29th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift);
    • Formwork removal from site (equipment: trucks, forklift, skill saws).

    Site

    • Water distribution (equipment: concrete trucks, backhoe, vibratory equipment).

    Level 1

    • Interior framing (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws);
    • Rough-in MEPFS (equipment: scissor lifts, drills, band saws, hammers).

    Level 2

    • Form removal (equipment: crane, forklift, scissor lifts, drills, hammers, skill saws).

    Roof

    • Deck forms installation (equipment: crane, forklift, scissor lifts, drills, hammers, skill saws);
    • Deck rebar installation (equipment: crane, forklift, hammers);
    • Inserts and deck sleeves (equipment: lasers, drills, saws, hammers).

    In addition, please be advised that we will be starting shortly on some of the site work outside of the current fence line boundary. I am attaching the proposed fence plan so that you are aware of the impact and will share any updates as they become available. Below are some of the expected activities that will be part of the work related to Alternate 1 & 2 as well as some of the future fire lane work at the south entry and the west.

    • Temporary Fence
    • Landscape and Hardscape Demo
    • Grading
    • Structural Steel
    • Concrete Sidewalks
    • Concrete Seat Walls
    • Lighting
    • Landscaping

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #42

    950512 SSC Construction Alert #42

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas on Saturday, August 29th:

    Roof

    • Rebar installation (equipment: crane, forklift, hammers).

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of August 31st through September 5th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift);
    • Site demobilization – concrete (equipment: trucks, dumpster exchanges, forklift, skill saws, hammers).

    Site

    • Water distribution (equipment: concrete trucks, backhoe, vibratory equipment).

    Level 1

    • Interior framing (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws);
    • Rough-in MEPFS (equipment: scissor lifts, drills, band saws, hammers).

    Level 2

    • Form removal (equipment: crane, forklift, scissor lifts, drills, hammers, skill saws).

    Roof

    • Form installation – slab and edge (equipment: crane, forklift, scissor lifts, drills, hammers, skill saws);
    • Rebar installation – slab and beams (equipment: crane, forklift, hammers);
    • In slab rough-in (equipment: lasers, drills, saws, hammers);
    • Concrete placement (equipment: concrete trucks, pump truck, crane).

     

    In addition, please be advised that we will be starting shortly on some of the site work outside of the current fence line boundary. I am attaching the proposed fence plan so that you are aware of the impact and will share any updates as they become available. Below are some of the expected activities that will be part of the work related to Alternate 1 & 2 as well as some of the future fire lane work at the south entry and the west.

    • Temporary Fence
    • Landscape and Hardscape Demo
    • Grading
    • Structural Steel
    • Concrete Sidewalks
    • Concrete Seat Walls
    • Lighting
    • Landscaping

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #43

    950512 SSC Construction Alert #43

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of September 8th through September 12th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift);
    • Site demobilization – concrete (equipment: trucks, dumpster exchanges, forklift, skill saws, hammers).

    Site

    • Domestic water connection (equipment: concrete trucks, backhoe, vibratory equipment, saws).

    Level 1

    • Shoring removal (equipment: forklift, scissor lifts, drills, hammers);
    • Interior framing (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws);
    • Curb placement (equipment: concrete trucks, pump truck, hammers, drills);
    • Rough-in MEP (equipment: scissor lifts, drills, band saws, hammers).

    Level 2

    • Reshore removal (equipment: forklift, scissor lifts, drills, hammers);
    • Concrete detailing (equipment: scissor lifts, chipping hammers, vacuums, drills).

    Level 3

    • Form removal (equipment: crane, forklift, scissor lifts, drills, hammers, skill saws).

    Roof

    • Form installation – beams and curbs (equipment: drills, hammers, skill saws)

    In addition, please be advised that we will be starting shortly on some of the site work outside of the current fence line boundary. I am attaching the proposed fence plan so that you are aware of the impact and will share any updates as they become available. Below are some of the expected activities that will be part of the work related to Alternate 1 & 2 as well as some of the future fire lane work at the south entry and the west.

    • Temporary Fence
    • Landscape and Hardscape Demo
    • Grading
    • Structural Steel
    • Concrete Sidewalks
    • Concrete Seat Walls
    • Lighting
    • Landscaping

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #44

    950512 SSC Construction Alert #44

     

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas on Saturday, September 12th:

    Level 3

    • Form removal (equipment: crane, forklift, scissor lifts, drills, hammers, skill saws).

    Roof

    • Form installation – beams and curbs (equipment: drills, hammers, skill saws).

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of September 14th through September 19th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift);
    • Site demobilization – concrete (equipment: trucks, dumpster exchanges, forklift, skill saws, hammers).

    Site

    • Domestic water connection (equipment: concrete trucks, backhoe, vibratory equipment, saws).
    • Form and place material hoist pad (equipment: concrete truck, skill saws, hammers, rebar cutter, vibratory equipment)

    Level 1

    • Interior framing (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws);
    • Rough-in MEP (equipment: scissor lifts, drills, band saws, hammers).

    Level 2

    • Shoring removal (equipment: forklift, scissor lifts, drills, hammers).

    Level 3

    • Form removal (equipment: crane, forklift, scissor lifts, drills, hammers, skill saws).

    Roof

    • Form installation – beams and curbs (equipment: drills, hammers, skill saws);
    • Rebar installation (equipment: hammers, torches, rebar cutters);
    • Concrete placement (equipment: concrete trucks, pump truck, crane).

    In addition, please be advised that we will be starting shortly on some of the site work outside of the current fence line boundary. I am attaching the proposed fence plan so that you are aware of the impact and will share any updates as they become available. Below are some of the expected activities that will be part of the work related to Alternate 1 & 2 as well as some of the future fire lane work at the south entry and the west.

    • Temporary Fence
    • Landscape and Hardscape Demo
    • Grading
    • Structural Steel
    • Concrete Sidewalks
    • Concrete Seat Walls
    • Lighting
    • Landscaping

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #45

    950512 SSC Construction Alert #45

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of September 21st through September 26th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift).

    Site

    • Storm drain - South (equipment: trucks, mini excavator, vibratory equipment, saws);
    • Install material hoist (equipment: crane, trucks, drills, hammers);
    • Install scaffold – North (equipment: trucks, hammers).

    Level 1

    • MEP installation (equipment: scissor lifts, drills, band saws, hammers).

    Level 2

    • Re-shoring removal (equipment: forklift, scissor lifts, drills, hammers);
    • Framing layout (equipment: lasers, drills, hammers, saws).

    Level 3

    • Form removal (equipment: forklift, scissor lifts, drills, hammers, skill saws);
    • Shoring removal (equipment: forklift, scissor lifts, drills, hammers).

    Roof

    • Form removal (equipment: forklift, drills, hammers, skill saws).

    In addition, please be advised that we will be starting shortly on some of the site work outside of the current fence line boundary. I am attaching the proposed fence plan so that you are aware of the impact and will share any updates as they become available. Below are some of the expected activities that will be part of the work related to Alternate 1 & 2 as well as some of the future fire lane work at the south entry and the west.

    • Temporary Fence
    • Landscape and Hardscape Demo
    • Grading
    • Structural Steel
    • Concrete Sidewalks
    • Concrete Seat Walls
    • Lighting
    • Landscaping

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #46

    950512 SSC Construction Alert #46

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas on Saturday, September 26th:

    Site

    • Concrete mock-up wash.

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of September 28th through October 3rd:

    General

    • Material deliveries (equipment: trucks and trailers, forklift).

    Site

    • Site demobilization – concrete (equipment: trucks, dumpster exchanges, forklift, skill saws, hammers);
    • Storm drain - South (equipment: trucks, mini excavator, vibratory equipment, saws);
    • Metal panel and window mock-up installation (equipment: drills, hammers, skill saws).

    Level 1

    • Framing and drywall installation (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws, screw guns);
    • Duct installation (equipment: scissor lifts, drills, band saws, hammers).

    Level 2

    • Framing layout and installation (equipment: lasers, drills, hammers, saws).

    Level 3

    • Shoring removal (equipment: forklift, scissor lifts, drills, hammers).

    Roof

    • Form removal (equipment: forklift, drills, hammers, skill saws).

    In addition, please be advised that we will be starting shortly on some of the site work outside of the current fence line boundary. I am attaching the proposed fence plan so that you are aware of the impact and will share any updates as they become available. Below are some of the expected activities that will be part of the work related to Alternate 1 & 2 as well as some of the future fire lane work at the south entry and the west.

    • Temporary Fence
    • Landscape and Hardscape Demo
    • Grading
    • Structural Steel
    • Concrete Sidewalks
    • Concrete Seat Walls
    • Lighting
    • Landscaping

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #47

    950512 SSC Construction Alert #47

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of October 5th through October 10th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift).

    Site

    • Site demobilization – concrete (equipment: trucks, dumpster exchanges, forklift, skill saws, hammers);
    • Storm drain (equipment: trucks, mini excavator, vibratory equipment, saws);
    • South-West corner stair install (equipment: trucks, forklifts, welders, drills, hammers);
    • New temporary construction fencing layout at Athletics and Student Services courtyard alternates. Please be advised that the construction fencing layout will be updated to incorporate the improvements at the Athletics and Student Services courtyards. The pedestrian paths at CHASS INT S, Athletics and Student Services will be temporary impacted, please see map below.

    Level 1

    • Framing and drywall installation (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws, screw guns);
    • MEP installation (equipment: scissor lifts, drills, band saws, hammers).

    Level 2

    • Framing layout and installation (equipment: lasers, drills, hammers, saws).

    Level 3

    • Shoring removal (equipment: forklift, scissor lifts, drills, hammers).

    Roof

    • Framing penthouse (equipment: drills, hammers, chop saws, screw guns).

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #48

    950512 SSC Construction Alert #48

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas on Saturday, October 10th:

    Site

    • Selective landscape demo – South fire lane and South-West corner (equipment: trucks and trailers, saws).

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of October 12th through October 17th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift).

    Site

    • Site demobilization – concrete (equipment: trucks, dumpster exchanges, forklift, skill saws, hammers);
    • Bio-filter drain pipe install (equipment: mini excavator, skid steer, hammers, gas cutoff saw);
    • Scaffold install (equipment: trucks, forklifts, drills, hammers);
    • South-West corner stair install (equipment: trucks, forklifts, welders, drills, hammers);
    • New temporary construction fencing layout at Athletics and Student Services courtyard alternates. Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards. The pedestrian paths at CHASS INT S, Athletics and Student Services will be temporary impacted, please see map below.

    Level 1

    • Framing and drywall installation (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws, screw guns);
    • MEP installation (equipment: scissor lifts, drills, band saws, hammers).

    Level 2

    • Framing layout and installation (equipment: lasers, drills, hammers, saws);
    • MEPFS rough-ins (equipment: scissor lifts, drills, band saws, hammers).

    Level 3

    • Framing layout and installation (equipment: lasers, drills, hammers, saws);
    • Reshoring removal (equipment: forklift, scissor lifts, drills, hammers).

    Roof

    • Penthouse and parapet framing (equipment: drills, hammers, chop saws, screw guns);
    • Form removal (equipment: skill saws, drills, hammers).

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #49

    950512 SSC Construction Alert #49

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of October 19th through October 24th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift).

    Site

    • Site demobilization – concrete (equipment: trucks, dumpster exchanges, forklift, skill saws, hammers);
    • Site Alternates (Student Services and Athletics courtyards) – demo and grading (equipment: backhoe, skip loader, dump trucks jackhammer);
    • Site Alternates – footings for shade structure (equipment: backhoe, concrete trucks);
    • New temporary construction fencing layout at Athletics and Student Services courtyard alternates. Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards. The pedestrian paths at CHASS INT S, Athletics and Student Services will be temporary impacted, please see map below.

    Level 1

    • Framing and drywall installation (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws, screw guns).

    Level 2

    • Framing layout and installation (equipment: lasers, drills, hammers, saws);
    • MEP in wall and overhead rough-ins (equipment: scissor lifts, drills, band saws, hammers).

    Level 3

    • Framing layout and installation (equipment: lasers, drills, hammers, saws);
    • MEP overhead rough-ins (equipment: scissor lifts, drills, band saws, hammers).

    Roof

    • Parapet framing (equipment: drills, hammers, chop saws, screw guns);
    • Exterior steel (equipment: forklift, skill saws, drills, hammers).

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #50

    950512 SSC Construction Alert #50 (we are 50 today!!)

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of October 26th through October 31st:

    General

    • Material deliveries (equipment: trucks and trailers, forklift).

    Site

    • Site Alternates (Student Services and Athletics courtyards) – demo and grading (equipment: backhoe, skip loader, dump trucks jackhammer);
    • Site Alternates – footings for shade structure (equipment: backhoe, concrete trucks);
    • New temporary construction fencing layout at Athletics and Student Services courtyard alternates. Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards. The pedestrian paths at CHASS INT S, Athletics and Student Services will be temporary impacted, please see map below.

    Level 1

    • Framing and drywall installation (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws, screw guns);
    • Paseo stair installation (equipment: crane, trucks, forklift, scissor lifts, hammers).

    Level 2

    • Framing layout and installation (equipment: lasers, drills, hammers, saws);
    • MEP in wall and overhead rough-ins (equipment: scissor lifts, drills, band saws, hammers).

    Level 3

    • Framing layout and installation (equipment: lasers, drills, hammers, saws);
    • MEP in wall overhead rough-ins (equipment: scissor lifts, drills, band saws, hammers).

    Roof

    • High roof steel structure installation (equipment: crane, trucks, forklift, hammers, screw guns).

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #51

    950512 SSC Construction Alert #51

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of November 2nd through November 7th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift).

    Site

    • Site Alternates (Athletics and Student Services courtyards) – grading (equipment: backhoe, skip loader, vibratory equipment);
    • Site Alternates – footings for shade structure (equipment: backhoe, concrete trucks);
    • New temporary construction fencing layout at Athletics and Student Services courtyard alternates. Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards. The pedestrian paths at CHASS INT S, Athletics and Student Services will be temporary impacted, please see map below.

    Level 1

    • Framing and drywall installation (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws, screw guns);
    • Paseo stair installation (equipment: crane, trucks, forklift, scissor lifts, hammers).

    Level 2

    • Framing layout and installation (equipment: lasers, drills, hammers, saws);
    • MEP rough-ins (equipment: scissor lifts, drills, band saws, hammers);
    • Paseo stair installation (equipment: crane, trucks, forklift, scissor lifts, hammers).

    Level 3

    • Framing layout and installation (equipment: lasers, drills, hammers, saws);
    • MEP rough-ins (equipment: scissor lifts, drills, band saws, hammers).

    Roof

    • High roof steel structure installation (equipment: crane, trucks, forklift, hammers, screw guns).

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #52

    950512 SSC Construction Alert #52

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of November 9th through November 14th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift).

    Site

    • Site Alternates – concrete placement for shade structure footings (equipment: concrete trucks, concrete pump, excavator, vibratory equipment);
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards. The pedestrian paths at CHASS INT S, Athletics and Student Services will be temporary impacted, please see map below.

    Level 1

    • Framing and drywall installation (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws, screw guns);
    • Paseo stair (equipment: saws, grinders, hammers).

    Level 2

    • Framing installation (equipment: scissor lifts, lasers, drills, hammers, saws);
    • MEP rough-ins (equipment: scissor lifts, drills, band saws, hammers);
    • Paseo stair (equipment: saws, grinders, hammers).

    Level 3

    • Framing installation (equipment: scissor lifts, lasers, drills, hammers, saws);
    • MEP rough-ins (equipment: scissor lifts, drills, band saws, hammers).

    Roof

    • High roof steel structure installation (equipment: crane, trucks, forklift, hammers, screw guns);
    • High roof decking ( equipment: scissor lifts, cut off saws, hammers);
    • Parapet framing (equipment: cut off saws grinders, powder actuated tools, drills hammers).

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #53

    950512 SSC Construction Alert #53

    Please be advised that the following activities will be occurring from 5:00AM to 4:00PM on the Student Success Center site and adjacent areas during the week of November 16th through November 21st:

    General

    • Material deliveries (equipment: trucks and trailers, forklift).

    Site

    • Site Alternates – concrete placement for shade structure footings (equipment: concrete trucks, concrete pump, excavator, vibratory equipment);
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards. The pedestrian paths at CHASS INT S, Athletics and Student Services will be temporary impacted, please see map below.

    Level 1

    • Framing and drywall installation (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws, screw guns);
    • Paseo stair (equipment: saws, grinders, hammers).

    Level 2

    • Framing and drywall installation (equipment: scissor lifts, lasers, drills, hammers, saws);
    • MEP rough-ins (equipment: scissor lifts, drills, band saws, hammers);
    • Paseo stair (equipment: saws, grinders, hammers).

    Level 3

    • Framing installation (equipment: scissor lifts, lasers, drills, hammers, saws);
    • MEP rough-ins (equipment: scissor lifts, drills, band saws, hammers).

    Roof

    • High roof steel installation (equipment: crane, trucks, forklift, hammers, screw guns);
    • High roof decking ( equipment: scissor lifts, cut off saws, hammers);
    • Parapet framing (equipment: cut off saws grinders, powder actuated tools, drills hammers).

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #54

    950512 SSC Construction Alert #54

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of November 23rd through November 28th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift).

    Site

    • Site grading (equipment: skip loader, dump trucks, vibratory equipment);
    • Retaining wall and seat wall – concrete placement for shade structure footings (equipment: concrete trucks, concrete pump, excavator, vibratory equipment);
    • Athletics and Dance Courtyard – shade structure installation (equipment: forklift, hammers, impact guns);
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards. The pedestrian paths at CHASS INT S, Athletics and Student Services will be temporary impacted, please see map below.

    Level 1

    • Framing and drywall installation (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws, screw guns);
    • East stair installation (equipment: forklift, saws, grinders, drills, hammers).

    Level 2

    • Framing and drywall installation (equipment: scissor lifts, lasers, drills, hammers, saws);
    • MEP rough-ins (equipment: scissor lifts, drills, band saws, hammers);
    • East stair installation (equipment: forklift, saws, grinders, drills, hammers).

    Level 3

    • Framing installation (equipment: scissor lifts, lasers, drills, hammers, saws);
    • MEP rough-ins (equipment: scissor lifts, drills, band saws, hammers).

    Roof

    • Penthouse roof installation (equipment: forklift, hammers, screw guns);
    • Parapet framing (equipment: cut off saws grinders, powder actuated tools, drills hammers).

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #55

    950512 SSC Construction Alert #55

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of November 30th through December 5th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift).

    Site

    • Retaining wall and seat wall – concrete placement (equipment: concrete trucks, concrete pump, excavator, vibratory equipment);
    • Athletics and Dance Courtyard – shade structure installation (equipment: forklift, hammers, impact guns);
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards. The pedestrian paths at CHASS INT S, Athletics and Student Services will be temporary impacted, please see map below.

    Level 1

    • Framing and drywall installation (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws, screw guns);
    • East stair installation (equipment: forklift, saws, grinders, drills, hammers).

    Level 2

    • Framing and drywall installation (equipment: scissor lifts, lasers, drills, hammers, saws);
    • MEP rough-ins (equipment: scissor lifts, drills, band saws, hammers);
    • East stair installation (equipment: forklift, saws, grinders, drills, hammers).

    Level 3

    • Framing installation (equipment: scissor lifts, lasers, drills, hammers, saws);
    • MEP rough-ins (equipment: scissor lifts, drills, band saws, hammers).

    Roof

    • Penthouse roof installation (equipment: forklift, hammers, screw guns);
    • Parapet framing (equipment: cut off saws grinders, powder actuated tools, drills hammers).

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #56

    950512 SSC Construction Alert #56

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of December 7th through December 12th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift).

    Site

    • Retaining wall and seat wall – rebar and concrete placement (equipment: concrete trucks, concrete pump, excavator, vibratory equipment);
    • Athletics and Dance Courtyard grading (equipment: bobcat, excavator);
    • Northeast fire lane forming (equipment: skill saws, hammers, drills);
    • Main south access road/fire lane grading and forming (equipment: skip loader, trucks, vibratory equipment);
    • Southwest pedestrian path grading (equipment: skip loader, trucks, vibratory equipment);
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards and the South fire lane. The pedestrian paths at CHASS INT S, Athletics, Student Services and adjacent to Humanities/Sproul will be temporary impacted, please see map below.

    Level 1

    • Interior Framing and drywall installation (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws, screw guns);
    • Exterior framing installation (equipment: scissor lifts, lasers, powder actuated tools, drills, hammers, saws);
    • Air and water barrier – north and west elevation exterior (equipment: airless sprayer);
    • East stair installation (equipment: forklift, saws, grinders, drills, hammers).

    Level 2

    • Interior Framing and drywall installation (equipment: scissor lifts, lasers, drills, hammers, saws);
    • Exterior framing installation (equipment: scissor lifts, lasers, powder actuated tools, drills, hammers, saws);
    • Air and water barrier – north and west elevation exterior (equipment: airless sprayer);
    • MEP rough-ins (equipment: scissor lifts, drills, band saws, hammers);
    • East stair installation (equipment: forklift, saws, grinders, drills, hammers).

    Level 3

    • Interior and exterior framing installation (equipment: scissor lifts, lasers, powder actuated tools, drills, hammers, saws);
    • Air and water barrier – north and west elevation exterior (equipment: airless sprayer);
    • MEP rough-ins (equipment: scissor lifts, drills, band saws, hammers).

    Roof

    • Mechanical equipment installation (equipment: crane, screw guns);
    • Parapet framing (equipment: cut off saws grinders, powder actuated tools, drills hammers);
    • Framing and steel (equipment: crane, welders, hammers, torches).

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #57

    950512 SSC Construction Alert #57

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of December 14th through December 19th:

               

    General

    • Material deliveries (equipment: trucks and trailers, forklift).

    Site

    • Student Services Courtyard sidewalks – forming and concrete placement (equipment: concrete trucks, skill saws, hammers, drills, vibratory equipment, power finishers, concrete saw);
    • Main south access road/fire lane grading, forming, and concrete placement (equipment: concrete trucks, skill saws, hammers, drills, vibratory equipment, power finishers, concrete saw);
    • Southwest pedestrian path grading (equipment: skip loader, trucks, vibratory equipment);
    • Exterior scaffold installation – east elevation (equipment: trucks, forklifts, hammers);
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards and the South fire lane. The pedestrian paths at CHASS INT S, Athletics, Student Services and adjacent to Humanities/Sproul will be temporary impacted, please see map below.

    Level 1

    • Drywall installation (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws, screw guns);
    • Exterior framing installation – south elevation (equipment: scissor lifts, lasers, powder actuated tools, drills, hammers, saws);
    • Exterior lath installation – north elevation(equipment: drills, hammers, saws);
    • Air and water barrier – west elevation exterior (equipment: airless sprayer);
    • Exterior sheathing – south elevation (equipment: drills, hammers, rotozips);
    • East stair installation (equipment: forklift, saws, grinders, drills, hammers).

    Level 2

    • Interior framing and drywall installation (equipment: scissor lifts, lasers, drills, hammers, saws);
    • MEP rough-ins (equipment: scissor lifts, drills, band saws, hammers);
    • Exterior framing installation – south elevation (equipment: scissor lifts, lasers, powder actuated tools, drills, hammers, saws);
    • Exterior lath installation – north elevation(equipment: drills, hammers, saws);
    • Air and water barrier – west elevation exterior (equipment: airless sprayer);
    • Exterior sheathing – south elevation (equipment: drills, hammers, rotozips);
    • East stair installation (equipment: forklift, saws, grinders, drills, hammers).

    Level 3

    • Interior framing installation (equipment: scissor lifts, lasers, powder actuated tools, drills, hammers, saws);
    • MEP rough-ins (equipment: scissor lifts, drills, band saws, hammers);
    • Exterior framing installation – south elevation (equipment: scissor lifts, lasers, powder actuated tools, drills, hammers, saws);
    • Exterior lath installation – north elevation(equipment: drills, hammers, saws);
    • Air and water barrier – west elevation exterior (equipment: airless sprayer);
    • Exterior sheathing – south elevation (equipment: drills, hammers, rotozips).

    Roof

    • Penthouse sheathing (equipment: drills, hammers, rotozips);
    • Parapet nailer replacement (equipment: cut off saws grinders, powder actuated tools, drills hammers);
    • Clerestory parapet steel (equipment: welders, hammers, torches);
    • Roofing install (equipment: air welders, rollers).

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #58

    950512 SSC Construction Alert #58

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas on December 19th:

    Levels 1, 2, 3

    • Preparation for air and water barrier testing.

    Roof

    • Roofing install (equipment: air welders, rollers).

     

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of December 21st through December 26th:

               

    General

    • Material deliveries (equipment: trucks and trailers, forklift).

    Site

    • Student Services Courtyard sidewalks – forming and concrete placement (equipment: concrete trucks, skill saws, hammers, drills, vibratory equipment, power finishers, concrete saw);
    • Main south access road/fire lane grading, forming, and concrete placement (equipment: concrete trucks, skill saws, hammers, drills, vibratory equipment, power finishers, concrete saw);
    • Southwest pedestrian path grading (equipment: skip loader, trucks, vibratory equipment);
    • East road grading (equipment: skip loader, trucks, vibratory equipment);
    • Exterior scaffold installation – east elevation (equipment: trucks, forklifts, hammers);
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards and the South fire lane. The pedestrian paths at CHASS INT S, Athletics, Student Services and adjacent to Humanities/Sproul will be temporary impacted, please see map below.

    Level 1

    • Drywall installation (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws, screw guns);
    • Exterior framing installation – south elevation (equipment: scissor lifts, lasers, powder actuated tools, drills, hammers, saws);
    • Exterior lath installation – north elevation(equipment: drills, hammers, saws);
    • Air and water barrier – west elevation exterior (equipment: airless sprayer);
    • Exterior sheathing – south elevation (equipment: drills, hammers, rotozips).

    Level 2

    • Interior framing and drywall installation (equipment: scissor lifts, lasers, drills, hammers, saws);
    • MEP rough-ins (equipment: scissor lifts, drills, band saws, hammers);
    • Exterior framing installation – south elevation (equipment: scissor lifts, lasers, powder actuated tools, drills, hammers, saws);
    • Exterior lath installation – north elevation(equipment: drills, hammers, saws);
    • Air and water barrier – west elevation exterior (equipment: airless sprayer);
    • Exterior sheathing – south elevation (equipment: drills, hammers, rotozips);
    • East stair installation (equipment: forklift, saws, grinders, drills, hammers).

    Level 3

    • Interior framing installation (equipment: scissor lifts, lasers, powder actuated tools, drills, hammers, saws);
    • MEP rough-ins (equipment: scissor lifts, drills, band saws, hammers);
    • Exterior framing installation – south elevation (equipment: scissor lifts, lasers, powder actuated tools, drills, hammers, saws);
    • Exterior lath installation – north elevation(equipment: drills, hammers, saws);
    • Air and water barrier – west elevation exterior (equipment: airless sprayer);
    • Exterior sheathing – south elevation (equipment: drills, hammers, rotozips).

    Roof

    • Penthouse sheathing (equipment: drills, hammers, rotozips);
    • Parapet nailer replacement (equipment: cut off saws grinders, powder actuated tools, drills hammers);
    • Clerestory parapet steel (equipment: welders, hammers, torches);
    • Roofing install (equipment: air welders, rollers).

     

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #59

    950512 SSC Construction Alert #59

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of December 28th through January 2nd:

    General

    • Material deliveries (equipment: trucks and trailers, forklift).

    Site

    • Student Services Courtyard sidewalks – forming and concrete placement (equipment: concrete trucks, skill saws, hammers, drills, vibratory equipment, power finishers, concrete saw);
    • Southwest pedestrian path grading, forming, and concrete placement (equipment: concrete trucks, skill saws, hammers, drills, vibratory equipment, power finishers, concrete saw);
    • East road grading, forming, and concrete placement (equipment: concrete trucks, skill saws, hammers, drills, vibratory equipment, power finishers, concrete saw);
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards and the South fire lane. The pedestrian paths at CHASS INT S, Athletics, Student Services and adjacent to Humanities/Sproul will be temporary impacted, please see map below.

    Level 1

    • Soffit framing and drywall installation (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws, screw guns);
    • Exterior lath installation (equipment: drills, hammers, saws);
    • Waterproofing (equipment: grinders, chipping hammers);
    • Exterior sheathing – south elevation (equipment: drills, hammers, rotozips).

    Level 2

    • Interior framing and drywall installation (equipment: scissor lifts, lasers, drills, hammers, saws);
    • MEP rough-ins (equipment: scissor lifts, drills, band saws, hammers);
    • Windows (equipment: scissor lifts, cutoff drills, saws, roro hammers);
    • Exterior lath installation (equipment: drills, hammers, saws);
    • Exterior sheathing – south elevation (equipment: drills, hammers, rotozips).

    Level 3

    • Interior framing installation (equipment: scissor lifts, lasers, powder actuated tools, drills, hammers, saws);
    • MEP rough-ins (equipment: scissor lifts, drills, band saws, hammers);
    • Exterior lath installation (equipment: drills, hammers, saws);
    • Exterior sheathing – south elevation (equipment: drills, hammers, rotozips);
    • East stair installation to roof (equipment: forklift, saws, grinders, drills, hammers).

    Roof

    • Roofing install (equipment: air welders, rollers).

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #60

    950512 SSC Construction Alert #60

    Happy New Year everyone!!

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of January 4th through January 9th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift).

    Site

    • Site concrete demo (equipment: trucks, tractors, gas powered concrete saw, jackhammer);
    • Site concrete placement (equipment: concrete trucks, skill saws, hammers, drills, vibratory equipment, power finishers, concrete saw);
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards and the South fire lane. The pedestrian paths at CHASS INT S, Athletics, Student Services and adjacent to Humanities/Sproul will be temporary impacted, please see map below.

    Level 1

    • Soffit framing and drywall installation (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws, screw guns);
    • Smoke dampers rough-ins (equipment: scissor lifts, drills, hammers);
    • Exterior lath installation (equipment: drills, hammers, saws);
    • Air and water barrier (equipment: airless sprayer);
    • Waterproofing (equipment: grinders, chipping hammers);
    • Exterior framing (equipment: drills, hammers, rotozips).

    Level 2

    • Interior framing and drywall installation (equipment: scissor lifts, lasers, drills, hammers, saws);
    • Smoke dampers rough-ins (equipment: scissor lifts, drills, hammers);
    • Windows (equipment: scissor lifts, cutoff drills, saws, roro hammers);
    • Air and water barrier (equipment: airless sprayer);
    • Exterior lath installation (equipment: drills, hammers, saws);
    • Waterproofing (equipment: grinders, chipping hammers);
    • Exterior framing (equipment: drills, hammers, rotozips).

    Level 3

    • Interior framing installation (equipment: scissor lifts, lasers, powder actuated tools, drills, hammers, saws);
    • MEP rough-ins (equipment: scissor lifts, drills, band saws, hammers);
    • Smoke dampers rough-ins (equipment: scissor lifts, drills, hammers);
    • Air and water barrier (equipment: airless sprayer);
    • Exterior lath installation (equipment: drills, hammers, saws);
    • Waterproofing (equipment: grinders, chipping hammers);
    • Exterior framing (equipment: drills, hammers, rotozips).

    Roof

    • Roofing install (equipment: air welders, rollers);
    • Penthouse piping (equipment: bandsaws, hammers, drills).

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #61

    950512 SSC Construction Alert #61

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of January 11th through January 16th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift).

    Site

    • Site concrete forming and placement (equipment: concrete trucks, skill saws, hammers, drills, vibratory equipment, power finishers, concrete saw);
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards and the South fire lane. The pedestrian paths at CHASS INT S, Athletics, Student Services and adjacent to Humanities/Sproul will be temporary impacted, please see map below.

    Level 1

    • Drywall and tape installation (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws, screw guns);
    • Exterior lath installation (equipment: drills, hammers, saws);
    • Air and water barrier (equipment: airless sprayer);
    • Exterior windows (equipment: scissor lifts, roto hammers, drills, chop saws);
    • Masonry veneer (equipment: drills, hammers, powder actuated tools);
    • Exterior sheathing and framing (equipment: drills, hammers, rotozips).

    Level 2

    • Drywall installation (equipment: scissor lifts, lasers, drills, hammers, saws);
    • Lighting rough-ins (equipment: scissor lifts, drills, band saws, hammers);
    • Air and water barrier (equipment: airless sprayer);
    • Exterior lath installation (equipment: drills, hammers, saws);
    • Exterior windows (equipment: scissor lifts, roto hammers, drills, chop saws);
    • Plaster install (equipment: plaster pump, plaster gun);
    • Exterior sheathing and framing (equipment: drills, hammers, rotozips).

    Level 3

    • Interior framing and drywall installation (equipment: scissor lifts, lasers, powder actuated tools, drills, hammers, saws);
    • Air and water barrier (equipment: airless sprayer);
    • Exterior lath installation (equipment: drills, hammers, saws);
    • Exterior windows (equipment: scissor lifts, roto hammers, drills, chop saws);
    • Masonry veneer ( equipment: drills, hammers, powder actuated tools);
    • Plaster install (equipment: plaster pump, plaster gun);
    • Exterior sheathing and framing (equipment: drills, hammers, rotozips).

    Roof

    • Roofing install (equipment: heat welders, reciprocating saws, airless sprayer);

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #62

    950512 SSC Construction Alert #62

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas on January 16th:

    Levels 1, 2, 3

    • Electrical and low voltage rough-ins (equipment: scissor lifts, drills, band saws, hammers).

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of January 18th through January 23rd:

    General

    • Material deliveries (equipment: trucks and trailers, forklift).

    Site

    • Site concrete forming and placement (equipment: concrete trucks, skill saws, hammers, drills, vibratory equipment, power finishers, concrete saw);
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards and the South fire lane. The pedestrian paths at CHASS INT S, Athletics, Student Services and adjacent to Humanities/Sproul will be temporary impacted, please see map below.

    Level 1

    • Drywall and tape installation (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws, screw guns);
    • Exterior lath installation (equipment: drills, hammers, saws);
    • Air and water barrier (equipment: airless sprayer);
    • Exterior windows (equipment: scissor lifts, roto hammers, drills, chop saws);
    • Masonry veneer (equipment: drills, hammers, powder actuated tools);
    • Exterior sheathing and framing (equipment: drills, hammers, rotozips).

    Level 2

    • Drywall installation (equipment: scissor lifts, lasers, drills, hammers, saws);
    • Lighting rough-ins (equipment: scissor lifts, drills, band saws, hammers);
    • Air and water barrier (equipment: airless sprayer);
    • Exterior lath installation (equipment: drills, hammers, saws);
    • Exterior windows (equipment: scissor lifts, roto hammers, drills, chop saws);
    • Plaster install (equipment: plaster pump, plaster gun);
    • Exterior sheathing and framing (equipment: drills, hammers, rotozips).

    Level 3

    • Interior framing and drywall installation (equipment: scissor lifts, lasers, powder actuated tools, drills, hammers, saws);
    • Air and water barrier (equipment: airless sprayer);
    • Exterior lath installation (equipment: drills, hammers, saws);
    • Exterior windows (equipment: scissor lifts, roto hammers, drills, chop saws);
    • Masonry veneer ( equipment: drills, hammers, powder actuated tools);
    • Plaster install (equipment: plaster pump, plaster gun);
    • Exterior sheathing and framing (equipment: drills, hammers, rotozips).

    Roof

    • Roofing install (equipment: heat welders, reciprocating saws, airless sprayer);

     

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #63

    950512 SSC Construction Alert #63

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas on January 23rd:

    Levels 1, 2, 3

    • Electrical and low voltage rough-ins (equipment: scissor lifts, drills, band saws, hammers).

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of January 25th through January 30th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift).

    Site

    • Site concrete forming and placement (equipment: concrete trucks, skill saws, hammers, drills, vibratory equipment, power finishers, concrete saw);
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards and the South fire lane. The pedestrian paths at CHASS INT S, Athletics, Student Services and adjacent to Humanities/Sproul will be temporary impacted, please see map below.

    Level 1

    • Drywall and tape installation (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws, screw guns);
    • Exterior lath installation (equipment: drills, hammers, saws);
    • Air and water barrier (equipment: airless sprayer);
    • Exterior windows (equipment: scissor lifts, roto hammers, drills, chop saws);
    • Masonry veneer (equipment: drills, hammers, powder actuated tools);
    • Exterior sheathing and framing (equipment: drills, hammers, rotozips).

    Level 2

    • Drywall and tape installation (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws, screw guns);
    • Lighting rough-ins (equipment: scissor lifts, drills, band saws, hammers);
    • Air and water barrier (equipment: airless sprayer);
    • Exterior lath installation (equipment: drills, hammers, saws);
    • Exterior windows (equipment: scissor lifts, roto hammers, drills, chop saws);
    • Plaster install (equipment: plaster pump, plaster gun);
    • Exterior sheathing and framing (equipment: drills, hammers, rotozips).

    Level 3

    • Interior framing and drywall installation (equipment: scissor lifts, lasers, powder actuated tools, drills, hammers, saws);
    • Air and water barrier (equipment: airless sprayer);
    • Exterior lath installation (equipment: drills, hammers, saws);
    • Exterior windows (equipment: scissor lifts, roto hammers, drills, chop saws);
    • Masonry veneer ( equipment: drills, hammers, powder actuated tools);
    • Plaster install (equipment: plaster pump, plaster gun);
    • Exterior sheathing and framing (equipment: drills, hammers, rotozips).

    Roof

    • Roofing install (equipment: heat welders, reciprocating saws, airless sprayer);
    • Penthouse lath installation (equipment: drills, hammers, saws).

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #64

    950512 SSC Construction Alert #64

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas on January 30th:

                Levels 1, 2, 3

    • Electrical and low voltage rough-ins (equipment: scissor lifts, drills, band saws, hammers);
    • Plumbing piping install (equipment: scissor lifts, drills, band saws, hammers);
    • Plaster work.

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of February 1st through February 6th:

                General

    • Material deliveries (equipment: trucks and trailers, forklift).

    Site

    • Site concrete forming and placement (equipment: concrete trucks, skill saws, hammers, drills, vibratory equipment, power finishers, concrete saw);
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards and the South fire lane. The pedestrian paths at CHASS INT S, Athletics, Student Services and adjacent to Humanities/Sproul will be temporary impacted, please see map below.

    Level 1

    • Drywall and tape installation (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws, screw guns);
    • Main Electrical room rough-in (equipment: scissor lifts, roto hammers, band saws, drills, hammers);
    • Exterior lath installation (equipment: drills, hammers, saws);
    • Exterior windows and curtain wall (equipment: scissor lifts, roto hammers, drills, chop saws);
    • Masonry veneer (equipment: drills, hammers, powder actuated tools);
    • Exterior sheathing and framing (equipment: drills, hammers, rotozips).

    Level 2

    • Drywall and tape installation (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws, screw guns);
    • Lighting rough-ins (equipment: scissor lifts, drills, band saws, hammers);
    • Exterior lath installation (equipment: drills, hammers, saws);
    • Exterior windows (equipment: scissor lifts, roto hammers, drills, chop saws);
    • Plaster install (equipment: plaster pump, plaster gun);
    • Exterior sheathing and framing (equipment: drills, hammers, rotozips).

    Level 3

    • Interior framing and drywall installation (equipment: scissor lifts, lasers, powder actuated tools, drills, hammers, saws);
    • Electrical and low voltage rough-ins (equipment: scissor lifts, drills, band saws, hammers);
    • Exterior lath installation (equipment: drills, hammers, saws);
    • Exterior windows (equipment: scissor lifts, roto hammers, drills, chop saws);
    • Masonry veneer ( equipment: drills, hammers, powder actuated tools);
    • Plaster install (equipment: plaster pump, plaster gun);
    • Exterior sheathing and framing (equipment: drills, hammers, rotozips).

    Roof

    • Roofing install (equipment: heat welders, reciprocating saws, airless sprayer);
    • Penthouse lath installation (equipment: drills, hammers, saws).

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #65

    950512 SSC Construction Alert #65

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas on February 6th:           

    Levels 1, 2, 3

    • Electrical and low voltage rough-ins (equipment: scissor lifts, drills, band saws, hammers);
    • Plaster work.

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of February 8th through February 13th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift).

    Site

    • Site concrete forming and placement (equipment: concrete trucks, skill saws, hammers, drills, vibratory equipment, power finishers, concrete saw);
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards and the South fire lane. The pedestrian paths at CHASS INT S, Athletics, Student Services and adjacent to Humanities/Sproul will be temporary impacted, please see map below.

    Level 1

    • Drywall and tape installation (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws, screw guns);
    • Main Electrical room rough-in (equipment: scissor lifts, roto hammers, band saws, drills, hammers);
    • Restroom tile install (equipment: tile saws, drills, mixers);
    • Painting (equipment: airless sprayer);
    • Ceiling wire install (equipment: scissor lifts, powder actuated tools, roto hammers);
    • Exterior windows and curtain wall (equipment: scissor lifts, roto hammers, drills, chop saws);
    • Masonry veneer (equipment: drills, hammers, powder actuated tools);
    • Exterior sheathing and framing (equipment: drills, hammers, rotozips).

    Level 2

    • Drywall and tape installation (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws, screw guns);
    • Lighting rough-ins (equipment: scissor lifts, drills, band saws, hammers);
    • Painting (equipment: airless sprayer);
    • Ceiling wire install (equipment: scissor lifts, powder actuated tools, roto hammers);
    • Exterior windows (equipment: scissor lifts, roto hammers, drills, chop saws);
    • Plaster install (equipment: plaster pump, plaster gun);
    • Exterior sheathing and framing (equipment: drills, hammers, rotozips).

    Level 3

    • Interior framing and drywall installation (equipment: scissor lifts, lasers, powder actuated tools, drills, hammers, saws);
    • Lighting rough-ins (equipment: scissor lifts, drills, band saws, hammers);
    • Electrical and low voltage rough-ins (equipment: scissor lifts, drills, band saws, hammers);
    • Exterior windows (equipment: scissor lifts, roto hammers, drills, chop saws);
    • Plaster install (equipment: plaster pump, plaster gun);
    • Exterior sheathing and framing (equipment: drills, hammers, rotozips).

    Roof

    • Roofing install (equipment: heat welders, reciprocating saws, airless sprayer);

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #66

    950512 SSC Construction Alert #66

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas on February 13th:

    Levels 1, 2, 3, and Roof

    • Electrical rough-ins and wiring (equipment: scissor lifts, drills, band saws, hammers).

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of February 15th through February 20th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift).

    Site

    • Site concrete forming and placement (equipment: concrete trucks, skill saws, hammers, drills, vibratory equipment, power finishers, concrete saw);
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards and the South fire lane. The pedestrian paths at CHASS INT S, Athletics, Student Services and adjacent to Humanities/Sproul will be temporary impacted, please see map below.

    Level 1

    • Drywall taping (equipment: scissor lifts, drills, roto zips);
    • Restroom tile install (equipment: tile saws, drills, mixers);
    • Electrical room rough-in and feeders (equipment: scissor lifts, roto hammers, band saws, drills, hammers);
    • Painting (equipment: airless sprayer);
    • Ceiling wire install (equipment: scissor lifts, powder actuated tools, roto hammers);
    • Exterior windows and curtain wall (equipment: scissor lifts, roto hammers, drills, chop saws);
    • Masonry veneer (equipment: drills, hammers, powder actuated tools);
    • Exterior sheathing and framing (equipment: drills, hammers, rotozips).

    Level 2

    • Drywall and tape installation (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws, screw guns);
    • Lighting rough-ins (equipment: scissor lifts, drills, band saws, hammers);
    • Tube steel installation – large lecture hall (equipment: scissor lifts, welders, grinders, cut off saws);
    • Painting (equipment: airless sprayer);
    • Ceiling wire install (equipment: scissor lifts, powder actuated tools, roto hammers);
    • Exterior windows and curtain wall (equipment: scissor lifts, roto hammers, drills, chop saws);
    • Plaster install (equipment: plaster pump, plaster gun);
    • Exterior sheathing and framing (equipment: drills, hammers, rotozips).

    Level 3

    • Drywall and tape installation (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws, screw guns);
    • Lighting rough-ins (equipment: scissor lifts, drills, band saws, hammers);
    • Electrical and low voltage rough-ins (equipment: scissor lifts, drills, band saws, hammers);
    • Exterior windows and curtain wall (equipment: scissor lifts, roto hammers, drills, chop saws);
    • Plaster install (equipment: plaster pump, plaster gun);
    • Exterior sheathing and framing (equipment: drills, hammers, rotozips).

    Roof

    • Penthouse door installation (equipment: drills, hammers);
    • Penthouse color coat plaster (equipment: mixers)

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #67

    950512 SSC Construction Alert #67

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas on February 20th:    

    Levels 1, 2, 3, and Roof

    • Electrical rough-ins and overhead wiring (equipment: scissor lifts, drills, band saws, hammers);
    • Deck insulation (equipment: scissor lifts, drills, hammers);
    • Prime and paint (equipment: airless sprayer);
    • Window frame installation and caulking (equipment: scissor lifts, roto hammers, drills, chop saws).

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of February 22nd through February 27th:  

    General

    • Material deliveries (equipment: trucks and trailers, forklift).

    Site

    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards and the South fire lane. The pedestrian paths at CHASS INT S, Athletics, Student Services and adjacent to Humanities/Sproul will be temporary impacted, please see map below.

    Level 1

    • Drywall taping (equipment: scissor lifts, drills, roto zips);
    • Restroom tile install (equipment: tile saws, drills, mixers);
    • Electrical room rough-in and feeders (equipment: scissor lifts, roto hammers, band saws, drills, hammers);
    • Painting (equipment: airless sprayer);
    • Ceiling wire install (equipment: scissor lifts, powder actuated tools, roto hammers);
    • Floor polishing (equipment: grinders, vacuums);
    • Exterior windows and curtain wall (equipment: scissor lifts, roto hammers, drills, chop saws);
    • Color coat plaster (equipment: mixers);
    • Soffits sheathing and lath (equipment: drills, hammers);
    • Masonry veneer (equipment: drills, hammers, powder actuated tools);
    • Exterior sheet metal (equipment: boom lifts, drills).

    Level 2

    • Drywall and tape installation (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws, screw guns);
    • Lighting rough-ins (equipment: scissor lifts, drills, band saws, hammers);
    • Electrical room rough-in and feeders (equipment: scissor lifts, roto hammers, band saws, drills, hammers);
    • Tube steel installation – large lecture hall (equipment: scissor lifts, welders, grinders, cut off saws);
    • Painting (equipment: airless sprayer);
    • Ceiling wire install (equipment: scissor lifts, powder actuated tools, roto hammers);
    • Floor polishing (equipment: grinders, vacuums);
    • Exterior windows and curtain wall (equipment: scissor lifts, roto hammers, drills, chop saws);
    • Color coat plaster (equipment: mixers);
    • Exterior sheet metal (equipment: boom lifts, drills).

    Level 3

    • Drywall and tape installation (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws, screw guns);
    • Lighting rough-ins (equipment: scissor lifts, drills, band saws, hammers);
    • Electrical room rough-in and feeders (equipment: scissor lifts, roto hammers, band saws, drills, hammers);
    • Electrical and low voltage rough-ins (equipment: scissor lifts, drills, band saws, hammers);
    • Exterior windows and curtain wall (equipment: scissor lifts, roto hammers, drills, chop saws);
    • Color coat plaster (equipment: mixers);
    • Exterior sheet metal (equipment: boom lifts, drills).

    Roof

    • Penthouse door installation (equipment: drills, hammers).

    Please be advised that the Student Success Center building is preparing to transfer from temporary to permanent electric power. As a result we are anticipating and coordinating a power shutdown that will affect CHASS INT North and South on Saturday, March 6. Please see attached for more details the Facilities Services advanced notification.

    Items listed in red: Please note that this activity may potentially disrupt the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #68

    950512 SSC Construction Alert #68

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas on February 27th:

    Levels 1, 2, 3, and Roof

    • Electrical feeder and branch circuits install (equipment: scissor lifts, drills, band saws, hammers);
    • Deck insulation (equipment: scissor lifts, drills, hammers);
    • Light grid install at large lecture hall (equipment: scissor lifts, drills, band saws, hammers);
    • Framing and tape installation (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws, screw guns);
    • Window frame installation and caulking (equipment: scissor lifts, roto hammers, drills, chop saws).

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of March 1st through March 6th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift);
    • Please be advised that the Student Success Center building is preparing to transfer from temporary to permanent electric power. As a result we are anticipating and coordinating a power shutdown that will affect CHASS INT North and South on Saturday, March 6. Please see attached the Facilities Services advanced notification for more details.

    Site

    • Path of travel improvement to Parking Lot 1, at Parking Lot 1, and at the West Campus Drive bus station – concrete demo and earthwork (equipment: dump trucks, skip loader, concrete saws, jackhammers);
    • Please be advised that the construction fencing layout will be updated to incorporate the accessibility improvements for the path of travel to Parking Lot 1, at Parking Lot 1, and at the West Campus Drive bus station. Some of the associated pedestrian paths will be temporarily impacted, please see updated maps below;
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards and the South fire lane. The pedestrian paths at CHASS INT S, Athletics, Student Services and adjacent to Humanities/Sproul will be temporarily impacted, please see map below.

    Level 1

    • Drywall taping (equipment: scissor lifts, drills, roto zips);
    • Restroom floor polish (equipment: grinders, vacuums);
    • Electrical room rough-in and feeders (equipment: scissor lifts, roto hammers, band saws, drills, hammers);
    • Painting (equipment: airless sprayer);
    • Ceiling wire install (equipment: scissor lifts, powder actuated tools, roto hammers);
    • Floor polishing (equipment: grinders, vacuums);
    • Exterior windows and curtain wall (equipment: scissor lifts, roto hammers, drills, chop saws);
    • Soffits lath (equipment: drills, hammers);
    • Masonry veneer (equipment: drills, hammers, powder actuated tools);
    • Exterior sheet metal (equipment: boom lifts, drills).

    Level 2

    • Drywall and tape installation (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws, screw guns);
    • Lighting rough-ins (equipment: scissor lifts, drills, band saws, hammers);
    • Electrical room rough-in and feeders (equipment: scissor lifts, roto hammers, band saws, drills, hammers);
    • Tube steel installation – large lecture hall (equipment: scissor lifts, welders, grinders, cut off saws);
    • Painting (equipment: airless sprayer);
    • Ceiling wire install (equipment: scissor lifts, powder actuated tools, roto hammers);
    • Floor polishing (equipment: grinders, vacuums);
    • Exterior windows and curtain wall (equipment: scissor lifts, roto hammers, drills, chop saws);
    • Color coat plaster (equipment: mixers);
    • Exterior sheet metal (equipment: boom lifts, drills).

    Level 3

    • Drywall and tape installation (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws, screw guns);
    • Lighting rough-ins (equipment: scissor lifts, drills, band saws, hammers);
    • Electrical room rough-in and feeders (equipment: scissor lifts, roto hammers, band saws, drills, hammers);
    • Electrical and low voltage rough-ins (equipment: scissor lifts, drills, band saws, hammers);
    • Exterior windows and curtain wall (equipment: scissor lifts, roto hammers, drills, chop saws);
    • Color coat plaster (equipment: mixers);
    • Exterior sheet metal (equipment: boom lifts, drills).

    Roof

    • Penthouse door installation (equipment: drills, hammers);
    • High roof clearstory framing (equipment: scissor lifts, zoom boom, cutoff saws, drills, hammers);
    • High roof suspended ceiling (equipment: drills, hammers, lasers).

    Items listed in red: Please note that this activity may potentially disrupt the pedestrian pathways and/or the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #69

    950512 SSC Construction Alert #69

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas on March 6th:

    Levels 1, 2, 3, and Roof

    • The Student Success Center building will transfer from temporary to permanent electric power resulting in a power shutdown on Saturday, March 6 between 7:00AM-1:00PM that will affect CHASS INT North and South. See attached the Facilities Services advanced notification reminder for more details.
    • Electrical feeder and branch circuits install (equipment: scissor lifts, drills, band saws, hammers);
    • Deck insulation (equipment: scissor lifts, drills, hammers);
    • Framing and taping (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws, screw guns);
    • Window frame installation and caulking (equipment: scissor lifts, roto hammers, drills, chop saws).

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of March 8th through March 13th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift);

    Site

    • Path of travel improvement to Parking Lot 1, at Parking Lot 1, and at the West Campus Drive bus station – concrete demo and earthwork (equipment: dump trucks, skip loader, concrete saws, jackhammers);
    • Please be advised that the construction fencing layout will be updated to incorporate the accessibility improvements for the path of travel to Parking Lot 1, at Parking Lot 1, and at the West Campus Drive bus station. Some of the associated pedestrian paths will be temporarily impacted, please see updated maps below;
    • North exterior concrete cutting and removal (equipment: dump trucks, skip loader, concrete saw, jackhammer);
    • Scaffold removal ( equipment: trucks, hammers);
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards and the South fire lane. The pedestrian paths at CHASS INT S, Athletics, Student Services and adjacent to Humanities/Sproul will be temporarily impacted, please see map below.

    Level 1

    • Drywall and taping (equipment: scissor lifts, drills, roto zips);
    • Electrical room branch circuiting (equipment: scissor lifts, roto hammers, band saws, drills, hammers);
    • Painting (equipment: airless sprayer);
    • Ceiling grid install (equipment: scissor lifts, powder actuated tools, roto hammers);
    • Exterior windows and curtain wall (equipment: scissor lifts, roto hammers, drills, chop saws);
    • Soffits lath (equipment: drills, hammers);
    • West soffit plaster (equipment: forklift, plaster mixer/gun);
    • Underdeck insulation (equipment: scissor lifts);
    • Exterior sheet metal (equipment: boom lifts, drills).

    Level 2

    • Drywall and taping (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws, screw guns);
    • Electrical and lighting rough-ins (equipment: scissor lifts, drills, band saws, hammers);
    • Electrical room branch circuiting (equipment: scissor lifts, roto hammers, band saws, drills, hammers);
    • Painting (equipment: airless sprayer);
    • Ceiling grid install (equipment: scissor lifts, powder actuated tools, roto hammers);
    • Exterior windows and curtain wall (equipment: scissor lifts, roto hammers, drills, chop saws);
    • Underdeck insulation (equipment: scissor lifts);
    • Exterior sheet metal (equipment: boom lifts, drills).

    Level 3

    • Drywall and taping (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws, screw guns);
    • Lighting rough-ins (equipment: scissor lifts, drills, band saws, hammers);
    • Painting (equipment: airless sprayer);
    • Electrical room branch circuiting (equipment: scissor lifts, roto hammers, band saws, drills, hammers);
    • Electrical and low voltage rough-ins (equipment: scissor lifts, drills, band saws, hammers);
    • Exterior windows and curtain wall (equipment: scissor lifts, roto hammers, drills, chop saws);
    • Underdeck insulation (equipment: scissor lifts);
    • Exterior sheet metal (equipment: boom lifts, drills).

    Roof

    • Penthouse door installation (equipment: drills, hammers);
    • High roof clearstory framing (equipment: scissor lifts, zoom boom, cutoff saws, drills, hammers);
    • High roof suspended ceiling (equipment: drills, hammers, lasers);
    • High roof densglass, air and water barrier installation (equipment: zoom booms, alarms drills, hammers).

    Items listed in red: Please note that this activity may potentially disrupt the pedestrian pathways and/or the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #70

    950512 SSC Construction Alert #70

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas on March 13th:

    Levels 1, 2, 3, and Roof

    • Electrical feeder and branch circuits install (equipment: scissor lifts, drills, band saws, hammers);
    • Deck insulation (equipment: scissor lifts, drills, hammers);
    • Paint high roof steel (equipment: scissor lifts, boom lifts, sprayer);
    • Window frame installation and caulking (equipment: scissor lifts, roto hammers, drills, chop saws).

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of March 15th through March 20th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift);

    Site

    • Path of travel improvement to Parking Lot 1, at Parking Lot 1, and at the West Campus Drive bus station – concrete demo and earthwork (equipment: dump trucks, skip loader, concrete saws, jackhammers);
    • Please be advised that the construction fencing layout was updated to incorporate the accessibility improvements for the path of travel to Parking Lot 1, at Parking Lot 1, and at the West Campus Drive bus station. Some of the associated pedestrian paths will be temporarily impacted, please see updated maps below;
    • North exterior concrete cutting and removal (equipment: dump trucks, skip loader, concrete saw, jackhammer);
    • Scaffold removal ( equipment: trucks, hammers);
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards and the South fire lane. The pedestrian paths at CHASS INT S, Athletics, Student Services and adjacent to Humanities/Sproul will be temporarily impacted, please see map below.

    Level 1

    • Drywall and taping (equipment: scissor lifts, drills, roto zips);
    • Electrical room branch circuiting (equipment: scissor lifts, roto hammers, band saws, drills, hammers);
    • Painting (equipment: airless sprayer);
    • Floor polishing (equipment: grinders, vacuums);
    • Ceiling grid install (equipment: scissor lifts, powder actuated tools, roto hammers);
    • Exterior windows and curtain wall (equipment: scissor lifts, roto hammers, drills, chop saws);
    • Soffits lath (equipment: drills, hammers);
    • West soffit plaster (equipment: forklift, plaster mixer/gun);
    • Underdeck insulation (equipment: scissor lifts);
    • Exterior sheet metal (equipment: boom lifts, drills).

    Level 2

    • Drywall and taping (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws, screw guns);
    • Electrical and lighting rough-ins (equipment: scissor lifts, drills, band saws, hammers);
    • Electrical room branch circuiting (equipment: scissor lifts, roto hammers, band saws, drills, hammers);
    • Painting (equipment: airless sprayer);
    • Ceiling grid install (equipment: scissor lifts, powder actuated tools, roto hammers);
    • Exterior windows and curtain wall (equipment: scissor lifts, roto hammers, drills, chop saws);
    • Underdeck insulation (equipment: scissor lifts);
    • Exterior sheet metal (equipment: boom lifts, drills).

    Level 3

    • Drywall and taping (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws, screw guns);
    • Lighting rough-ins (equipment: scissor lifts, drills, band saws, hammers);
    • Painting (equipment: airless sprayer);
    • Electrical room branch circuiting (equipment: scissor lifts, roto hammers, band saws, drills, hammers);
    • Electrical and low voltage rough-ins (equipment: scissor lifts, drills, band saws, hammers);
    • Exterior windows and curtain wall (equipment: scissor lifts, roto hammers, drills, chop saws);
    • Underdeck insulation (equipment: scissor lifts);
    • Exterior sheet metal (equipment: boom lifts, drills).

    Roof

    • High roof clearstory framing (equipment: scissor lifts, zoom boom, cutoff saws, drills, hammers);
    • High roof suspended ceiling (equipment: drills, hammers, lasers).

    Items listed in red: Please note that this activity may potentially disrupt the pedestrian pathways and/or the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

     

  • Construction Alert #71

    950512 SSC Construction Alert #71

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas on March 20th:

    Levels 1, 2, 3, and Roof

    • Electrical and low voltage rough-ins (equipment: drills, band saws, hammers);
    • Deck insulation (equipment: scissor lifts, drills, hammers);
    • Window frame installation and caulking (equipment: scissor lifts, roto hammers, drills, chop saws).

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of March 22nd through March 27th

    General

    • Material deliveries (equipment: trucks and trailers, forklift);

    Site

    • Path of travel improvement to Parking Lot 1, at Parking Lot 1, and at the West Campus Drive bus station – demo and earthwork (equipment: dump trucks, skip loader, concrete saws, jackhammers);
    • Please be advised that the construction fencing layout was updated to incorporate the accessibility improvements for the path of travel to Parking Lot 1, at Parking Lot 1, and at the West Campus Drive bus station. Some of the associated pedestrian paths will be temporarily impacted, please see updated maps below;
    • Underground work for light pole installation – South fire road (equipment: excavator);
    • North exterior site concrete (equipment: excavator, bobcat, skill saw, hammers);
    • Fencing relocation (equipment: trucks, drills, hammers);
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards and the South fire lane. The pedestrian paths at CHASS INT S, Athletics, Student Services and adjacent to Humanities/Sproul will be temporarily impacted, please see map below.

    Level 1

    • Drywall and taping (equipment: scissor lifts, drills, roto zips);
    • Electrical room branch circuiting (equipment: scissor lifts, roto hammers, band saws, drills, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, roto hammers);
    • Painting (equipment: airless sprayer);
    • Floor polishing (equipment: grinders, vacuums);
    • Ceiling grid install (equipment: scissor lifts, powder actuated tools, roto hammers);
    • Exterior windows and curtain wall (equipment: scissor lifts, roto hammers, drills, chop saws);
    • Soffits lath (equipment: drills, hammers);
    • West soffit plaster (equipment: forklift, plaster mixer/gun);
    • Underdeck insulation (equipment: scissor lifts);
    • Exterior sheet metal (equipment: boom lifts, drills).

    Level 2

    • Drywall and taping (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws, screw guns);
    • Electrical and lighting (equipment: scissor lifts, drills, band saws, hammers);
    • Electrical room branch circuiting (equipment: scissor lifts, roto hammers, band saws, drills, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, roto hammers);
    • Painting (equipment: airless sprayer);
    • Ceiling grid install (equipment: scissor lifts, powder actuated tools, roto hammers);
    • Exterior windows and curtain wall (equipment: scissor lifts, roto hammers, drills, chop saws);
    • Underdeck insulation (equipment: scissor lifts);
    • Exterior sheet metal (equipment: boom lifts, drills).

    Level 3

    • Drywall and taping (equipment: scissor lifts, powder actuated tools, drills, roto hammers, chop saws, screw guns);
    • Electrical and lighting (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, roto hammers);
    • Painting (equipment: airless sprayer);
    • Electrical room branch circuiting (equipment: scissor lifts, roto hammers, band saws, drills, hammers);
    • Exterior windows and curtain wall (equipment: scissor lifts, roto hammers, drills, chop saws);
    • Underdeck insulation (equipment: scissor lifts);
    • Exterior sheet metal (equipment: boom lifts, drills).

    Roof

    • High roof clearstory sheet metal (equipment: zoom boom, cutoff saws, drills, hammers);
    • High roof suspended ceiling (equipment: drills, hammers, lasers).

    Items listed in red: Please note that this activity may potentially disrupt the pedestrian pathways and/or the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #72

    950512 SSC Construction Alert #72

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas on March 27th:

    Levels 1, 2, 3, and Roof

    • Electrical and low voltage rough-ins (equipment: drills, band saws, hammers);
    • Deck insulation (equipment: scissor lifts, drills, hammers);
    • Window frame installation and caulking (equipment: scissor lifts, roto hammers, drills, chop saws);
    • Eastern stair primer paint.

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of March 29th through April 3rd:

    General

    • Material deliveries (equipment: trucks and trailers, forklift);

    Site

    • Path of travel improvement to Parking Lot 1, at Parking Lot 1, and at the West Campus Drive bus station – demo and earthwork (equipment: dump trucks, skip loader, concrete saws, jackhammers);
    • Please be advised that the construction fencing layout was updated to incorporate the accessibility improvements for the path of travel to Parking Lot 1, at Parking Lot 1, and at the West Campus Drive bus station. Some of the associated pedestrian paths will be temporarily impacted, please see updated maps below;
    • North exterior site concrete (equipment: excavator, bobcat, skill saw, hammers);
    • Fencing relocation (equipment: trucks, drills, hammers);
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards and the South fire lane. The pedestrian paths at CHASS INT S, Athletics, Student Services and adjacent to Humanities/Sproul will be temporarily impacted, please see map below.

    Level 1

    • Framing – dining services area (equipment: cutoff saws, grinders, drills, powder actuated tools, hammers);
    • Electrical and lighting (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Ceiling grid and sprinkler install (equipment: scissor lifts, drills);
    • Exterior sheet metal (equipment: boom lifts, drills).

    Level 2

    • Drywall finish sanding (equipment: scissor lifts, sanding poles);
    • Electrical and lighting (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Tiered seating framing in lecture halls (equipment: cutoff saws, grinders, drills, powder actuated tools, hammers);
    • Ceiling grid and sprinkler install (equipment: scissor lifts, drills);
    • Floor polishing (equipment: grinders, vacuums);
    • Paseo guardrail grinding (equipment: grinders);
    • Exterior windows and curtain wall (equipment: scissor lifts, roto hammers, drills, chop saws);
    • Exterior sheet metal (equipment: boom lifts, drills).

    Level 3

    • Drywall finish sanding (equipment: scissor lifts, sanding poles);
    • Electrical and lighting (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Tiered seating framing in lecture halls (equipment: cutoff saws, grinders, drills, powder actuated tools, hammers);
    • Paseo guardrail welding and grinding (equipment: welding machines, grinders);
    • Exterior windows and curtain wall (equipment: scissor lifts, roto hammers, drills, chop saws);
    • Exterior sheet metal (equipment: boom lifts, drills).

    Roof

    • High roof suspended ceiling (equipment: drills, hammers, lasers).

    Items listed in red: Please note that this activity may potentially disrupt the pedestrian pathways and/or the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #73

    950512 SSC Construction Alert #73

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas on April 3rd:

    Levels 1, 2, 3, and Roof

    • Electrical and low voltage rough-ins (equipment: drills, band saws, hammers);
    • Deck insulation (equipment: scissor lifts, drills, hammers);
    • Window frame installation and caulking (equipment: scissor lifts, roto hammers, drills, chop saws).

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of April 5th through April 10th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift);

    Site

    • Path of travel improvement to Parking Lot 1, at Parking Lot 1, and at the West Campus Drive bus station – grading, forming and concrete (equipment: skip loader, vibratory equipment);
    • Please be advised that the construction fencing layout was updated to incorporate the accessibility improvements for the path of travel to Parking Lot 1, at Parking Lot 1, and at the West Campus Drive bus station. Some of the associated pedestrian paths will be temporarily impacted, please see updated maps below;
    • North and West exterior site grading and concrete (equipment: excavator, bobcat, , vibratory equipment, skip loader, skill saw, hammers);
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards and the South fire lane. The pedestrian paths at CHASS INT S, Student Services and adjacent to Humanities/Sproul will be temporarily impacted, please see map below.

    Level 1

    • Framing – dining services area (equipment: cutoff saws, grinders, drills, powder actuated tools, hammers);
    • Electrical and lighting (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Ceiling grid and sprinkler install (equipment: scissor lifts, drills);
    • Exterior sheet metal (equipment: boom lifts, drills).

    Level 2

    • Drywall finish sanding (equipment: scissor lifts, sanding poles);
    • Electrical and lighting (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Tiered seating framing and sureboard installation in lecture halls (equipment: cutoff saws, skill saws, grinders, drills, powder actuated tools, hammers);
    • Ceiling grid and sprinkler install (equipment: scissor lifts, drills);
    • Paseo guardrail grinding (equipment: grinders);
    • Exterior windows and curtain wall (equipment: scissor lifts, roto hammers, drills, chop saws);
    • Exterior sheet metal (equipment: boom lifts, drills).

    Level 3

    • Drywall finish sanding (equipment: scissor lifts, sanding poles);
    • Electrical and lighting (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Tiered seating framing in lecture halls (equipment: cutoff saws, grinders, drills, powder actuated tools, hammers);
    • Paseo guardrail welding and grinding (equipment: welding machines, grinders);
    • Exterior windows and curtain wall (equipment: scissor lifts, roto hammers, drills, chop saws);
    • Exterior sheet metal (equipment: boom lifts, drills).

    Roof

    • High roof suspended ceiling (equipment: drills, hammers, lasers).

    Items listed in red: Please note that this activity may potentially disrupt the pedestrian pathways and/or the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #74

    950512 SSC Construction Alert #74

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas on April 10th:

    Levels 1, 2, 3, and Roof

    • Electrical and low voltage rough-ins (equipment: drills, band saws, hammers);
    • Deck insulation (equipment: scissor lifts, drills, hammers).

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of April 12th through April 17th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift);

    Site

    • South fire road light pole base concrete (equipment: concrete truck, vibratory equipment);
    • East exterior site grading (equipment: dump trucks, bobcat, excavator, vibratory equipment);
    • Path of travel improvement to Parking Lot 1, at Parking Lot 1, and at the West Campus Drive bus station – grading, forming and concrete (equipment: concrete trucks, concrete pump, skip loader, vibratory equipment);
    • Please be advised that the construction fencing layout was updated to incorporate the accessibility improvements for the path of travel to Parking Lot 1, at Parking Lot 1, and at the West Campus Drive bus station. Some of the associated pedestrian paths will be temporarily impacted, please see updated maps below;
    • North and West exterior site concrete (equipment: concrete trucks, concrete pump, vibratory equipment, skip loader, skill saw, hammers);
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards and the South fire lane. Portions of the pedestrian paths at CHASS INT S, Student Services and adjacent to Humanities/Sproul will be temporarily impacted, please see map below.

    Level 1

    • Framing – dining services area (equipment: cutoff saws, grinders, drills, powder actuated tools, hammers);
    • Electrical and lighting (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Restroom countertop installation (equipment: grinder, vacuums);
    • Ceiling grid and sprinkler trim install (equipment: scissor lifts, drills);
    • Exterior sheet metal (equipment: boom lifts, drills).

    Level 2

    • Electrical and lighting (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Tiered seating sureboard installation in lecture halls (equipment: cutoff saws, skill saws, grinders, drills, powder actuated tools, hammers);
    • Restroom countertop installation (equipment: grinder, vacuums);
    • Ceiling grid and sprinkler trim install (equipment: scissor lifts, drills);
    • Exterior windows and curtain wall (equipment: scissor lifts, roto hammers, drills, chop saws);
    • Exterior sheet metal (equipment: boom lifts, drills).

    Level 3

    • Electrical and lighting (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Tiered seating framing in lecture halls (equipment: cutoff saws, grinders, drills, powder actuated tools, hammers);
    • Restroom countertop installation (equipment: grinder, vacuums);
    • Ceiling grid and sprinkler trim install (equipment: scissor lifts, drills);
    • High roof scaffold lowering (equipment: forklift);
    • Exterior windows and curtain wall (equipment: scissor lifts, roto hammers, drills, chop saws);
    • Exterior sheet metal (equipment: boom lifts, drills).

    Roof

    • High roof suspended ceiling and window system (equipment: drills, hammers, lasers).

    Items listed in red: Please note that this activity may potentially disrupt the pedestrian pathways and/or the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project

  • Construction Alert #75

    950512 SSC Construction Alert #75

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas on April 17th:

    Levels 1, 2, 3, and Roof

    • Electrical and low voltage rough-ins (equipment: drills, band saws, hammers);
    • Tiered seating framing (equipment: cutoff saws, skill saws, grinders, drills, powder actuated tools, hammers);
    • Window glazing (equipment: boom lifts, drills);
    • Ceiling grid install (equipment: scissor lifts, drills).

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of April 19th through April 24th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift);

    Site

    • South fire road light pole base concrete (equipment: concrete truck, vibratory equipment);
    • East and South exterior site grading and formwork (equipment: dump trucks, bobcat, excavator, vibratory equipment, hammers, skill saws);
    • Path of travel improvements at Parking Lot 1 – forming and concrete (equipment: concrete trucks, concrete pump, skip loader, vibratory equipment);
    • Please be advised that the construction fencing layout was updated to incorporate the accessibility improvements for the path of travel to Parking Lot 1, at Parking Lot 1, and at the West Campus Drive bus station. Some of the associated pedestrian paths will be temporarily impacted, please see updated maps below;
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards and the South fire lane. Portions of the pedestrian paths at CHASS INT S, Student Services and adjacent to Humanities/Sproul will be temporarily impacted, please see map below.

    Level 1

    • Framing – dining services area (equipment: cutoff saws, grinders, drills, powder actuated tools, hammers);
    • Electrical and lighting (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior storefront installation (equipment: scissor lifts, chop saws, drills, hammers);
    • Ceiling grid and sprinkler trim install (equipment: scissor lifts, drills);
    • Painting drywall finishes (equipment: scissor lifts);
    • Exterior sheet metal (equipment: boom lifts, drills).

    Level 2

    • Electrical and lighting (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Tiered seating sureboard installation in lecture halls (equipment: cutoff saws, skill saws, grinders, drills, powder actuated tools, hammers);
    • Restroom faucets and sinks (equipment: grinders, vacuums, drills);
    • Ceiling grid and sprinkler trim install (equipment: scissor lifts, drills);
    • Painting drywall finishes (equipment: scissor lifts);
    • Exterior windows and curtain wall – glass installation (equipment: boom lifts, drills);
    • Exterior sheet metal (equipment: boom lifts, drills).

    Level 3

    • Electrical and lighting (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Tiered seating framing and sure board installation in lecture halls (equipment: cutoff saws, grinders, drills, powder actuated tools, hammers);
    • Restroom tile installation (equipment: vacuums);
    • Ceiling grid and sprinkler trim install (equipment: scissor lifts, drills);
    • Painting drywall finishes (equipment: scissor lifts);
    • High roof scaffold lowering (equipment: forklift);
    • Exterior windows and curtain wall – glass installation (equipment: boom lifts, drills);
    • Exterior sheet metal (equipment: boom lifts, drills).

    Roof

    • High roof suspended ceiling and window system (equipment: drills, hammers, lasers).

    Items listed in red: Please note that this activity may potentially disrupt the pedestrian pathways and/or the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #76

    950512 SSC Construction Alert #76

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas on April 24th:

    Levels 1, 2, 3, and Roof

    • Electrical trim and cabling (equipment: scissor lifts, drills, band saws, hammers);
    • Ceiling panel installation (equipment: scissor lifts, drills).

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of April 26th through May 1st:

    General

    • Material deliveries (equipment: trucks and trailers, forklift);

    Site

    • East and South exterior site grading and formwork (equipment: dump trucks, bobcat, excavator, vibratory equipment, hammers, skill saws);
    • Accessibility improvements at Parking Lot 1 – forming and concrete (equipment: concrete trucks, concrete pump, skip loader, vibratory equipment);
    • Please be advised that the construction fencing layout was updated to incorporate the accessibility improvements for the path of travel to Parking Lot 1 and at Parking Lot 1. Some of the associated pedestrian paths will be temporarily impacted, please see updated maps below;
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards and the South fire lane. Portions of the pedestrian paths at CHASS INT S, Student Services and adjacent to Humanities/Sproul will be temporarily impacted, please see map below.

    Level 1

    • Framing – dining services area (equipment: cutoff saws, grinders, drills, powder actuated tools, hammers);
    • Electrical and lighting (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior storefront installation (equipment: scissor lifts, chop saws, drills, hammers);
    • Ceiling install (equipment: scissor lifts, drills);
    • Painting drywall finishes (equipment: scissor lifts);
    • Exterior curtain wall – glass installation (equipment: boom lifts, drills);
    • Exterior sheet metal (equipment: boom lifts, drills).

    Level 2

    • Electrical and lighting (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior storefront installation (equipment: scissor lifts, chop saws, drills, hammers);
    • Tiered seating sureboard installation in lecture halls (equipment: cutoff saws, skill saws, grinders, drills, powder actuated tools, hammers);
    • Ceiling grid and sprinkler trim install (equipment: scissor lifts, drills);
    • Painting drywall finishes (equipment: scissor lifts);
    • Exterior curtain wall – glass installation (equipment: boom lifts, drills);
    • Exterior sheet metal (equipment: boom lifts, drills).

    Level 3

    • Electrical and lighting (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior storefront installation (equipment: scissor lifts, chop saws, drills, hammers);
    • Tiered seating framing and sureboard installation in lecture halls (equipment: cutoff saws, grinders, drills, powder actuated tools, hammers);
    • Restroom tile installation (equipment: vacuums);
    • Ceiling grid and sprinkler trim install (equipment: scissor lifts, drills);
    • Painting drywall finishes (equipment: scissor lifts);
    • High roof scaffold lowering (equipment: forklift);
    • Exterior curtain wall – glass installation (equipment: boom lifts, drills);
    • Exterior sheet metal (equipment: boom lifts, drills).

    Roof

    • High roof suspended ceiling and window system (equipment: drills, hammers, lasers).

    Items listed in red: Please note that this activity may potentially disrupt the pedestrian pathways and/or the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #77

    950512 SSC Construction Alert #77

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas on May 1st:

    Levels 1, 2, 3, and Roof

    • Electrical/AV/Data (equipment: scissor lifts, drills, band saws, hammers);
    • Glass installation (equipment: boom lifts, drills);
    • Deck insulation (equipment: scissor lifts, drills, hammers).

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of May 3rd through May 8th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift);
    • Material hoist removal (equipment: cranes, drills, hammers).

    Site

    • East and South exterior site grading, formwork and concrete (equipment: dump trucks, concrete trucks, bobcat, excavator, vibratory equipment, hammers, skill saws);
    • Accessibility improvements at Parking Lot 1 – concrete (equipment: concrete trucks, concrete pump, vibratory equipment);
    • Please be advised that the construction fencing layout was updated to incorporate the accessibility improvements for the path of travel to Parking Lot 1 and at Parking Lot 1. Some of the associated pedestrian paths will be temporarily impacted, please see updated maps below;
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards and the South fire lane. Portions of the pedestrian paths at CHASS INT S, Student Services and adjacent to Humanities/Sproul will be temporarily impacted, please see map below.

    Level 1

    • HVAC and electrical – dining services area (equipment: scissor lifts, cutoff saws, grinders, drills, powder actuated tools, hammers);
    • Electrical and lighting (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior storefront installation (equipment: scissor lifts, chop saws, drills, hammers);
    • Ceiling grid, sprinkler trim, light fixtures and low voltage device installation (equipment: scissor lifts, drills);
    • Painting drywall finishes (equipment: scissor lifts);
    • Exterior window pressure bar and caulking (equipment: boom lifts, hammers);
    • Exterior glass installation (equipment: boom lifts, drills);
    • Exterior door frames (equipment: drills, hammers);
    • Exterior sheet metal (equipment: boom lifts, drills).

    Level 2

    • Electrical and lighting (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior storefront installation (equipment: scissor lifts, chop saws, drills, hammers);
    • Tiered seating sureboard installation in lecture halls (equipment: cutoff saws, skill saws, grinders, drills, powder actuated tools, hammers);
    • Ceiling grid, sprinkler trim, light fixtures and low voltage device installation (equipment: scissor lifts, drills);
    • Painting drywall finishes (equipment: scissor lifts);
    • Exterior glass installation (equipment: boom lifts, drills);
    • Exterior door frames (equipment: drills, hammers);
    • Exterior sheet metal (equipment: boom lifts, drills).

    Level 3

    • Electrical and lighting (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior storefront installation (equipment: scissor lifts, chop saws, drills, hammers);
    • Tiered seating framing and sureboard installation in lecture halls (equipment: cutoff saws, grinders, drills, powder actuated tools, hammers);
    • Restroom tile installation (equipment: vacuums);
    • Ceiling grid, sprinkler trim, light fixtures and low voltage device installation (equipment: scissor lifts, drills);
    • Painting drywall finishes (equipment: scissor lifts);
    • High roof scaffold lowering (equipment: forklift);
    • Exterior glass installation (equipment: boom lifts, drills);
    • Exterior door frames (equipment: drills, hammers);
    • Exterior sheet metal (equipment: boom lifts, drills).

    Roof

    • High roof window system (equipment: drills, hammers, lasers).

    Items listed in red: Please note that this activity may potentially disrupt the pedestrian pathways and/or the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • 950512 SSC Construction Alert #78

    950512 SSC Construction Alert #78

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas on May 8th:

    Levels 1, 2, 3, and Roof

    • Electrical/AV/Data (equipment: scissor lifts, drills, band saws, hammers);
    • Glass installation (equipment: boom lifts, drills);
    • Deck insulation (equipment: scissor lifts, drills, hammers);
    • Stair painting (equipment: airless sprayer, grinders, sanders).

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of May 10th through May 15th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift);

    Site

    • East and South exterior site grading, formwork and concrete (equipment: dump trucks, concrete trucks, bobcat, excavator, vibratory equipment, hammers, skill saws);
    • East exterior underground piping (equipment: excavator, vibratory equipment);
    • East exterior framing and plaster (equipment: drills, plaster mixers, hammers);
    • Accessibility improvements at Parking Lot 1 – concrete and paving (equipment: concrete trucks, concrete pump, dump trucks, grinders, airless sprayer, vibratory equipment);
    • Please be advised that the construction fencing layout was updated to incorporate the accessibility improvements for the path of travel to Parking Lot 1 and at Parking Lot 1. Some of the associated pedestrian paths will be temporarily impacted, please see updated maps below;
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards and the South fire lane. Portions of the pedestrian paths at CHASS INT S, Student Services and adjacent to Humanities/Sproul will be temporarily impacted, please see map below.

    Level 1

    • HVAC and electrical – dining services area (equipment: scissor lifts, cutoff saws, grinders, drills, powder actuated tools, hammers);
    • Electrical and lighting (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior storefront installation (equipment: scissor lifts, chop saws, drills, hammers);
    • Ceiling grid, sprinkler trim, light fixtures and low voltage device installation (equipment: scissor lifts, drills);
    • Wood slat ceiling install (equipment: scissor lifts);
    • Painting drywall finishes (equipment: scissor lifts);
    • Exterior window pressure bar and caulking (equipment: boom lifts, hammers);
    • Exterior glass installation (equipment: boom lifts, drills);
    • Exterior door frames (equipment: drills, hammers);
    • Stair painting (equipment: airless sprayer, grinders, sanders).

    Level 2

    • Electrical and lighting (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior storefront installation (equipment: scissor lifts, chop saws, drills, hammers);
    • Fabric panel installation (equipment: drills, hammers, compressor, staple gun);
    • Ceiling grid, sprinkler trim, light fixtures and low voltage device installation (equipment: scissor lifts, drills);
    • Wood slat ceiling install (equipment: scissor lifts);
    • Painting drywall finishes (equipment: scissor lifts);
    • Exterior glass installation (equipment: boom lifts, drills);
    • Exterior door frames (equipment: drills, hammers);
    • Stair painting (equipment: airless sprayer, grinders, sanders).

    Level 3

    • Electrical and lighting (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior storefront installation (equipment: scissor lifts, chop saws, drills, hammers);
    • Tiered seating framing and sureboard installation in lecture halls (equipment: cutoff saws, grinders, drills, powder actuated tools, hammers);
    • Restroom plumbing finishes;
    • Ceiling grid, sprinkler trim, light fixtures and low voltage device installation (equipment: scissor lifts, drills);
    • Painting drywall finishes (equipment: scissor lifts);
    • High roof scaffold lowering (equipment: forklift);
    • Exterior glass installation (equipment: boom lifts, drills);
    • Exterior door frames (equipment: drills, hammers);
    • Stair painting (equipment: airless sprayer, grinders, sanders).
    • Exterior sheet metal (equipment: boom lifts, drills).

    Roof

    • High roof window system (equipment: drills, hammers, lasers).

    Items listed in red: Please note that this activity may potentially disrupt the pedestrian pathways and/or the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #79

    950512 SSC Construction Alert #79

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas on May 15th:

    Levels 1, 2, 3, and Roof

    • Electrical/AV/Data (equipment: scissor lifts, drills, band saws, hammers);
    • Glass installation (equipment: boom lifts, drills).

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of May 17th through May 22nd:

    General

    • Material deliveries (equipment: trucks and trailers, forklift);

    Site

    • East and South exterior site grading, formwork and concrete (equipment: dump trucks, concrete trucks, bobcat, excavator, vibratory equipment, hammers, skill saws);
    • East exterior site walls (equipment: excavator, jumping jack, skill saws, hammers);
    • East exterior underground piping (equipment: excavator, vibratory equipment);
    • East exterior plaster (equipment: drills, plaster mixers, hammers, plaster gun);
    • Accessibility improvements at Parking Lot 1 – slurry and striping (equipment: grinders, airless sprayer);
    • Please be advised that the southern entrance to parking Lot 1 will be temporarily closed on Monday, May 17th from approximately noon to end of day. Access to/from Lot 1 will be rerouted to the northern entrance and the appropriate traffic control will be provided. Please see attached map.
    • Please be advised that the construction fencing layout was updated to incorporate the accessibility improvements for the path of travel to Parking Lot 1 and at Parking Lot 1. Some of the associated pedestrian paths will be temporarily impacted, please see updated maps below;
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards and the South fire lane. Portions of the pedestrian paths at CHASS INT S, Student Services and adjacent to Humanities/Sproul will be temporarily impacted, please see map below.

    Level 1

    • HVAC and electrical – dining services area (equipment: scissor lifts, cutoff saws, grinders, drills, powder actuated tools, hammers);
    • Electrical and lighting (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior storefront installation (equipment: scissor lifts, chop saws, drills, hammers);
    • Ceiling grid, sprinkler trim, light fixtures and low voltage device installation (equipment: scissor lifts, drills);
    • Carpet installation (equipment: sanders);
    • Toilet partition and accessories (equipment: drills, hammers, lasers);
    • Interior door frames (equipment: scissor lifts, chop saws, drills, hammers);
    • Wood slat ceiling install (equipment: scissor lifts);
    • Painting drywall finishes (equipment: scissor lifts);
    • Exterior window pressure bar and caulking (equipment: boom lifts, hammers);
    • Exterior glass installation (equipment: boom lifts, drills);
    • Exterior door frames (equipment: drills, hammers);
    • Stair painting (equipment: airless sprayer, grinders, sanders).

    Level 2

    • Electrical and lighting (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior storefront installation (equipment: scissor lifts, chop saws, drills, hammers);
    • Fabric panel installation (equipment: drills, hammers, compressor, staple gun);
    • Ceiling grid, sprinkler trim, light fixtures and low voltage device installation (equipment: scissor lifts, drills);
    • Toilet partition and accessories (equipment: drills, hammers, lasers);
    • Wood slat ceiling install (equipment: scissor lifts);
    • Interior door frames (equipment: scissor lifts, chop saws, drills, hammers);
    • Painting drywall finishes (equipment: scissor lifts);
    • Exterior glass installation (equipment: boom lifts, drills);
    • Stair painting (equipment: airless sprayer, grinders, sanders).

    Level 3

    • Electrical and lighting (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior storefront installation (equipment: scissor lifts, chop saws, drills, hammers);
    • Tiered seating framing and sureboard installation in lecture halls (equipment: cutoff saws, grinders, drills, powder actuated tools, hammers);
    • Restroom plumbing finishes;
    • Interior door frames (equipment: scissor lifts, chop saws, drills, hammers);
    • Ceiling grid, sprinkler trim, light fixtures and low voltage device installation (equipment: scissor lifts, drills);
    • Floor polish (equipment: grinders, sanders);
    • Toilet partition and accessories (equipment: drills, hammers, lasers);
    • Painting drywall finishes (equipment: scissor lifts);
    • Exterior glass installation (equipment: boom lifts, drills);
    • Stair painting (equipment: airless sprayer, grinders, sanders).

    Roof

    • High roof window system (equipment: drills, hammers, lasers);
    • Clerestory sheet metal closures (equipment: boom lifts, drills, hammers).

    Items listed in red: Please note that this activity may potentially disrupt the pedestrian pathways and/or the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #80

    950512 SSC Construction Alert #80

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas on May 22nd:

    Levels 1, 2, 3, and Roof

    • Electrical/AV/Data (equipment: scissor lifts, drills, band saws, hammers);
    • Floor preparation;
    • Glass installation (equipment: boom lifts, drills).

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of May 24th through May 29th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift);

    Site

    • East and South exterior site grading, formwork and concrete (equipment: dump trucks, concrete trucks, bobcat, excavator, vibratory equipment, hammers, skill saws);
    • East exterior site walls (equipment: excavator, jumping jack, skill saws, hammers);
    • East exterior lath and plaster (equipment: drills, plaster mixers, hammers, plaster gun);
    • Please be advised that the construction fencing layout was updated to incorporate the accessibility improvements for the path of travel to Parking Lot 1 and at Parking Lot 1. Some of the associated pedestrian paths will be temporarily impacted, please see updated maps below;
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards. Portions of the pedestrian paths at CHASS INT S and Student Services will be temporarily impacted, please see map below.

    Level 1

    • Taping and paint – dining services area (equipment: scissor lifts, airless sprayers);
    • Electrical and lighting (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior storefront installation (equipment: scissor lifts, chop saws, drills, hammers);
    • Ceiling tiles, sprinkler trim, light fixtures and low voltage device installation (equipment: scissor lifts, drills);
    • Carpet installation (equipment: sanders);
    • Toilet partitions and accessories (equipment: drills, hammers, lasers);
    • Interior door frames (equipment: scissor lifts, chop saws, drills, hammers);
    • Wood slat ceiling install (equipment: scissor lifts);
    • Painting drywall finishes (equipment: scissor lifts);
    • Exterior window pressure bar and metal panel caulking (equipment: boom lifts, hammers);
    • Exterior glass installation (equipment: boom lifts, drills);
    • Exterior door frames (equipment: drills, hammers);
    • Stair painting (equipment: airless sprayer, grinders, sanders).

    Level 2

    • Electrical and lighting (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior storefront installation (equipment: scissor lifts, chop saws, drills, hammers);
    • Fabric panel installation (equipment: drills, hammers, compressor, staple gun);
    • Ceiling tiles, sprinkler trim, light fixtures and low voltage device installation (equipment: scissor lifts, drills);
    • Toilet partitions and accessories (equipment: drills, hammers, lasers);
    • Wood slat ceiling install (equipment: scissor lifts);
    • Interior door frames (equipment: scissor lifts, chop saws, drills, hammers);
    • Painting drywall finishes (equipment: scissor lifts);
    • Exterior window pressure bar and metal panel caulking (equipment: boom lifts, hammers);
    • Exterior glass installation (equipment: boom lifts, drills);
    • Stair painting (equipment: airless sprayer, grinders, sanders).

    Level 3

    • Electrical and lighting (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior storefront installation (equipment: scissor lifts, chop saws, drills, hammers);
    • Tiered seating framing and sureboard installation in lecture halls (equipment: cutoff saws, grinders, drills, powder actuated tools, hammers);
    • Restroom plumbing finishes;
    • Interior door frames (equipment: scissor lifts, chop saws, drills, hammers);
    • Ceiling tiles, sprinkler trim, light fixtures and low voltage device installation (equipment: scissor lifts, drills);
    • Floor polish (equipment: grinders, sanders);
    • Toilet partitions and accessories (equipment: drills, hammers, lasers);
    • Painting drywall finishes (equipment: scissor lifts);
    • Exterior glass installation (equipment: boom lifts, drills);
    • Exterior window pressure bar and metal panel caulking (equipment: boom lifts, hammers);
    • Stair painting (equipment: airless sprayer, grinders, sanders).

    Roof

    • High roof window system (equipment: drills, hammers, lasers);
    • Clerestory sheet metal closures (equipment: boom lifts, drills, hammers).

    Items listed in red: Please note that this activity may potentially disrupt the pedestrian pathways and/or the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #81

    950512 SSC Construction Alert #81

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of June 1st through June 5th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift);

    Site

    • East and South exterior site grading, formwork and concrete (equipment: dump trucks, concrete trucks, bobcat, excavator, vibratory equipment, hammers, skill saws);
    • East exterior site walls (equipment: excavator, jumping jack, skill saws, hammers);
    • East exterior framing and plaster (equipment: drills, plaster mixers, hammers, plaster gun);
    • East exterior underground piping (equipment: excavator, jumping jack);
    • Please be advised that the construction fencing layout was updated to incorporate the accessibility improvements for the path of travel to Parking Lot 1 and at Parking Lot 1. Some of the associated pedestrian paths will be temporarily impacted, please see updated maps below;
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards. Portions of the pedestrian paths at CHASS INT S and Student Services will be temporarily impacted, please see map below.

    Level 1

    • Drywall, HVAC and electrical – dining services area (equipment: scissor lifts, metal cutoff saws, grinders, drills, powder actuated tools);
    • Electrical and lighting (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior storefront installation (equipment: scissor lifts, chop saws, drills, hammers);
    • Ceiling tiles, sprinkler trim, light fixtures and low voltage device installation (equipment: scissor lifts, drills);
    • Carpet installation (equipment: sanders);
    • Toilet partitions and accessories (equipment: drills, hammers, lasers);
    • Interior door frames (equipment: scissor lifts, chop saws, drills, hammers);
    • Wood slat ceiling install (equipment: scissor lifts);
    • Painting drywall finishes and doors (equipment: scissor lifts, airless sprayer);
    • Exterior window pressure bar and metal panel caulking (equipment: boom lifts, hammers);
    • Exterior door frames (equipment: drills, hammers);
    • Stair painting (equipment: airless sprayer, grinders, sanders).

    Level 2

    • Electrical and lighting (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior storefront installation (equipment: scissor lifts, chop saws, drills, hammers);
    • Fabric panel installation (equipment: drills, hammers, compressor, staple gun);
    • Ceiling tiles, sprinkler trim, light fixtures and low voltage device installation (equipment: scissor lifts, drills);
    • Toilet partitions and accessories (equipment: drills, hammers, lasers);
    • Wood slat ceiling install (equipment: scissor lifts);
    • Interior door frames (equipment: scissor lifts, chop saws, drills, hammers);
    • Painting drywall finishes and doors (equipment: scissor lifts, airless sprayer);
    • Exterior window pressure bar and metal panel caulking (equipment: boom lifts, hammers);
    • Stair painting (equipment: airless sprayer, grinders, sanders).

    Level 3

    • Electrical and lighting (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior storefront installation (equipment: scissor lifts, chop saws, drills, hammers);
    • Tiered seating sureboard installation in lecture halls (equipment: cutoff saws, grinders, drills, powder actuated tools, hammers);
    • Restroom plumbing finishes;
    • Interior door frames (equipment: scissor lifts, chop saws, drills, hammers);
    • Ceiling tiles, sprinkler trim, light fixtures and low voltage device installation (equipment: scissor lifts, drills);
    • Toilet partitions and accessories (equipment: drills, hammers, lasers);
    • Painting drywall finishes and doors (equipment: scissor lifts, airless sprayer);
    • Exterior window pressure bar and metal panel caulking (equipment: boom lifts, hammers);
    • Stair painting (equipment: airless sprayer, grinders, sanders).

    Roof

    • High roof window system (equipment: drills, hammers, lasers);
    • Clerestory sheet metal closures (equipment: boom lifts, drills, hammers).

    Items listed in red: Please note that this activity may potentially disrupt the pedestrian pathways and/or the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #82

    950512 SSC Construction Alert #82

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas on June 5th:

    Levels 1, 2, 3, and Roof

    • Electrical/AV/Data (equipment: scissor lifts, drills, band saws, hammers);
    • Glass installation (equipment: boom lifts, drills).

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of June 7th through June 12th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift);

    Site

    • East and South exterior site grading, formwork and concrete (equipment: dump trucks, concrete trucks, bobcat, excavator, vibratory equipment, hammers, skill saws);
    • East exterior site walls (equipment: excavator, jumping jack, skill saws, hammers);
    • East exterior plaster (equipment: drills, plaster mixers, hammers, plaster gun);
    • East exterior underground piping (equipment: excavator, jumping jack);
    • Please be advised that the construction fencing layout was updated to incorporate the accessibility improvements for the path of travel to Parking Lot 1 and at Parking Lot 1. Some of the associated pedestrian paths will be temporarily impacted, please see updated maps below;
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards. Portions of the pedestrian paths at CHASS INT S and Student Services will be temporarily impacted, please see map below.

    Level 1

    • Drywall, HVAC and electrical – dining services area (equipment: scissor lifts, metal cutoff saws, grinders, drills, powder actuated tools);
    • Electrical and lighting (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior storefront installation (equipment: scissor lifts, chop saws, drills, hammers);
    • Ceiling tiles, sprinkler trim, light fixtures and low voltage device installation (equipment: scissor lifts, drills);
    • Carpet installation (equipment: sanders);
    • Toilet partitions and accessories (equipment: drills, hammers, lasers);
    • Interior door frames (equipment: scissor lifts, chop saws, drills, hammers);
    • Wood slat ceiling install (equipment: scissor lifts);
    • Painting drywall finishes and doors (equipment: scissor lifts, airless sprayer);
    • Exterior window pressure bar and metal panel caulking (equipment: boom lifts, hammers);
    • Exterior door frames (equipment: drills, hammers);
    • Stair painting (equipment: airless sprayer, grinders, sanders).

    Level 2

    • Electrical and lighting (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior storefront installation (equipment: scissor lifts, chop saws, drills, hammers);
    • Fabric panel installation (equipment: drills, hammers, compressor, staple gun);
    • Ceiling tiles, sprinkler trim, light fixtures and low voltage device installation (equipment: scissor lifts, drills);
    • Toilet partitions and accessories (equipment: drills, hammers, lasers);
    • Wood slat ceiling install (equipment: scissor lifts);
    • Interior door frames (equipment: scissor lifts, chop saws, drills, hammers);
    • Painting drywall finishes and doors (equipment: scissor lifts, airless sprayer);
    • Exterior window pressure bar and metal panel caulking (equipment: boom lifts, hammers);
    • Stair painting (equipment: airless sprayer, grinders, sanders).

    Level 3

    • Electrical and lighting (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior storefront installation (equipment: scissor lifts, chop saws, drills, hammers);
    • Tiered seating sureboard installation in lecture halls (equipment: cutoff saws, grinders, drills, powder actuated tools, hammers);
    • Restroom plumbing finishes;
    • Interior door frames (equipment: scissor lifts, chop saws, drills, hammers);
    • Ceiling tiles, sprinkler trim, light fixtures and low voltage device installation (equipment: scissor lifts, drills);
    • Toilet partitions and accessories (equipment: drills, hammers, lasers);
    • Painting drywall finishes and doors (equipment: scissor lifts, airless sprayer);
    • Exterior window pressure bar and metal panel caulking (equipment: boom lifts, hammers);
    • Stair painting (equipment: airless sprayer, grinders, sanders).

    Roof

    • High roof window system (equipment: drills, hammers, lasers);
    • Clerestory sheet metal closures (equipment: boom lifts, drills, hammers).

    Items listed in red: Please note that this activity may potentially disrupt the pedestrian pathways and/or the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #83

    950512 SSC Construction Alert #83

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas on June12th:

    Levels 1, 2, 3, and Roof

    • Electrical/AV/Data (equipment: scissor lifts, drills, band saws, hammers);
    • Glass installation (equipment: boom lifts, drills).

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of June 14th through June 19th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift);

    Site

    • East and South exterior site grading, formwork and concrete (equipment: dump trucks, concrete trucks, bobcat, excavator, vibratory equipment, hammers, skill saws);
    • East exterior site walls (equipment: excavator, jumping jack, skill saws, hammers);
    • East exterior plaster (equipment: drills, plaster mixers, hammers, plaster gun);
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards. Portions of the pedestrian paths at CHASS INT S and Student Services will be temporarily impacted, please see map below.

    Level 1

    • Drywall, HVAC and electrical – dining services area (equipment: scissor lifts, metal cutoff saws, grinders, drills, powder actuated tools);
    • Electrical and lighting (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior storefront installation (equipment: scissor lifts, chop saws, drills, hammers);
    • Ceiling tiles, sprinkler trim, light fixtures and low voltage device installation (equipment: scissor lifts, drills);
    • Carpet installation (equipment: sanders);
    • Toilet partitions and accessories (equipment: drills, hammers, lasers);
    • Interior door frames (equipment: scissor lifts, chop saws, drills, hammers);
    • Wood slat ceiling install (equipment: scissor lifts);
    • Painting drywall finishes and doors (equipment: scissor lifts, airless sprayer);
    • Exterior window pressure bar and metal panel caulking (equipment: boom lifts, hammers);
    • Exterior door frames (equipment: drills, hammers);
    • Stair painting (equipment: airless sprayer, grinders, sanders).

    Level 2

    • Electrical and lighting (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Fabric panel installation (equipment: drills, hammers, compressor, staple gun);
    • Ceiling tiles, sprinkler trim, light fixtures and low voltage device installation (equipment: scissor lifts, drills);
    • Toilet partitions and accessories (equipment: drills, hammers, lasers);
    • Wood slat ceiling install (equipment: scissor lifts);
    • Interior door frames (equipment: scissor lifts, chop saws, drills, hammers);
    • Painting drywall finishes and doors (equipment: scissor lifts, airless sprayer);
    • Exterior window pressure bar and metal panel caulking (equipment: boom lifts, hammers);
    • Stair painting (equipment: airless sprayer, grinders, sanders).

    Level 3

    • Electrical and lighting (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Restroom plumbing finishes;
    • Interior door frames (equipment: scissor lifts, chop saws, drills, hammers);
    • Ceiling tiles, sprinkler trim, light fixtures and low voltage device installation (equipment: scissor lifts, drills);
    • Toilet partitions and accessories (equipment: drills, hammers, lasers);
    • Painting drywall finishes and doors (equipment: scissor lifts, airless sprayer);
    • Exterior window pressure bar and metal panel caulking (equipment: boom lifts, hammers);
    • Stair painting (equipment: airless sprayer, grinders, sanders).

    Roof

    • High roof window system (equipment: drills, hammers, lasers);
    • Clerestory sheet metal closures (equipment: boom lifts, drills, hammers).

    Items listed in red: Please note that this activity may potentially disrupt the pedestrian pathways and/or the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • 950512 SSC Construction Alert #84

    950512 SSC Construction Alert #84

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas on June 19th:

    Levels 1, 2, 3, and Roof

    • Electrical/AV/Data (equipment: scissor lifts, drills, band saws, hammers);
    • Glass installation (equipment: boom lifts, drills);
    • Flooring installation (equipment: sanders);
    • Fabric panel installation (equipment: drills, hammers, compressor, staple gun);
    • Exterior sheet metal (equipment: boom lifts, drills).

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of June 21st through June 26th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift);

    Site

    • East and South exterior site grading, formwork and concrete (equipment: dump trucks, concrete trucks, bobcat, excavator, vibratory equipment, hammers, skill saws);
    • Landscaping Prep (equipment: gradall, delivery trucks);
    • Site lighting (equipment: gradall, drills);
    • Sproul Hall trash enclosure – demo (equipment: skip loader, dump truck, saws);
    • Please be advised that the construction fencing layout will be updated to incorporate the improvements at the Sproul Hall loading dock area related to the new trash enclosure. Portions of the pedestrian paths and loading dock parking at Sproul Hall will be temporarily impacted, please see map below.
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards. Portions of the pedestrian paths at CHASS INT S and Student Services will be temporarily impacted, please see map below.

    Level 1

    • Electrical (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior window installation (equipment: scissor lifts, drills);
    • Interior doors (equipment: scissor lifts, chop saws, drills, hammers);
    • Painting touch-ups (equipment: scissor lifts, airless sprayer);
    • Exterior window trim and sunshades (equipment: boom lifts, grinders, drills, hammers);
    • Ceiling tile installation (equipment: scissor lifts);
    • HVAC testing and air balance (equipment: scissor lifts).

    Level 2

    • Electrical (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior window installation (equipment: scissor lifts, drills);
    • Interior doors (equipment: scissor lifts, chop saws, drills, hammers);
    • Painting touch-ups (equipment: scissor lifts, airless sprayer);
    • Exterior window trim and sunshades (equipment: boom lifts, grinders, drills, hammers);
    • HVAC testing and air balance (equipment: scissor lifts);
    • Lecture Hall seating and tables installation (equipment: drills, hammers, impact drivers);
    • Flooring installation (equipment: sanders);
    • Wood slat ceiling install (equipment: scissor lifts);

    Level 3

    • Electrical (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior window installation (equipment: scissor lifts, drills);
    • Interior doors (equipment: scissor lifts, chop saws, drills, hammers);
    • Painting touch-ups (equipment: scissor lifts, airless sprayer);
    • Exterior window trim and sunshades (equipment: boom lifts, grinders, drills, hammers);
    • HVAC testing and air balance (equipment: scissor lifts);
    • Lecture Hall seating and tables installation (equipment: drills, hammers, impact drivers);
    • Flooring installation (equipment: sanders);
    • Wood slat ceiling install (equipment: scissor lifts);

    Roof

    • Clerestory sheet metal closures (equipment: boom lifts, drills, hammers).

    Items listed in red: Please note that this activity may potentially disrupt the pedestrian pathways and/or the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #85

    950512 SSC Construction Alert #85

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas on June 26th:

    Levels 1, 2, 3, and Roof

    • Electrical/AV/Data (equipment: scissor lifts, drills, band saws, hammers);
    • Glazing (equipment: boom lifts, drills);
    • Flooring installation (equipment: sanders);
    • Fabric panel installation (equipment: drills, hammers, compressor, staple gun);
    • Painting (equipment: scissor lifts, airless sprayer);
    • Exterior sheet metal (equipment: boom lifts, drills).

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of June 28st through July 3rd:

    General

    • Material deliveries (equipment: trucks and trailers, forklift);

    Site

    • East and South exterior site grading, formwork and concrete (equipment: dump trucks, concrete trucks, bobcat, excavator, vibratory equipment, hammers, skill saws);
    • Landscaping Prep (equipment: gradall, delivery trucks);
    • Site lighting (equipment: gradall, drills);
    • Sproul Hall trash enclosure – footings (equipment: concrete trucks, vibratory equipment);
    • Please be advised that the construction fencing layout will be updated to incorporate the improvements at the Sproul Hall loading dock area related to the new trash enclosure. Portions of the pedestrian paths and loading dock parking at Sproul Hall will be temporarily impacted, please see map below.
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards. Portions of the pedestrian paths at CHASS INT S and Student Services will be temporarily impacted, please see map below.

    Level 1

    • Electrical (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior window shades installation (equipment: scissor lifts, drills);
    • Interior door hardware (equipment: drills, hammers);
    • Painting touch-ups (equipment: scissor lifts, airless sprayer);
    • Exterior window trim and sunshades (equipment: boom lifts, grinders, drills, hammers);
    • Ceiling tile installation (equipment: scissor lifts);
    • Conduit relocation (equipment: scissor lifts, bandsaws, drills);
    • Exterior window testing (equipment: boom lifts);
    • HVAC testing and air balance (equipment: scissor lifts).

    Level 2

    • Electrical (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior window shades installation (equipment: scissor lifts, drills);
    • Interior door hardware (equipment: drills, hammers);
    • Painting touch-ups (equipment: scissor lifts, airless sprayer);
    • Exterior window trim and sunshades (equipment: boom lifts, grinders, drills, hammers);
    • HVAC testing and air balance (equipment: scissor lifts);
    • Lecture Hall seating and tables installation (equipment: drills, hammers, impact drivers);
    • Flooring installation (equipment: sanders);
    • Exterior window testing (equipment: boom lifts);
    • Conduit relocation (equipment: scissor lifts, bandsaws, drills);
    • Wood slat ceiling install (equipment: scissor lifts);

    Level 3

    • Electrical (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior window shades installation (equipment: scissor lifts, drills);
    • Interior door hardware (equipment: drills, hammers);
    • Painting touch-ups (equipment: scissor lifts, airless sprayer);
    • Exterior window trim and sunshades (equipment: boom lifts, grinders, drills, hammers);
    • HVAC testing and air balance (equipment: scissor lifts);
    • Lecture Hall seating and tables installation (equipment: drills, hammers, impact drivers);
    • Flooring installation (equipment: sanders);
    • Exterior window testing (equipment: boom lifts);
    • Wood slat ceiling install (equipment: scissor lifts);

    Items listed in red: Please note that this activity may potentially disrupt the pedestrian pathways and/or the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

  • Construction Alert #86

    950512 SSC Construction Alert #86

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas on July 3rd:

    Levels 1, 2, 3, and Roof

    • Electrical/AV/Data (equipment: scissor lifts, drills, band saws, hammers);
    • Glazing (equipment: boom lifts, drills);
    • Flooring installation (equipment: sanders);
    • Fabric panel installation (equipment: drills, hammers, compressor, staple gun);
    • Conduit relocation (equipment: scissor lifts, bandsaws, drills).

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of July 5th through July 10th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift);

    Site

    • East and South exterior site grading, formwork and concrete (equipment: dump trucks, concrete trucks, bobcat, excavator, vibratory equipment, hammers, skill saws);
    • Landscaping Prep (equipment: gradall, delivery trucks);
    • Site lighting (equipment: gradall, drills);
    • Sproul Hall trash enclosure – footings (equipment: concrete trucks, vibratory equipment);
    • Please be advised that the construction fencing layout will be updated to incorporate the improvements at the Sproul Hall loading dock area related to the new trash enclosure. Portions of the pedestrian paths and loading dock parking at Sproul Hall will be temporarily impacted, please see map below.
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards. Portions of the pedestrian paths at CHASS INT S and Student Services will be temporarily impacted, please see map below.

    Level 1

    • Electrical (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior window shades and louvers installation (equipment: scissor lifts, drills);
    • Interior door hardware (equipment: drills, hammers);
    • Painting touch-ups (equipment: scissor lifts, airless sprayer);
    • Exterior window trim and sunshades (equipment: boom lifts, grinders, drills, hammers);
    • Conduit relocation (equipment: scissor lifts, bandsaws, drills);
    • HVAC testing and air balance (equipment: scissor lifts).

    Level 2

    • Electrical (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior window shades and louvers installation (equipment: scissor lifts, drills);
    • Interior door hardware (equipment: drills, hammers);
    • Painting touch-ups (equipment: scissor lifts, airless sprayer);
    • Exterior window trim and sunshades (equipment: boom lifts, grinders, drills, hammers);
    • HVAC testing and air balance (equipment: scissor lifts);
    • Lecture Hall seating and tables installation (equipment: drills, hammers, impact drivers);
    • Flooring installation (equipment: sanders);
    • Conduit relocation (equipment: scissor lifts, bandsaws, drills).

    Level 3

    • Electrical (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior window shades and louvers installation (equipment: scissor lifts, drills);
    • Interior door hardware (equipment: drills, hammers);
    • Painting touch-ups (equipment: scissor lifts, airless sprayer);
    • Exterior window trim and sunshades (equipment: boom lifts, grinders, drills, hammers);
    • HVAC testing and air balance (equipment: scissor lifts);
    • Lecture Hall seating and tables installation (equipment: drills, hammers, impact drivers);
    • Flooring installation (equipment: sanders);
    • Conduit relocation (equipment: scissor lifts, bandsaws, drills).

    Items listed in red: Please note that this activity may potentially disrupt the pedestrian pathways and/or the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #87

    950512 SSC Construction Alert #87

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas on July 10th:

    Levels 1, 2, 3, and Roof

    • Electrical/AV/Data (equipment: scissor lifts, drills, band saws, hammers);
    • Glazing (equipment: boom lifts, drills);
    • Flooring installation (equipment: sanders);
    • VFD installation (equipment: drills);
    • Conduit relocation (equipment: scissor lifts, bandsaws, drills).

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of July 12th through July 17th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift);

    Site

    • East and South exterior site grading, formwork and concrete (equipment: dump trucks, concrete trucks, bobcat, excavator, vibratory equipment, hammers, skill saws);
    • Landscaping Prep (equipment: gradall, delivery trucks);
    • Landscape planting (equipment: gradall);
    • Site lighting (equipment: gradall, drills);
    • Sproul Hall trash enclosure – grading and flatwork (equipment: concrete trucks, tractor, vibratory equipment);
    • Please be advised that the construction fencing layout will be updated to incorporate the improvements at the Sproul Hall loading dock area related to the new trash enclosure. Portions of the pedestrian paths and loading dock parking at Sproul Hall will be temporarily impacted, please see map below.
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards. Portions of the pedestrian paths at CHASS INT S and Student Services will be temporarily impacted, please see map below.

    Level 1

    • Electrical (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior window shades and louvers installation (equipment: scissor lifts, drills);
    • Interior door hardware (equipment: drills, hammers);
    • Painting touch-ups (equipment: scissor lifts, airless sprayer);
    • Exterior window trim and sunshades (equipment: boom lifts, grinders, drills, hammers);
    • Conduit relocation (equipment: scissor lifts, bandsaws, drills);
    • HVAC testing and air balance (equipment: scissor lifts).

    Level 2

    • Electrical (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior window shades and louvers installation (equipment: scissor lifts, drills);
    • Interior door hardware (equipment: drills, hammers);
    • Painting touch-ups (equipment: scissor lifts, airless sprayer);
    • Exterior window trim and sunshades (equipment: boom lifts, grinders, drills, hammers);
    • HVAC testing and air balance (equipment: scissor lifts);
    • Lecture Hall seating and tables installation (equipment: drills, hammers, impact drivers);
    • Flooring installation (equipment: sanders);
    • Conduit relocation (equipment: scissor lifts, bandsaws, drills).

    Level 3

    • Electrical (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior window shades and louvers installation (equipment: scissor lifts, drills);
    • Interior door hardware (equipment: drills, hammers);
    • Painting touch-ups (equipment: scissor lifts, airless sprayer);
    • Exterior window trim and sunshades (equipment: boom lifts, grinders, drills, hammers);
    • HVAC testing and air balance (equipment: scissor lifts);
    • Lecture Hall seating and tables installation (equipment: drills, hammers, impact drivers);
    • Flooring installation (equipment: sanders);
    • Conduit relocation (equipment: scissor lifts, bandsaws, drills).

    Items listed in red: Please note that this activity may potentially disrupt the pedestrian pathways and/or the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #88

    950512 SSC Construction Alert #88

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas on July 17th:

    Levels 1, 2, 3, and Roof

    • Electrical/AV/Data (equipment: scissor lifts, drills, band saws, hammers);
    • Glazing (equipment: boom lifts, drills);
    • Flooring installation (equipment: sanders);
    • Conduit relocation (equipment: scissor lifts, bandsaws, drills);
    • Trailer removal.

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of July 19th through July 24th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift);

    Site

    • Site grading, formwork and concrete (equipment: dump trucks, concrete trucks, bobcat, excavator, vibratory equipment, hammers, skill saws);
    • Demolition of mock-up and adjacent sidewalk (equipment: dump truck, concrete saw, breaker, hammers);
    • Landscaping Prep (equipment: gradall, delivery trucks);
    • Landscape planting (equipment: gradall);
    • Site lighting (equipment: gradall, drills);
    • Sproul Hall trash enclosure – grading and flatwork (equipment: concrete trucks, tractor, vibratory equipment);
    • Please be advised that the construction fencing layout will be updated to incorporate the improvements at the Sproul Hall loading dock area related to the new trash enclosure. Portions of the pedestrian paths and loading dock parking at Sproul Hall will be temporarily impacted, please see map below.
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards. Portions of the pedestrian paths at CHASS INT S and Student Services will be temporarily impacted, please see map below.

    Level 1

    • Electrical (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior window shades and louvers installation (equipment: scissor lifts, drills);
    • Interior door hardware (equipment: drills, hammers);
    • Painting touch-ups (equipment: scissor lifts, airless sprayer);
    • Exterior window trim and sunshades (equipment: boom lifts, grinders, drills, hammers);
    • Conduit relocation (equipment: scissor lifts, bandsaws, drills);
    • HVAC testing and air balance (equipment: scissor lifts);
    • AV testing;
    • Fire alarm pretesting.

    Level 2

    • Electrical (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior window shades and louvers installation (equipment: scissor lifts, drills);
    • Interior door hardware (equipment: drills, hammers);
    • Painting touch-ups (equipment: scissor lifts, airless sprayer);
    • Exterior window trim and sunshades (equipment: boom lifts, grinders, drills, hammers);
    • HVAC testing and air balance (equipment: scissor lifts);
    • Lecture Hall seating and tables installation (equipment: drills, hammers, impact drivers);
    • Flooring installation (equipment: sanders);
    • AV testing;
    • Fire alarm pretesting.

    Level 3

    • Electrical (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior window shades and louvers installation (equipment: scissor lifts, drills);
    • Interior door hardware (equipment: drills, hammers);
    • Painting touch-ups (equipment: scissor lifts, airless sprayer);
    • Exterior window trim and sunshades (equipment: boom lifts, grinders, drills, hammers);
    • HVAC testing and air balance (equipment: scissor lifts);
    • Lecture Hall seating and tables installation (equipment: drills, hammers, impact drivers);
    • Flooring installation (equipment: sanders);
    • Paseo casework (equipment: grinders, sanders, drills);
    • AV testing;
    • Fire alarm pretesting.

    Items listed in red: Please note that this activity may potentially disrupt the pedestrian pathways and/or the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #89

    950512 SSC Construction Alert #89

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas on July 24th:

    Levels 1, 2, 3, and Roof

    • Electrical/AV/Data (equipment: scissor lifts, drills, band saws, hammers);
    • Glazing (equipment: boom lifts, drills);
    • Flooring installation (equipment: sanders);
    • Conduit relocation (equipment: scissor lifts, bandsaws, drills);
    • Irrigation work.

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of July 26th through July 31st:

    General

    • Material deliveries (equipment: trucks and trailers, forklift);

    Site

    • Site grading, formwork and concrete (equipment: dump trucks, concrete trucks, bobcat, excavator, vibratory equipment, hammers, skill saws);
    • Landscaping Prep (equipment: gradall, delivery trucks);
    • Landscape planting (equipment: gradall);
    • Site lighting (equipment: gradall, drills);
    • Sproul Hall trash enclosure – grading and flatwork (equipment: concrete trucks, tractor, vibratory equipment);
    • Please be advised that the construction fencing layout will be updated to incorporate the improvements at the Sproul Hall loading dock area related to the new trash enclosure. Portions of the pedestrian paths and loading dock parking at Sproul Hall will be temporarily impacted, please see map below.
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards. Portions of the pedestrian paths at CHASS INT S and Student Services will be temporarily impacted, please see map below.

    Level 1

    • Electrical (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior window shades and louvers installation (equipment: scissor lifts, drills);
    • Interior door hardware (equipment: drills, hammers);
    • Painting touch-ups (equipment: scissor lifts, airless sprayer);
    • Exterior window trim and sunshades (equipment: boom lifts, grinders, drills, hammers);
    • Conduit relocation (equipment: scissor lifts, bandsaws, drills);
    • HVAC testing and air balance (equipment: scissor lifts);
    • AV testing;
    • Fire alarm pretesting.

    Level 2

    • Electrical (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior window shades and louvers installation (equipment: scissor lifts, drills);
    • Interior door hardware (equipment: drills, hammers);
    • Painting touch-ups (equipment: scissor lifts, airless sprayer);
    • Exterior window trim and sunshades (equipment: boom lifts, grinders, drills, hammers);
    • HVAC testing and air balance (equipment: scissor lifts);
    • Lecture Hall seating and tables installation (equipment: drills, hammers, impact drivers);
    • Flooring installation (equipment: sanders);
    • AV testing;
    • Fire alarm pretesting.

    Level 3

    • Electrical (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior window shades and louvers installation (equipment: scissor lifts, drills);
    • Interior door hardware (equipment: drills, hammers);
    • Painting touch-ups (equipment: scissor lifts, airless sprayer);
    • Exterior window trim and sunshades (equipment: boom lifts, grinders, drills, hammers);
    • HVAC testing and air balance (equipment: scissor lifts);
    • Lecture Hall seating and tables installation (equipment: drills, hammers, impact drivers);
    • Flooring installation (equipment: sanders);
    • AV testing;
    • Fire alarm pretesting.

    Items listed in red: Please note that this activity may potentially disrupt the pedestrian pathways and/or the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

  • Construction Alert #90

    950512 SSC Construction Alert #90

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas on July 31st:

    Levels 1, 2, 3, and Roof

    • Electrical/AV/Data (equipment: scissor lifts, drills, band saws, hammers);
    • Glazing (equipment: boom lifts, drills);
    • Flooring installation (equipment: sanders);
    • Conduit relocation (equipment: scissor lifts, bandsaws, drills);

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of August 2nd through August 7th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift);

    Site

    • Site grading, formwork and concrete (equipment: dump trucks, concrete trucks, bobcat, excavator, vibratory equipment, hammers, skill saws);
    • Landscape planting (equipment: gradall);
    • Site lighting (equipment: gradall, drills);
    • Sproul Hall trash enclosure – grading and flatwork (equipment: concrete trucks, tractor, vibratory equipment);
    • Please be advised that the construction fencing layout will be updated to incorporate the improvements at the Sproul Hall loading dock area related to the new trash enclosure. Portions of the pedestrian paths and loading dock parking at Sproul Hall will be temporarily impacted, please see map below.
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards. Portions of the pedestrian paths at CHASS INT S and Student Services will be temporarily impacted, please see map below.

    Level 1

    • Electrical (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior window shades and louvers installation (equipment: scissor lifts, drills);
    • Interior door hardware (equipment: drills, hammers);
    • Painting touch-ups (equipment: scissor lifts, airless sprayer);
    • Exterior window trim and sunshades (equipment: boom lifts, grinders, drills, hammers);
    • Conduit relocation (equipment: scissor lifts, bandsaws, drills);
    • HVAC testing and air balance (equipment: scissor lifts);
    • AV testing;
    • Fire alarm pretesting.

    Level 2

    • Electrical (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior window shades and louvers installation (equipment: scissor lifts, drills);
    • Interior door hardware (equipment: drills, hammers);
    • Painting touch-ups (equipment: scissor lifts, airless sprayer);
    • Exterior window trim and sunshades (equipment: boom lifts, grinders, drills, hammers);
    • HVAC testing and air balance (equipment: scissor lifts);
    • Lecture Hall seating and tables installation (equipment: drills, hammers, impact drivers);
    • Flooring installation (equipment: sanders);
    • AV testing;
    • Fire alarm pretesting.

    Level 3

    • Electrical (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior window shades and louvers installation (equipment: scissor lifts, drills);
    • Interior door hardware (equipment: drills, hammers);
    • Painting touch-ups (equipment: scissor lifts, airless sprayer);
    • Exterior window trim and sunshades (equipment: boom lifts, grinders, drills, hammers);
    • HVAC testing and air balance (equipment: scissor lifts);
    • Lecture Hall seating and tables installation (equipment: drills, hammers, impact drivers);
    • Flooring installation (equipment: sanders);
    • AV testing;
    • Fire alarm pretesting.

    Items listed in red: Please note that this activity may potentially disrupt the pedestrian pathways and/or the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #91

    950512 SSC Construction Alert #91

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas on August 7th:

    Levels 1, 2, 3, and Roof

    • Electrical/AV/Data (equipment: scissor lifts, drills, band saws, hammers);
    • Glazing (equipment: boom lifts, drills);
    • Flooring installation (equipment: sanders).

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of August 9th through August 14th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift);

    Site

    • Landscape planting (equipment: gradall);
    • Site lighting (equipment: gradall, drills);
    • Sproul Hall trash enclosure – steel enclosure (equipment: grinders, drills, hammers);
    • Please be advised that the construction fencing layout will be updated to incorporate the improvements at the Sproul Hall loading dock area related to the new trash enclosure. Portions of the pedestrian paths and loading dock parking at Sproul Hall will be temporarily impacted, please see map below.
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards. Portions of the pedestrian paths at CHASS INT S and Student Services will be temporarily impacted, please see map below.

    Level 1, 2, 3 and Roof

    • Electrical (equipment: scissor lifts, drills, band saws, hammers);
    • AV/Fire Alarm/Data (equipment: scissor lifts, drills, bandsaws, hammers);
    • Interior window shades and louvers installation (equipment: scissor lifts, drills);
    • Interior door hardware (equipment: drills, hammers);
    • Painting touch-ups (equipment: scissor lifts, airless sprayer);
    • Exterior window trim and sunshades (equipment: boom lifts, grinders, drills, hammers);
    • Lecture Hall Seating (equipment: drills, hammers, impact drivers);
    • HVAC testing and air balance (equipment: scissor lifts);
    • AV install and testing (equipment: scissor lifts, drills);
    • Furniture installation (equipment: drills);
    • Fire alarm pretesting.

    Items listed in red: Please note that this activity may potentially disrupt the pedestrian pathways and/or the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #92

    950512 SSC Construction Alert #92

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas on August 14th:

    Site and Levels 1, 2, 3 & Roof

    • Electrical trim (equipment: scissor lifts, drills, hammers);
    • Glazing (equipment: boom lifts, drills);
    • Landscape planting (equipment: gradall).

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of August 16th through August 21st:

    General

    • Material deliveries (equipment: trucks and trailers, forklift);

    Site

    • Landscape planting (equipment: gradall);
    • Site lighting (equipment: gradall, drills);
    • Sproul Hall trash enclosure – steel enclosure (equipment: grinders, drills, hammers);
    • Please be advised that the construction fencing layout will be updated to incorporate the improvements at the Sproul Hall loading dock area related to the new trash enclosure. Portions of the pedestrian paths and loading dock parking at Sproul Hall will be temporarily impacted, please see map below.
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards. Portions of the pedestrian paths at CHASS INT S and Student Services will be temporarily impacted, please see map below.

    Level 1, 2, 3 & Roof

    • Electrical (equipment: scissor lifts, drills, band saws, hammers);
    • Interior window shades and louvers installation (equipment: scissor lifts, drills);
    • Interior door hardware (equipment: drills, hammers);
    • Painting touch-ups (equipment: scissor lifts, airless sprayer);
    • Drywall patching (equipment: scissor lifts, drills);
    • Exterior window trim and sunshades (equipment: boom lifts, grinders, drills, hammers);
    • HVAC testing and air balance (equipment: scissor lifts);
    • AV install and testing (equipment: scissor lifts, drills);
    • Furniture installation (equipment: drills);
    • Fire alarm pretesting – horn and strobes.

    Items listed in red: Please note that this activity may potentially disrupt the pedestrian pathways and/or the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • 950512 SSC Construction Alert #93

    950512 SSC Construction Alert #93

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas on August 21st:

    Site and Levels 1, 2, 3 & Roof

    • Electrical (equipment: scissor lifts, drills, hammers);
    • Glazing (equipment: boom lifts, drills);
    • Landscape maintenance;
    • Precast treads installation.

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of August 23rd through August 27th:

    General

    • Material deliveries (equipment: trucks and trailers, forklift);

    Site

    • Landscape maintenance;
    • Sproul Hall trash enclosure – steel enclosure (equipment: grinders, drills, hammers);
    • Replacement of asphalt pavement at the South Fire Road – portion from West Campus Drive to Sproul Hall (equipment: asphalt grinder, bobcat, dump trucks, roller);
    • Please be advised that traffic will be temporarily unavailable at the South Fire Road – portion from West Campus Drive to Sproul Hall on Thursday August 27th and Friday August 28th.
    • Please be advised that the construction fencing layout will be updated to incorporate the improvements at the Sproul Hall loading dock area related to the new trash enclosure. Portions of the pedestrian paths and loading dock parking at Sproul Hall will be temporarily impacted, please see map below.
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards. Portions of the pedestrian paths at CHASS INT S and Student Services will be temporarily impacted, please see map below.

    Level 1, 2, 3 & Roof

    • Landscape maintenance;
    • Closure metal (equipment: scissor lifts, drills);
    • Interior door hardware (equipment: drills, hammers);
    • Painting touch-ups (equipment: scissor lifts, airless sprayer);
    • Drywall patching (equipment: scissor lifts, drills);
    • Exterior window trim and sunshades (equipment: boom lifts, grinders, drills, hammers);
    • AV install and testing (equipment: scissor lifts, drills);
    • SW Stair grating and precast tread installation (equipment: scissor lifts, grinders, welding machines, hammers, drills);
    • Furniture installation (equipment: drills);
    • Fire alarm testing – smoke testing, horn and strobes.

    Items listed in red: Please note that this activity may potentially disrupt the pedestrian pathways and/or the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.

  • Construction Alert #94

    950512 SSC Construction Alert #94

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas on August 28th:

    Site and Levels 1, 2, 3 & Roof

    • Electrical (equipment: drills, hammers);
    • Landscape maintenance;
    • Precast treads installation;
    • Final Cleaning.

    Please be advised that the following activities will be occurring on the Student Success Center site and adjacent areas during the week of August 30th through September 3rd:

    General

    • Material deliveries (equipment: trucks and trailers, forklift);

    Site

    • Landscape maintenance;
    • Sproul Hall trash enclosure – painting;
    • Please be advised that the construction fencing layout will be updated to incorporate the improvements at the Sproul Hall loading dock area related to the new trash enclosure. Portions of the pedestrian paths and loading dock parking at Sproul Hall will be temporarily impacted, please see map below.
    • Please be advised that the construction fencing layout was updated to incorporate the improvements at the Athletics and Student Services courtyards. Portions of the pedestrian paths at CHASS INT S and Student Services will be temporarily impacted, please see map below.

    Level 1, 2, 3 & Roof

    • Landscape maintenance;
    • Closure metal (equipment: scissor lifts, drills);
    • Painting touch-ups (equipment: scissor lifts, airless sprayer);
    • Shaft wall framing (equipment: scissor lifts, drills);
    • Trim and sunshades (equipment: boom lifts, grinders, drills, hammers);
    • AV programming;
    • Furniture installation (equipment: drills);
    • Exterior window washing;
    • Construction fence removal.

    Items listed in red: Please note that this activity may potentially disrupt the pedestrian pathways and/or the occupants in adjacent buildings;     

    Continuous noises on site: Construction equipment (back-up alarms), delivery trucks (back-up alarms), forklifts, generators, jackhammers, boom lifts, scissor lifts, saws, screw guns, and hammers.

     

     

    The Student Success Center Team recognizes that construction activities will at times pose inconveniences and disruption to the surrounding neighborhood. We thank you for your patience during construction of this project.